Eastern Platinum Limited · TSX:ELR

Eastern Platinum — Investor Presentation (October 2026)

34 slides from Eastern Platinum's investor presentation, October 2026

  1. Slide 1: Advancing PGM Projects in South Africa

    TSX:ELR I JSE:EPS ADVANCING PGM Projects in South Africa Investor Presentation | October 2026 All figures are in U.S. dollars unless otherwise noted. TSX: ELR

  2. Slide 2: Advancing PGM Projects in South Africa

    TSX:ELR I JSE:EPS ADVANCING PGM Projects in South Africa Investor Presentation | October 2026 All figures are in U.S. dollars unless otherwise noted. TSX: ELR 2

  3. Slide 3: Advancing PGM Projects in South Africa

    TSX:ELR I JSE:EPS ADVANCING PGM Projects in South Africa Investor Presentation | October 2026 All figures are in U.S. dollars unless otherwise noted. TSX: ELR 3

  4. Slide 4: Forward-looking statements

    Forward-looking statements The information contained in this Presentation is provided for informational purposes only and does not constitute an offer to sell, or This Presentation contains certain statements that may be “forward-looking statements” or “forward-looking information” within the the so

  5. Slide 5: Overview

    Overview Eastern Platinum Limited (Eastplats) is a Canadian-listed, low-cost, mid-tier producer of platinum group metals (PGM) and chrome. The company holds a portfolio of high-grade assets situated within the Bushveld Complex in South Africa, hosting ~80% of the world’s PGM-bearing ore. Limpopo Leg

  6. Slide 6: The Eastplats opportunity

    The Eastplats opportunity S t r a t e gi c p i vo t t o h i g h - m a r gi n p r o d u c t i on Pivot Infrastructure Re-rating Resource Strengthened complete advantage opportunity optionality balance sheet Transition from tailings Deep infrastructure in place Trading at significant World-class asset

  7. Slide 7: Why Invest in PGMs?

    Why Invest in PGMS? Extreme scarcity Concentrated supply High barriers to entry vs 80%+ 10+ Years Platinum Gold Global supply from South Africa Discovery to production Platinum is ~30x rarer than gold. All platinum ever Majority of primary supply comes from the Bushveld New mining projects require s

  8. Slide 8: PGM market opportunity & demand drivers

    PGM market opportunity & demand drivers S t r u c t u r a l s u p p l y d e f i ci t s m e e t r e s i l i e n t i n d u s t r i a l d e m a n d MARKET OUTLOOK KEY DEMAND DRIVERS -300koz 4.7% Automotive resilience • Hybrid (PHEV) growth extends demand tail well beyond BEV adoption curves. 2026 DEFIC

  9. Slide 9: Focus on PGMs

    KEY DEMAND DRIVERS Focus on PGMs Platinum in key emerging market currencies P G M m a r k et o u t l ook The PGM market is set to grow from 667.39 tons in 2026 to 839.07 tons by 2031, driven by a 4.7% CAGR. Tight supply and increasing investor demand are key factors. 2026 platinum price: • Median pr

  10. Slide 10: Our journey

    Our journey E v o l u t i on f r o m t a i l i ng s r e t r e a t m e n t t o h i g h - v a l ue u n d e r g r ou nd P G M p r o d u cer PHASE 1: RETREATMENT 2018 – Q1 2025 PHASE 2: PIVOT COMPLETE Q1 2024 – 2025 PHASE 3: OPTIMIZATION 2026+ Foundation: funded underground restart Transformation: under

  11. Slide 11: Key achievements

    Key achievements Oct 2024 Underground operational restart First ROM UG2 ore processed from Zandfontein underground. Marks RESTART the definitive beginning of the new Eastplats operational era. Mar 2025 Full pivot & legacy action Tailings retreatment completed as planned. Union Goal put option exerci

  12. Slide 12: Leadership team

    Leadership team EXECUTIVE MANAGEMENT Changyu (Charlie) Liu Xinneng (David) Li Interim Chief Executive Officer Chief Financial Officer & Corporate Secretary Senior executive with over 25 years of experience in business Over 25 years of financial and operational experience, primarily in management, co

  13. Slide 13: Capital structure & liquidity

    Capital structure & liquidity OWNERSHIP BREAKDOWN SHARE STRUCTURE (April 2026) TRADING STATISTICS SECURITY C L AS S C O U N T / AM O U N T Common Shares Outstanding 204.9 M Other/strategic MARKET CAP 13% ~C$96 M Stock Options (Avg C$0.19) 4.4 M Institutional Warrants Nil 4% Fully Diluted Shares 209.

  14. Slide 14: Asset portfolio overview

    Asset portfolio overview |||||||||||||| Optimization & cash fow Project ffeasibility Strategic ooptionality OPERATING CARE & MAINTENANCE CARE & MAINTENANCE CROCODILE RIVER MINE KENNEDY'S VALE / SPITZKOP MAREESBURG Western Limb | Bushveld Complex Eastern Limb | Bushveld Complex Eastern Limb | Bushvel

  15. Slide 15: Crocodile River Mine (CRM) overview

    Crocodile River Mine (CRM) overview Infrastructure Investment $632M+invested to date $526M+ Pre-2016 $106M+ Since 2016 Major Assets: Vertical shaft, ore silo, main conveyor, chairlift, pump stations, explosive storage, Circuits B & D. High operating leverage & reduced capital intensity for ramp-up.

  16. Slide 16: Chrome & PGM production history

    Chrome & PGM production history Tr a n s i t io n t o U n d e r gr oun d U G 2 P r o d u c t i on & P G M - Le d R e v e n u e Tailings Chrome UG2 Chrome PGM 6E Production(oz) REVENUE MIX Tailings concluded Q4 2025 Revenue: 80% PGM / 20% Chrome FY 2025 Revenue: 65% PGM / 35% Chrome STRATEGIC PIVOT R

  17. Slide 17: Zandfontein Mine facility map

    Zandfontein Mine facility map TSX: ELR 17

  18. Slide 18: Zandfontein plant & equipment

    Zandfontein plant & equipment TSX: ELR 18

  19. Slide 19: Mineral Reserves & Resources

    Mineral Reserves & Resources M i ne r a l R e s e r ves J a n u ar y 1 , 2 0 2 2 1.72 Moz 8.49 Moz 11.00 Moz 22+ years PROVEN & PROBABLE RESERVES (4E) MEASURED & INDICATED RESOURCES (4E) INFERRED RESOURCES (4E) LIFE OF MINE (LOM) MINERAL RESERVES (CRM UG2 REEF) C ATE G O R Y T O N N E S (M T) G R A

  20. Slide 20: Crocodile River Mine – economic highlights

    Crocodile River Mine – economic highlights C h r o m e c a s h f l ow u p s i de INTERNAL RATE OF RETURN NET PRESENT VALUE (NPV 8%) LIFE OF MINE Key economic parameters 118% $202M 22+ years Pre-Tax Project IRR At $1,825/oz 4E Basket Price Sustainable Long-Term Operation METRIC VALUE UNIT / NOTES 90,

  21. Slide 21: Mineral Resources & Reserves

    Mineral Resources & Reserves Mineral Resource inventory by asset (Moz 4E) Reserves (P&P) M&I Resources Inferred Conversion potential 20-25 Years Reserve Life ASSET STAGE CATEGORY TONNES (MT) GRADE (G/T 4E) CONTAINED METAL Crocodile River Mine Operating Reserves (P&P) 14.58 3.68 1.72 Moz Crocodile Ri

  22. Slide 22: Quarterly production trends

    Quarterly production trends O p e r a t i onal M o m ent um a t C r o c o di l e R i v e r M i ne ( 2 0 2 5 ) Target: Positive by H2 2026 Revenue trajectory Quarterly growth driven by PGM ramp-Up Margin evolution Path to profitability Target: Positive by H2 2026 THROUGHPUT GROWTH RUN-RATE TARGET Key

  23. Slide 23: Key operating metrics (Q4 2025)

    Key operating metrics (Q4 2025) THROUGHPUT & SCALE GRADE & PRODUCTION TRAJECTORY & OUTLOOK Quarterly PGM production(oz) ROM UG2 PROCESSED +19.9% QOQ PGM 6E PRODUCTION (Q4) +94% YOY 94,606 tonnes 7,794 oz ROM UG2 Feed (Q4 2025) +94% YoY Growth (Q4 2025) Steady ramp-up towards nameplate capacity AVG U

  24. Slide 24: Zandfontein underground ramp-up progress

    Zandfontein underground ramp-up progress ROM throughput trajectory to steady-state TARGET: 70,000 t/m Crew stabilization Circuit D optimization Equipment avail. Dev. pipeline Fully Staffed Grade Targeting 75%+ Achieved 33MT Reserves Replacement crews trained Enhanced ore targeting & Consistent opera

  25. Slide 25: Estimated basket price (4E)

    TSX: ELR 27% Palladium metal price 10% Rhodium 1% Gold ESTIMATED BASKET PRICE (4E) $2,803.21 /oz I n d u s t r i a l - dr i ve n, b e n ef i t s f r o m m a r k e t d e m a n d a n d s t r o ng P G M As of March 2026 • High leverage to industrial metals 62% Platinum $- PGM prill split underground mo

  26. Slide 26: Surface & underground infrastructure

    Surface & underground infrastructure • Past investment of USD $526m+ & USD $106m+ since new leadership appointed In 2016 • Total investment to date over USD $632m Vertical Shaft Ore Silo Main Pump Station Explosive Storage Rock Winder Man Winder Main Conveyor On 4Level Chairlift TSX: ELR 26

  27. Slide 27: Focused on operational efficiencies

    Focused on operational efficiencies WHAT WE HAVE IMPLEMENTED NEAR-TERM OPERATIONAL FOCUS Underground stability Throughput growth stabilized UG2 production rates and sustained consistent ROM Targeting steady ramp-up to 70,000 tpm ROM by end of 2026. throughput. Circuit optimization Recovery enhanceme

  28. Slide 28: ESG & Sustainability

    ESG & SUSTAINABILITY Responsible Mining & Community Partnership TSX: ELR 28

  29. Slide 29: ESG & sustainability

    ESG & sustainability E a s t pl a t s i n t eg r at es s u s t a in a bl e p r a c t ic e s i n t o e v e r y a s p e ct o f o p e r at i on s, f o c u si ng o n s a f et y e x c e l l e nc e , c o m m u ni t y d e v e l opm e nt , a n d e n v i r on m e n t a l s t e w a r ds hi p. SAFETY FIRST EMP

  30. Slide 30: Investment highlights

    Investment highlights Imminent re-rating Timing opportunity Competitive moat Key mitigations Current valuation (0.3x P/NAV) disconnected from operational reality. 3x upside potential to peer Entry point at historical valuation $632M invested infrastructure = Execution: Underground mining average (0.

  31. Slide 31: 2026 catalysts & milestones

    2026 catalysts & milestones T H E S I S VA L I D AT E D C ATA LY S T S A H E A D ( 2 0 2 6 ) PIVOT COMPLETE CIRCUIT D OPTIMIZATION H1 2026 Underground is 100% of production. ≥82% PGM recovery vs. current ~75%. PGMs are 65% of revenue (vs. 7% in 2023). Directly improves production output and lowers c

  32. Slide 32: PGM-led value creation at Crocodile River Mine

    PGM-led value creation at Crocodile River Mine Near-term execution priorities Why Eastplats? ● Stabilize underground UG2 production and sustain consistent throughput Established underground PGM platform UG2 production at Crocodile River Mine is established ● Improve PGM recoveries through processing

  33. Slide 33: Why invest in Eastplats?

    EASTPLATS WHY INVEST IN EASTPLATS? 2026 OUTLOOK Transition to steady-state operations with optimized recoveries and normalized margins. Eastplats is positioned to deliver Established Underground PGM Platform substantial shareholder value in a rising PGM price UG2 production established and repeatabl

  34. Slide 34: Thank you

    TSX:ELR I JSE:EPS THANK YOU Investor Presentation | October 2026 All figures are in U.S. dollars unless otherwise noted. TSX: ELR 34