Future Metals Nl · ASX:FME

Future Metals Nl — Investor Presentation (June 2023)

23 slides from Future Metals Nl's investor presentation, Jun 13, 2023

  1. Slide 1: Shareholder Update

    For personal use only Shareholder Update ASX | AIM: FME Investor Presentation | June 2023

  2. Slide 2: Disclaimer

    Disclaimer This Presentation has been prepared as a summary only and does not contain all information about The information in this presentation that relates to Exploration Results is based on, and fairly represents, information compiled by Ms Future Metals NL’s (“Future” or “FME” or the Company’s a

  3. Slide 3: Future Metals: Panton PGM Project Overview

    Future Metals: Panton PGM Project Overview Scoping Study progressing; detailing a long life, low capital and high-grade PGM-Ni operation Highest grade PGM Resource • 2.9Moz @ 3.57g/t PGM3E (or 3.2Moz PdEq @ 3.86g/t PdEq) in Australia within bulk resource of 6.9Moz PdEq For personal use only Location

  4. Slide 4: Future Metals: Nickel Sulphide Exploration

    Future Metals: Nickel Sulphide Exploration Significant nickel sulphide discovery potential outside the existing PGM deposit Drilling underway at BC1 and Panton West  Untested with coincident indicators across EM, For personal use only magnetics, gravity, soils and rock chips  Nearby intercepts inc

  5. Slide 5: Corporate Overview

    Corporate Overview BOARD OF DIRECTORS MANAGEMENT TEAM Justin Tremain (Non-Executive Chairman) Jardee Kininmonth (Managing Director and CEO) • Experienced company director with extensive expertise across the • Experienced corporate finance and mining professional mineral resources sector • Prior role

  6. Slide 6: Hydrogen Applications Expected to Fuel Future PGM Demand

    Hydrogen Applications Expected to Fuel Future PGM Demand Traditional Demand PGM Intensity ICE Hybrid Fuel Cell Pt + Pd Demand Composition (koz), 2022 estimated (g per vehicle) 18,000 -92 907 16,000 1,540 14,000 11,231 3,362 12,000 ICE and hybrid vehicles require 3-7g of PGM while Fuel Cell vehicles

  7. Slide 7: Supply Concentrated in Russia and South Africa

    Supply Concentrated in Russia and South Africa Supply is highly concentrated to Russia and South Africa PGMs are a scarce metal Ex- South Africa PGMs are much less abundant than metals such as lithium & copper Years of Mine Reserves* 300 1.4 For personal use only 1.2 250 1.0 200 South Africa’s suppl

  8. Slide 8: Location and Infrastructure

    Location and Infrastructure A Well Serviced and Active Mining Region For personal use only Port Facilities Hydropower Multiple Mining Operations JUNE 2023 | INVESTOR PRESENTATION Sealed Airstrip Great Northern Highway 8

  9. Slide 9: Mineral Resource Estimate

    Mineral Resource Estimate MRE consists of high-grade reef and surrounding bulk mineralisation  129Mt @ 1.20g/t PGM3E, 0.19% Ni, and 154ppm Co (1.66g/t PdEq1) For personal use only  Containing 5.0Moz PGM3E, 239kt Ni, and 20kt Co (6.9Moz PdEq1) High-grade reef portion MRE constrained to ~5.1km  25M

  10. Slide 10: Project Delivery Strategy

    Project Delivery Strategy Supplying sustainable Platinum-Group-Metals from a stable mining jurisdiction Low emissions upgrading of Pre-concentration with ore Milling and flotation to produce concentrate with Lifezone’s Low impact underground sorting,separating high grade high grade concentrate with

  11. Slide 11: Ore Sorting to Unlock Panton

    Ore Sorting to Unlock Panton Ore sorting shows high efficiency in separating high-grade chromite reef ore from waste and low grade  Mitigates impact of mining dilution For personal use only  Improves processed head grade, reducing capex & opex  ‘Cleans’ ore ahead of flotation, removing significan

  12. Slide 12: Low-Emission PGM Production

    Low-Emission PGM Production  Scoping activities underway with Lifezone, developer of a robust hydrometallurgical process purpose built for High Lower capital and processing PGM concentrates Recoveries operating costs Low electricity For personal use only consumption Typically 95%+ for Pt, Capex 18%

  13. Slide 13: Project Delivery De-Risked

    Project Delivery De-Risked Mining during bulk sample extraction (2002) Future Metals has capitalised on the significant sunk cost and learnings of prior owners to progress development of Panton. Scoping study is drawing on: For personal use only  Metallurgical solution in place with multiple produc

  14. Slide 14: Panton Geology

    Panton Geology  12km long, 2.5km wide and 1.7km thick Long section layered mafic-ultramafic intrusion Cross section  Folded into a south-westerly plunging synclinal structure with extensive For personal use only cross faulting  Intrusive ‘complex’ subject to multiple magmatic pulses over time; po

  15. Slide 15: Nickel sulphide targets: BC1

    Nickel sulphide targets: BC1  Shallow embayment feature (BC1) identified under cover with coincident anomalies across magnetics, soils, stream sediments and drilling – nearby sulphide rich intercepts include: For personal use only  19m @ 0.49% Ni, 0.28% Cu, 0.51 g/t PGE3E from 88m, incl:  3m @ 1.

  16. Slide 16: Nickel sulphide targets: Panton West

    Nickel sulphide targets: Panton West  Panton West is interpreted to be the basal contact position of a sill of similar to Panton For personal use only  Falcon gravity data used to identify the sill’s position which has been shifted by late stage faulting  Discrete magnetic features with coinciden

  17. Slide 17: Delivering Value Through Sustainable Development

    Delivering Value Through Sustainable Development Future Metals is committed to growing value for shareholders while maintaining high ESG standards Creating a positive case study for Environmental stewardship community engagement in the East  Minimise impact where possible; from Kimberley exploratio

  18. Slide 18: Becoming the First PGM Producer in Australia

    Becoming the First PGM Producer in Australia Q2 Q3 Q4 2023 2023 2023 Exploration RC drilling at BC1 & Panton West For personal use only Assay results Soil sampling and mapping programme Follow up drilling, geophysics and sampling JUNE 2023 | INVESTOR PRESENTATION Study & Metallurgical Activities JOR

  19. Slide 19: Corporate Overview

    Corporate Overview 6-Month Share Price Chart | ASX and AIM FME $17.1M $0.14 10,000,000 For personal use only ASX | AIM Code Market Cap 9,000,000 $0.12 8,000,000 4.2 cents $13.2M $3.9M $0.10 7,000,000 Share Price Enterprise Cash 6,000,000 JUNE 2023 | INVESTOR PRESENTATION Volume (ASX : AIM) $0.08 (31

  20. Slide 20: Why Invest in Future Metals?

    Why Invest in Future Metals? High grade, and large resource base For personal use only Project delivery de- risked Development JUNE 2023 | INVESTOR PRESENTATION optionality Panton hosts the perfect suite of metals to support the growing demand from manufacturers of catalytic convertors, hydrogen ele

  21. Slide 21: In-Situ Value Per Tonne Contribution

    In-Situ Value Per Tonne Contribution Mass Grade For personal use only Ni Cu Co PdEq (Mt) Pd (g/t) Pt (g/t) Au (g/t) PGM3E (g/t) (%) (%) (ppm) (g/t) Reef 25.4 1.71 1.61 0.24 3.57 0.24 0.07 192 3.86 Dunite 103.4 0.31 0.25 0.07 0.62 0.17 0.03 145 1.12 Total 128.9 0.58 0.52 0.10 1.20 0.19 0.04 154 1.66

  22. Slide 22: Panton JORC Mineral Resource

    Panton JORC Mineral Resource Resource Category Mass Grade Contained Metal Pd Pt Au PGM3E Ni Cu Co PdEq Pd Pt Au PGM3E Ni Cu Co PdEq (Mt) (g/t) (g/t) (q/t) (%) (%) (ppm) (g/t) (Koz) (Koz) (Koz) (kt) (Kt) (Kt) (Koz) (g/t) (Koz) For personal use only Reef Indicated 7.9 1.99 1.87 0.31 4.16 0.24 0.07 190

  23. Slide 23: Palladium Equivalent Calculation

    Palladium Equivalent Calculation Palladium Metal Equivalents Based on metallurgical test work completed on Panton samples, all quoted elements included in the metal equivalent calculation (palladium, platinum, gold, nickel, copper and cobalt) have a reasonable potential of being ultimately recovered

Future Metals NL — Investor Presentation (June 2023) on 6ix