Eastern Platinum Limited · TSX:ELR

Eastern Platinum — Investor Presentation (June 2024)

29 slides from Eastern Platinum's investor presentation, June 2024

  1. Slide 1: Advancing PGM Projects in South Africa

    Advancing PGM Projects in South Africa June 2024 TSX:ELR | JSE:EPS

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements The information contained in this Presentation is provided for informational purposes only and does not constitute an offer to sell, or This Presentation contains certain statements that may be “forward-looking statements” or “forward-looking information” within the the so

  3. Slide 3: Eastplats Highlights

    Eastplats Highlights Eastern Platinum Limited (Eastplats) owns, directly egend impopo ush eld ompl ex and indirectly, a number of platinum group metals pera tions (PGM) and chrome assets in South Africa roje cts ilometres All Eastplats’ properties are situated within the auteng orth est Bushveld Com

  4. Slide 4: Achievements

    Achievements • May 2023 - Completes rights offering raising more than CAD $7 million; proceeds to support the restart of the Zandfontein underground at CRM • November 2023 - Commences blasting activities at the Crocodile River Mine, initiating the soft restart of the Zandfontein underground section

  5. Slide 5: Leadership Team

    Leadership Team MANAGEMENT BOARD SHARE CAPITAL May 13, 2024 George D. Dorin Director, Board Chair, Corporate Governance & Compensation Wanjin Yang Committee . Chair Chief Executive Officer . Mr. Yang is a senior exploration geologist with over 30 years’ of experience in major mineral Changyu (Charli

  6. Slide 6: Focus on PGMs

    Focus on PGMs Market Outlook1 • Internal combustion engines (ICE) to remain a large, but declining component of the drivetrain mix through the 2030s • Growth in vehicle production driven by battery electric vehicles (BEV) and fuel cell electric vehicles (FCEV), the latter of which still require PGMs

  7. Slide 7: PGM-Focused Portfolio

    PGM-Focused Portfolio Significant organic growth opportunities Project located on the western limb of the BCX, approx. Crocodile River Mine Reserves and Resources (UG2 Reef) RIVER MINE (CRM) 70km north-northwest from Johannesburg Proven and Probable: 14.58M tons (T) @ 3.68 g/t 4E CROCODILE • Current

  8. Slide 8: Crocodile River Mine – High Quality Chrome and PGMs

    Crocodile River Mine – High Quality Chrome and PGMs Project located on the western limb of the BCX, approx. Crocodile River Mine Reserves and Resources (UG2 Reef) RIVER MINE (CRM) 70km north-northwest from Johannesburg Proven and Probable: 14.58M tons (T) @ 3.68 g/t 4E CROCODILE • Current mine lease

  9. Slide 9: Record FY 2023 Revenue

    Record FY 2023 Revenue Focus on operational efficiency initiatives to lower costs and improve bottom line Revenue Mine Operating EPS 120 Income 0.1 35 0.08 100 30 0.06 0.04 80 25 0.02 60 20 0 15 -0.02 40 -0.04 10 -0.06 20 5 -0.08 0 0 -0.1 2020 2021 2022 2023 2020 2021 2022 2023 2020 2021 2022 2023 T

  10. Slide 10: Crocodile River Mine - Revenue & EBITDA

    Crocodile River Mine - Revenue & EBITDA Revenue US$000s EBITDA US$000s 40,000 Chrome Revenue PGM Revenue EBITDA 12,000 10,000 35,000 8,000 PGM to account for 30,000 6,000 25,000 4,000 65% of Revenue by 2,000 2025-2026 20,000 - 15,000 (2,000) (4,000) 10,000 (6,000) 5,000 (8,000) - (10,000) TSX: ELR |

  11. Slide 11: Chrome and PGM Production

    Chrome and PGM Production Tailings retreatment project Total Project to Chrome production 2019 2020 2021 2022 2023 FY 2023 Total tailing re-mined Tonnes 1,778,525 2,328,732 2,504,777 2,548,785 2,247,705 11,408,524 Total chrome concentrate Tonnes 588,006 987,003 773,274 602,112 486,166 3,436,561 Reco

  12. Slide 12: Zandfontein Mine Facility Map

    Zandfontein Mine Facility Map 0 250 500 m TSX: ELR | JSE: EPS 12

  13. Slide 13: Zandfontein Plant & Equipment

    Zandfontein Plant & Equipment TSX: ELR | JSE: EPS 13

  14. Slide 14: Mineral Reserves and Resources

    Mineral Reserves and Resources Mineral Reserves January 1, 2022 Delivered 4E grade 4E content tonnes kt g/t kg koz Proved 2,282 4.75 10,829 348 Probable 12,298 3.48 42,777 1,375 Total 14,580 3.68 53,605 1,723 Mineral Resources January 1, 2022 Mineral resource cut-off of 1.7 g/t 4E applied Geo Loss M

  15. Slide 15: Crocodile River Mine – Economic Highlights

    Crocodile River Mine – Economic Highlights Chrome cashflow upside 90,000 4.50 1.7Moz 4E Reserves (Zanfontein) 80,000 4.00 US $1,502/oz (including TSF) 70,000 3.50 US $1,405/oz(excluding TSF) 60,000 3.00 Cost (4E)(AISC) Recovered Oz Grade (g/t) 50,000 2.50 US $202 m (including TSF) 40,000 2.00 US $18

  16. Slide 16: Zandfontein Underground Soft Restart Plan

    Zandfontein Underground Soft Restart Plan 22-year Life of Mine Zandfontein UG Additional capital needed to fully re-start Zandfontein underground operations Immediate minable stoping (proved) for 2 years with 10 stoping crews on average Total plus probable reserves on 4-5 level USD Item Mining Capit

  17. Slide 17: Zandfontein Underground Soft Restart

    Zandfontein Underground Soft Restart 12-month ramp as of January 31, 2024 Tonnage Ramp-Up • At a normalized run rate, 50,000 the initial/soft restart phase 45,000 is expected to produce 40,000 tons of PGM 40,000 ore/month by end of 2024 35,000 • The next phase will see 30,000 operations ramp up to T

  18. Slide 18: Valuation Comparison

    Valuation Comparison​ EV/RESERVE 20241,2 EV/RESOURCE 20241,2 Opportunity to Re-rate by: 175.3 Re-negotiating nion oal payable​ 114.2 113.6 Re-starting production and 104.0 98.1 Processing at Zandfontein EV/RESERVE underground; low capital AVG – 85.8x 84.6 82.9 costs ersus peers​ Continuing to implem

  19. Slide 19: PGM Prill Split Underground Model

    PGM Prill Split Underground Model Industrial-driven, benefits from market demand and strong PGM metal price 4E Basket Price ($) - Payable Impala Model (2010 - 2024) CRM UG2 reef Prill split 4E $4,000.00 $3,500.00 Rhodium, Gold, 0.77% 9.86% $3,000.00 $2,500.00 Palladium, $2,000.00 27.32% $1,500.00 $1

  20. Slide 20: Focusing on Operational Efficiencies

    Focusing on Operational Efficiencies • Long-term price consensus for the global PGM basket is expected to be inline with today’s prices; however, ~ 90% of PGM producers operate at or below this cost ZAR1,997 / milled t ($1,405 / oz 4E) • CRM cost per ounce based CRM on the 2022 technical report, whi

  21. Slide 21: Focused on Operational Efficiencies

    Focused on Operational Efficiencies What we are doing differently at Crocodile River Mine 2024 Operational Objectives Implemented Efficiencies • Complete the second phase of TSF capital works program; • Drilling: move to handheld with hydropower → more effective power, • Optimize Main Plant Circuit

  22. Slide 22: Surface and Underground Infrastructure

    Surface and Underground Infrastructure Past investment of USD $526m+ and USD $106m+ since new leadership appointed in 2016. Total investment to date over USD $632m Main pump station Explosive storage Vertical shaft Ore silo Main conveyor on 4 level Chairlift Rock winder Man winder TSX: ELR | JSE: EP

  23. Slide 23: High Safety Standards

    High Safety Standards Committed to providing a safe working environment Zero Harm Safety Culture ✓ 1.16 million fatality free shifts as of September 2023 (over 10-year period) ✓ Hydropower and nets for support ✓ State of the art support design to improve efficiencies and ergonomics ✓ Modernized scra

  24. Slide 24: Social Labour Plan (SLP) - Going Beyond Mining

    Social Labour Plan (SLP) - Going Beyond Mining ZAR14.8m (~US$800k) spent on LED and SLP1 since 2019 Local employment Stakeholder forums SMME business development This project creates In place and operating well Currently in place. Have trained 56 local through the assistance of businesses in tenderi

  25. Slide 25: Chrome and PGM Value Play

    Chrome and PGM Value Play 2024 Catalysts Why Eastplats? • Ramp-up Zandfontein underground operations – #2 process up to 235,000 tons of UG ROM #1 production in 2024; • Resolve outstanding corporate items, including Significant Growth Profile Attractive Economics Control numerous quality PGM Flagship

  26. Slide 26: Thank You

    Thank You Eastern Platinum Limited www.eastplats.com Vancouver South Africa For investor relations inquiries, 1080 – 1188 West Georgia Crocodile River Mine contact: Street Zandfontein, Brits Vancouver, BC North West Wanjin Yang, CEO Canada, V6E 4A2 South Africa Wylie Hui, CFO and Corporate T: +1 604

  27. Slide 27: Chrome & PGM Demand

    Chrome & PGM Demand Chrome • Properties of chrome: hard and resistance to corrosion Clean energy technologies may impact need for • Common uses of chrome: kitchen appliances, food chrome & PGMs processing equipment, medical and dental tools, and clean energy technologies Source: International Energy

  28. Slide 28: Processing – Plant flow diagram

    Processing – Plant flow diagram TSF remined tailings DC Tank Concentrate Tailings Overflow Lamella Thickener Chrome WHIMS plant Cyclones Thickeners Process water tank Concentrate PGM Circuit B Scavenger/ PGM Circuit D Drying belts Stacker Cyclone Tailings Concentrate Tailings PGM concentrate dispatc

  29. Slide 29: What Are We Doing Differently?

    What Are We Doing Differently? Aspect Previous operations New design Advantage • More effective power • Higher penetration In-stope Drilling Handheld with compressed air Handheld with hydro power • Reduced noise • Reduced heat generation • Sticks • Timberless • Reduced logistics • 1.8m roofbolts • 2

Eastern Platinum — Investor Presentation (June 2024) on 6ix