Firefly Metals Ltd · ASX:FFM

Firefly Metals — Technical Presentation (August 2026)

76 slides from Firefly Metals's technical presentation, Aug 25, 2026

  1. Slide 1: Green Bay Copper Gold Project PEA & Mineral Resource Update

    ASX | TSX FFM For personal use only GREEN BAY COPPER GOLD PROJECT Building Canada's Next Mid-Tier Copper Producer PRELIMINARY ECONOMIC ASSESSMENT & MINERAL RESOURCE UPDATE August 2026 ASX & TSX: FFM | fireflymetals.com.au 1

  2. Slide 2: Disclaimers & Compliance Statements

    Disclaimers & Compliance Statements DISCLAIMERS & COMPLIANCE STATEMENTS This presentation has been prepared by FireFly Metals Ltd (Company) based on information from its own and third party sources. No party other than the Company has authorised or caused the issue, lodgement, submission, dispatch o

  3. Slide 3: Disclosure of Technical Information and Forward-Looking Statements

    Disclaimers & Compliance Statements DISCLOSURE OF TECHNICAL INFORMATION All technical and scientific information in this presentation has been reviewed and approved by Group Chief Geologist, Mr Juan Gutierrez BSc, Geology (Masters), Geostatistics (Postgraduate Diploma), who is a Member and Chartered

  4. Slide 4: Not Investment Advice

    Disclaimers & Compliance Statements NOT INVESTMENT ADVICE Each recipient of the presentation should make its own enquiries and investigations regarding all information in this presentation including but not limited to the assumptions, uncertainties and contingencies which may affect future operation

  5. Slide 5: Investment Highlights

    Investment Highlights A large-scale, multi-decade copper-gold mine in Canada with a rapid pathway to production Strong Financial Position Tier 1 Jurisdiction • ~A$183.4M cash and liquid investments1; no debt • Newfoundland, Canada – top global mining jurisdiction For personal use only • Additional ~

  6. Slide 6: Preliminary Economic Assessment

    For personal use only Preliminary Economic Assessment Summary of the economic study into the upscaled resumption of production at the Green Bay Ming Mine Project ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 6

  7. Slide 7: PEA Study Highlights

    Long-life operation with exceptional PEA Study Highlights economics in a tier one jurisdiction Two development cases were analysed in the study – Both returning outstanding economics 1 1.8Mtpa Case (4,800tpd) 2 4.6Mtpa Case (12,500tpd) For personal use only Post-tax NPV7% Peak Production1 Post-tax N

  8. Slide 8: Production Profile

    Multi-decade large scale high-grade copper-gold Production Profile mine in Canada 4.6Mtpa Case 120 11 years @ ~90ktpa LOM CuEq Production 1.8Mtpa (4,800tpd) Including 6 years @ ~100ktpa 1,127kt 1,319kt 4.6Mtpa (12,500tpd) personal use only 1.8Mtpa 4.6Mtpa 100 Case Case Payable CuEq Metal (‘000 tonne

  9. Slide 9: Production Profile: Canada and Australia

    For personal use only Copper Production (t) 70,000 90,000 100,000 40,000 50,000 80,000 - 20,000 30,000 60,000 10,000 Green Bay Actual (2022) Rambler (Previous Owner) Kanmantoo Hillgrove Sudbury INO Glencore Eloise AIC Mount Polley Imperial Production Profile Stockman Aeris Kidd Creek Discovery McIlv

  10. Slide 10: Economic Analysis

    Robust Economics strongly leveraged to Economic Analysis1 Copper price NPV Sensitivity - 1.8Mtpa Case (A$M) 1.8 Mtpa Case 4.6 Mtpa Case Spot Copper Price (-/+25%) A$2,166 US$6.60/lb A$4,021 PEA Price Spot Price4 PEA Price Spot Price4 NPV (A$2,194) For personal use only NPV(7%) post-tax ~A$2.2B ~A$3.

  11. Slide 11: Cashflow: Significant Free Cash Flow generation

    Cashflow Significant Free Cash Flow generation 450 Free Cash Flow Generation (after-tax) - 1.8Mtpa Case LOM Cumulative FCF A$5,373M 368 357 370 337 322 329 350 Annual Free Cash Flow After- 299 303 287 282 252 256 For personal use only 250 182 207 189 181 162 High-Grade VMS Extensions; Remains OPEN 1

  12. Slide 12: Operating Costs

    Projected to sit at the lower end of the cost curve for Operating Costs copper developers and producers Green Bay is expected to be lower cost than most existing producing assets1 and the next generation2 of copper projects For personal use only $3.50 $3.30 $3.06 $2.76 $2.68 $2.66 $2.49 $2.40 $2.37

  13. Slide 13: Capital Intensity

    Low capex intensity leverages existing near-mine Capital Intensity infrastructure Capital Intensity of Copper Development Projects1 Owned by Investable Peers2 25 Competitive advantages result in low 44 25 capital intensity: For personal use only 22 22 • Existing infrastructure including 20 undergrou

  14. Slide 14: Technical Overview

    Technical Overview Large scale mine with robust economics PEA study work undertaken by industry-leading independent technical experts For personal use only Conservative Long Multi-Decade Further Growth Flexibility & Study Inputs Mine Life 2026/27 Scalability Commodity prices 32 years LOM Mineralisat

  15. Slide 15: Operations Overview

    Simple industry standard mining & Operations Overview processing techniques Metallurgy Concentrate Infrastructure Mining & Processing & Port & Power For personal use only LHOS with 20m- Truck & >98% Cu >80% Au & Ag 11.5 24% Cu 6g/t Au 54g/t Ag +$250M Previously Grid Hydro 25m Sublevels Shaft Haulage

  16. Slide 16: Mineral Processing

    Mineral Processing A simple conventional process Industry Standard Mineral Processing Setup due to favorable grinding and flotation properties • Mill is designed to be scalable. For personal use only • Low Capital Expansion o To go from 1.8Mtpa to 4.6Mtpa requires a simple twinning of the circuit an

  17. Slide 17: Mine Design

    Mine Design Simple design allowing for future expansion Mine Design for the 4.6Mtpa (12,500tpd) Case Staged mine design easily expandable from the 1.8Mtpa case up to the 4.6Mtpa case For personal use only • Underground mining operation using conventional sub-level longhole stoping with mining in mul

  18. Slide 18: Mine Design: Shaft unlocks additional value in 4.6Mtpa Option

    Mine Design Shaft unlocks additional value in the 4.6Mtpa Option Mine Design for the 4.6Mtpa (12,500tpd) Case Mine Animation Current New Historical Decline Decline Please follow the link to a video For personal use only Shaft Vent Raisebores animation on the FireFly website Shaft showing development

  19. Slide 19: Mill Feed Source

    High grade core zone is fast-tracked into mine Mill Feed Source plan and remains open Initial mine plan to access both copper-rich VMS and FWZ zones concurrently, with strong early cash flows to fund the 4.6Mtpa case scenario Mill Feed by Mineralization Type - 1.8 Mtpa Case For personal use only 14

  20. Slide 20: Forward Work Plans

    For personal use only Forward Work Plans Catalyst-rich 2026 and 2027 ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 20

  21. Slide 21: Growth: The Green Bay growth story has just begun

    Growth The Green Bay growth story has just begun….. FireFly remains committed to unlocking the full potential of the Green Bay copper-gold Project by continued investment in GROWTH activities For personal use only 1 2 3 Resource Growth & Reserve Conversion Upscaled Project Restart District VMS Disco

  22. Slide 22: Regional Discovery

    Discovery of satellite deposits would be a game Regional Discovery changer for the Green Bay production profile $16.7M Regional Program in FY27 2-3 x Rigs, Extensive Geophysics Regional Program Across 346km² land package For personal use only MING EXTENSIONS (Near-Mine Growth) • Geophysics: Untested

  23. Slide 23: Timeline

    Timeline Green Bay Project1 - Mining, Development & Growth; Defining a High-Grade Large-Scale Copper & Gold VMS District Milestone H2 26 H1 27 H2 27 H1 28 H2 28 H1 29 H2 29 Ming Underground Resource Growth UG Resource Drilling 6x Rigs: high grade upper mine For personal use only extensions, M&I grow

  24. Slide 24: Project Financing & Equity Raising

    For personal use only Project Financing & Equity Raising ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 24

  25. Slide 25: Project Financing

    Project Financing The Company has the ability to fund the Green Bay project The Green Bay Copper Gold Mine is a high-quality project with strong debt carrying capacity • BurnVoir Corporate Finance appointed debt advisor For personal use only • Initial advice that debt carrying capacity on commercial

  26. Slide 26: Equity Raising Summary

    Equity Raising Summary of Equity Raising Offer Size and • FireFly is seeking to raise up to approximately A$180 million (~C$177.6million)1 before costs, through the issue of up to approximately 101.1 million fully paid Structure ordinary shares in the Company (New Shares) via an equity raising (Equi

  27. Slide 27: Sources and uses of funds

    Equity Raising Sources and uses of funds Proceeds from the Equity Raising will position FireFly to maintain momentum of project advancement towards production whilst de-risking future development Sources of Funds A$’M Deliverables For personal use only ASX Placement 150.0 Studies, Development and Ea

  28. Slide 28: Indicative Equity Raising Timetable

    Equity Raising For personal use only Indicative Equity Raising Timetable Key Event Date - 2026 SPP Record Date (5:00pm AWST) Monday, 24 August Announcement of Equity Raising, launch of ASX Placement bookbuild Tuesday, 25 August Announcement of completion of ASX Placement bookbuild Wednesday, 26 Augu

  29. Slide 29: Pro-Forma Capital Structure

    Equity Raising Pro-Forma Capital Structure Upon completion of the Equity Raising and SPP, FireFly will have a strong cash and liquid investments position of ~$A373.4 million (before costs) For personal use only Unit Current Pro-Forma Number of Ordinary Shares M 768.8 875.5 Market Capitalisation at O

  30. Slide 30: Catalyst-Rich 2026-2027

    Catalyst-Rich 2026-20271 Mid-2026 Start 2027 Mid - 2027 2028 Mid 2029 For personal use only Financing & Offtake In Place Construction Progressing First Production Economic Studies Release Regional Exploration Results (PEA/Scoping Study) Ongoing UG & Surface Drilling Final Investment Decision Resourc

  31. Slide 31: Mineral Resource Update & Further Growth

    Mineral Resource For personal use only Update & Further Growth Updated Mineral Resource Estimate at August 2026 ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 31

  32. Slide 32: Green Bay MRE

    Consistent year on year resource Green Bay MRE growth with more to come • August 2026 PEA updated MRE now contains 1.6Mt of Copper, 1.3Moz of Gold and Green Bay Total Resource 1 12.1Moz of Silver Ming Mine & Little Deer Deposit • 77% of the Ming Mine MRE is now in the high confidence M&I Resource ca

  33. Slide 33: Mineralisation Types

    Green Bay has world-class VMS style Mineralisation Types copper-gold mineralisation Upper Volcanogenic Broad Footwall Convergent Massive Sulphide Stringer Zone High-Grade Core Zone For personal use only Massive Sulphides Cu-Rich Stringers Massive Sulphides Cu-Rich Stringers Multiple lenses of copper

  34. Slide 34: Green Bay Mineral Resource

    A rare combination of mineral Green Bay Mineral Resource resource scale and grade 1,400,000 M&I Mineral Resource Contained Copper (t) 6.0 Inferred Mineral Resource Contained Copper (t) M&I Mineral Resource Copper Grade (%) For personal use only 1,200,000 Inferred Mineral Resource Copper Grade (%) 5.

  35. Slide 35: Resource Sensitivity

    Potential for significantly more copper-gold Resource Sensitivity metal at various cut-off grades Green Bay MRE Grade-Tonnage Sensitivity Curve • The Green Bay MRE has 160,000,000 Resource @ 0.6% Cu COG Reported Resource 5.0 upside to a reduced Cut Off 80.6Mt @ 2.1% CuEq M&I 60.2Mt @ 2.4% CuEq M&I G

  36. Slide 36: About FireFly Metals

    For personal use only About FireFly Metals Supplementary Information ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 36

  37. Slide 37: Corporate Overview

    Exceptional Share Register and Strong Balance Corporate Overview Sheet 5.8% 15.5% 5.8% Listings Shares on Issue 1 Share Price 3 Cash & Liquid Assets 4 5.0% 768.8M ~A$1.90 ~A$183.4M For personal use only ASX: FFM 8% TSX: FFM Avg Daily Vol 2 Market Cap 3 Debt: Streams: Major Shareholders5 ASX 200 4.8M

  38. Slide 38: Board and Management

    A Leadership Team with Proven Mine Board and Management Building Experience Strong Governance Mine Development Expertise Capital Markets Leadership Proven track record of advancing mineral Seasoned independent directors with extensive ASX Deep corporate finance, investor relations, For personal use

  39. Slide 39: Exceptional Management and In-Country Team

    Board and Management Exceptional Management and In- Country Team Experienced corporate, technical and in-country leaderships to advance Green Bay Corporate, Capital Markets & Governance Operations & Technical People & Community For personal use only Jessie Liu-Ernsting Gus Simbanegavi Daina Del Bore

  40. Slide 40: Location: Newfoundland & Labrador

    Location Newfoundland & Labrador – Tier One Mining Jurisdiction Permitting & Development • Supportive Government & Community • Permitting framework; Released from E.A in 45 days For personal use only Infrastructure & Power • 1.5hr drive from commercial airport via paved highway • Access to low-cost

  41. Slide 41: Appendices

    Appendices For personal use only Supplementary Information Appendix 1: PEA Financial Metrics Appendix 2: MRE Supplementary Information Appendix 3: Green Bay Regional Exploration Appendix 4: Reference Data for Slides Appendix 5: Key Risks and International Offer Restrictions (ASX Placement Only) ASX:

  42. Slide 42: PEA Financial Metrics

    APPENDIX 1 For personal use only PEA Financial Metrics Summary of the key study financial metrics for both the 1.8Mtpa (4,800tpd base case) and the 4.6Mtpa (12,500tpd) option ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 42

  43. Slide 43: Financial Metrics Overview: LOM Physicals

    Financial Metrics Overview Compelling LOM Physicals PRODUCTION DATA Mill Feed Tonnage (annual) Mtpa 1.8 4.6 For personal use only Average Throughput (daily) tpd 4,800 12,500 Mine Life years 32.3 22.3 Copper Head Grade LOM % Cu 1.83 1.58 Gold Head Grade LOM g/t Au 0.62 0.48 Silver Head Grade LOM g/t

  44. Slide 44: Financial Metrics Overview: Project Economics

    Financial Metrics Overview Compelling Project Economics 1.8 Mtpa 4.6 Mtpa FINANCIAL ANALYSIS UNIT Scenario Scenario PEA Spot PEA Spot For personal use only Metal Prices Metal Prices Metal Prices Metal Prices After-Tax NPV7% A$ $2.2B $3.6B $3.0B $5.0B After-Tax IRR % 42% 55% 40% 54% Post-tax Payback

  45. Slide 45: Initial Capital

    Low capital intensity, underpinned by existing Initial Capital infrastructure A$ MILLIONS 1.8 Mtpa Case 4.6 Mtpa Case Total initial Capital Cost Mining 227 256 For personal use only Process plant 124 124 Refundable tax credits On-site surface infrastructure 36 36 Mining On-site rock storage and wate

  46. Slide 46: Operating Costs

    Ming Mine operating costs point to a long-life high Operating Costs margin copper and gold mine 9% 10% LOM OPERATING COSTS 1.8 Mtpa Case 4.6 Mtpa Case 7% 5% For personal use only Mining A$/tonne milled 99 74 Processing A$/tonne milled 18 15 13% 14% G&A A$/tonne milled 10 5 Total on-site operating co

  47. Slide 47: Sustaining Capital

    Efficient Sustaining Capital Enables Mining Sustaining Capital Flexibility Across Multiple Fronts A$ MILLIONS 1.8 Mtpa Case 4.6 Mtpa Case Total Sustaining Capital Cost Mining 662 679 For personal use only Refundable tax credits Process plant 3 3 Mining On-site surface infrastructure 8 8 Contingency

  48. Slide 48: MRE Supplementary Information

    APPENDIX 2 For personal use only MRE Supplementary Information The Mineral Resource Estimate (MRE) statement accompanied by additional growth information ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 48

  49. Slide 49: Green Bay Mineral Resource Statement at August 2026

    Green Bay Resource Update Green Bay Mineral Resource Statement at August 2026 Ming Deposit Mineral Resource Estimate TONNES COPPER GOLD SILVER CuEq For personal use only (Mt) Grade Metal Grade Metal Grade Metal Grade (%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%) Measured 3.5 1.5 52 0.2 20 1.3 147

  50. Slide 50: Mine Plan by Resource Category (1.8Mtpa)

    Mine plan is based on a high Mine Plan by Resource Category confidence MRE 1.8Mtpa (4,800tpd) Base Case Tonnes Mined by Resource Category1 2,000,000 89% M&I in the First 10 Years For personal use only 93% 79% in M&I over 1,800,000 95% 92% 90% the Life of Mine Tonnes Mined (Excluding Waste & Dilution

  51. Slide 51: Mine Plan by Resource Category (4.6Mtpa)

    Mine plan is based on a high Mine Plan by Resource Category confidence MRE 4.6Mtpa (12,500tpd) Base Case Tonnes Mined by Resource Category1 4,500,000 83% M&I in the First 8 Years 78% For personal use only 79% 74% 74% 71% 81% 78% 80% 80% 80% in M&I 4,000,000 over the Life of Tonnes Mined (Excluding W

  52. Slide 52: Green Bay Mineral Resource: A World-Class VMS Deposit

    Green Bay Mineral Resource A World-Class VMS Deposit Green Bay Total Resource1 Ming Mine August 2026 Mineral Resource Estimate For personal use only 60.2Mt @ 2.4% CuEq M&I 57.3Mt @ 2.4% CuEq M&I 23.5Mt @ 2.5% CuEq Inferred 17.3Mt @ 2.8% CuEq Inferred 6 Rigs M&I Metal & Grade Inf. Metal & Grade To co

  53. Slide 53: Resource Drill Data

    Low-Cost Organic Resource Growth via Resource Drill Data Investment in the drill bit Drilling Completed by FireFly since October 2023 197,700m of Drilling by FireFly For personal use only to June 30 2026 83.7Mt @ 2.5% CuEq 60.2Mt @ 2.4% CuEq 23.5Mt @ 2.5% CuEq Deepest hole at +2km of Exploration acq

  54. Slide 54: Resource Growth

    Consistent year-on-year growth with increasing Resource Growth grade and confidence 1,600,000 2.8% • Investment in drilling has resulted in For personal use only exceptional year-on-year Mineral 1,400,000 2.53% 2.6% Resource growth in both tonnes and 2.46% grade 2.4% 1,200,000 2.43% • CuEq Grade has

  55. Slide 55: Green Bay Regional Exploration

    APPENDIX 3 For personal use only Green Bay Regional Exploration Supplementary Information ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 55

  56. Slide 56: Ming Regional

    Ming Regional Multiple VMS Clusters Surrounding Ming Mine MING MINE UNTESTED MING-ORIENTED 5,535,000mN M&I Resource: 57.3Mt @ 2.4% CuEq Inf Resource: 17.3Mt @ 2.8% CuEq CONDUCTIVE TRENDS Shallow Drill UNTESTED Open Down Plunge Targets in 2026 For personal use only MING-ORIENTED CONDUCTIVE TREND • Mu

  57. Slide 57: Tilt Cove Regional

    Tilt Cove Regional Exceptional near-mine and regional potential around three historical mines 5,530,000mN TILT COVE MINE Historical Production 1864-1967 ~ 8 Mt mined: 170 kt of Cu and NUGGET POND MINE 42.5 kOz Au produced For personal use only Historical Production 1997 - 2004 5,525,000mN 443 kt of

  58. Slide 58: Tilt Cove and Little Deer

    Tilt Cove and Little Deer Little Deer Mineral Resource remains open TILT COVE REGIONAL EXPLORATION PROJECT – LARGE SCALE DISCOVERY POTENTIAL For personal use only Historical Mining at Tilt Cove Large Untested EM Anomaly • 115km2 area only ~30km east of Ming Mine Ming Mine • Large copper-gold VMS sys

  59. Slide 59: Reference Data for Slides

    APPENDIX 4 For personal use only Reference Data for Slides Source and key information summary for slides that contain external production and Mineral Resource data ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 59

  60. Slide 60: Appendix 4.1 Copper Resource Data Sources & Figures

    Appendix 4.1 Copper Resource Data Sources & Figures M&I Inferred M&I Inferred Mineral Mineral Mineral Mineral Current Effective For personal use only Project Project Stage Resource Resource Resource Resource Reference Owner Date Contained Contained Copper Copper Copper (t) Copper (t) Grade (%) Grade

  61. Slide 61: Appendix 4.2: Copper Production & Cost Data 1/3

    Sources & Appendix 4.2: Copper Production & Cost Data Figures 1/3 Production (t) – Cost (US$/lb Cu) Current 2025 Actual or – 2025 Actual or Effective For personal use only Owner Project Status Study Estimate Study Estimate Reference Date Sudbury https://www.sedarplus.ca/csa- Operations Magna Produce

  62. Slide 62: Appendix 4.2: Copper Production & Cost Data 2/3

    Sources & Appendix 4.2: Copper Production & Cost Data Figures 2/3 Production (t) – Cost (US$/lb Cu) Current 2025 Actual or – 2025 Actual or Effective For personal use only Owner Project Status Study Estimate Study Estimate Reference Date https://filemanager-cdn.mziq.com/published/53207d1c-63b4-48f1-

  63. Slide 63: Appendix 4.2: Copper Production & Cost Data 3/3

    Sources & Appendix 4.2: Copper Production & Cost Data Figures 3/3 Production Cost (US$/lb (t) – 2025 Cu) – 2025 Actual or Actual or Study Study Effective For personal use only Current Owner Project Status Estimate Estimate Reference Date Green Bay 25-Aug- 1.50 (1.8Mtpa) FireFly 2026 PEA 35,000 2026

  64. Slide 64: Appendix 4.3 Copper Project Study Data 1/2

    Appendix 4.3 Copper Project Study Data Sources & Figures 1/2 Annual Initial Capital Current Study Production (Kt) – Cost (US$M) – Effective Owner Project Stage Study Estimate Study Estimate Reference Date For personal use only Green Bay FireFly 2026 PEA 49 1.50 2026 PEA/Scoping Study design 2026-08-

  65. Slide 65: Appendix 4.3 Copper Project Study Data 2/2

    Appendix 4.3 Copper Project Study Data Sources & Figures 2/2 Annual Initial Capital Current Study Production (Kt) – Cost (US$M) – Effective Owner Project Stage Study Estimate Study Estimate Reference Date For personal use only https://koryxcopper.com/wp-content/uploads/2026/02/PEA_of_the_Haib_Copper

  66. Slide 66: Key Risks and International Offer Restrictions

    APPENDIX 5 For personal use only Key Risks and International Offer Restrictions ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 66

  67. Slide 67: Key Risks: Operating Risk

    Key Risks Operating Risk There are significant risks in developing a mine and there is no guarantee that the Company will be able to achieve economic production from any of the tenements in which the Company has an interest (Tenements). In addition, the operations of the Company may be affected by v

  68. Slide 68: Key Risks: Completion of Equity Raising

    Key Risks Completion of Equity Raising The Company has entered an agreement with BMO Capital Markets (BMO), pursuant to which BMO, on behalf of a syndicate of underwriters, has agreed to purchase Shares on a “bought deal” basis (TSX Bought Deal). The Shares under the TSX Bought Deal are being offere

  69. Slide 69: Key Risks: Resource Estimation Risk

    Key Risks Resource Estimation Risk Mineral Resource Estimates have been reported for the Green Bay Copper-Gold Project. Resource estimates are expressions of judgement based on knowledge, experience and industry practice. Estimates of mineral resources that were valid when originally made may alter

  70. Slide 70: Key Risks: Grant, Tenure and Forfeiture of Licences

    Key Risks Grant, Tenure and Forfeiture of Licences The Company’s Green Bay Copper-Gold Project is subject to the applicable provincial mining act of Newfoundland and Labrador, pursuant to which mining and exploration tenements are subject to periodic renewal. The renewal of the term of a granted ten

  71. Slide 71: Key Risks: Climate Change

    Key Risks Climate Change There are a number of climate-related factors that may affect the Company’s business. Climate change or prolonged periods of adverse weather and climatic conditions (including rising sea levels, floods, drought, For personal use only water scarcity, temperature extremes, fro

  72. Slide 72: Key Risks: Legal Proceedings

    Key Risks Legal Proceedings Legal proceedings may arise from time to time in the course of the business of the Company. However, the Company is exposed to possible litigation risks including native title claims, tenure disputes, environmental claims, occupational health and safety claims and employe

  73. Slide 73: International Offer Restrictions (ASX Placement Only)

    International Offer Restrictions (ASX Placement Only) International Offer Restrictions (ASX Placement only) This document does not constitute an offer of new ordinary shares (New Shares) of the Company in any jurisdiction in which it would be unlawful. In particular, this document may not be distrib

  74. Slide 74: International Offer Restrictions: European Union, Hong Kong

    International Offer Restrictions (ASX Placement Only) European Union (excluding Austria) This document has not been, and will not be, registered with or approved by any securities regulator in the European Union. Accordingly, this document may not be made available, nor may the New Shares be offered

  75. Slide 75: International Offer Restrictions: Singapore

    International Offer Restrictions(ASX Placement Only) Singapore This document and any other materials relating to the New Shares have not been, and will not be, lodged or registered as a prospectus in Singapore with the Monetary Authority of Singapore. Accordingly, this document and any other documen

  76. Slide 76: International Offer Restrictions: United Kingdom

    International Offer Restrictions(ASX Placement Only) United Kingdom This document has not been delivered for approval to the Financial Conduct Authority in the United Kingdom and no prospectus (within the meaning of Regulation 21 of The Public Offers and Admissions to Trading Regulations 2024 (POATR

FireFly Metals — Technical Presentation (August 2026) on 6ix