FireFly Metals Ltd · ASX:FFM
FireFly Metals — Shareholder Meeting (November 2026)
54 slides from FireFly Metals's shareholder meeting presentation, Nov 24, 2026

Slide 1: Building Canada's Next Mid-Tier Copper Producer
ASX | TSX FFM rsonal use only GREEN BAY COPPER GOLD PROJECT Building Canada's Next Mid-Tier Copper Producer AGM INVESTOR PRESENTATION 24 November 2026 ASX & TSX: FFM | fireflymetals.com.au 1

Slide 2: Disclaimers & Compliance Statements
Disclaimers & Compliance Statements DISCLAIMERS & COMPLIANCE STATEMENTS This presentation has been prepared by FireFly Metals Ltd (Company) based on information from its own and third party sources. No party other than the Company has authorised or caused the issue, lodgement, submission, dispatch o

Slide 3: Disclaimers & Compliance Statements
Disclaimers & Compliance Statements JORC CODE (2012 EDITION) AND NI 43-101 Mineral Resource Estimates and Exploration Results are reported in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code (2012 Edition))

Slide 4: Highlights: Ready to take advantage of a strong copper market
Highlights Ready to take advantage of a strong copper market • Existing mine & surface infrastructure - a huge headstart (Environmentally permitted, port, hydro power, operating mine site, skilled workforce, strong government support) • Proven team with operational and development experience (Rio Ti

Slide 5: Projected to be one of the largest copper projects in Canada and Australia
rsonal use only Copper Production (t) 70,000 90,000 100,000 40,000 50,000 80,000 - 20,000 30,000 60,000 10,000 Green Bay Actual (2022) Rambler (Previous Owner) Kanmantoo Hillgrove Sudbury INO Glencore Eloise AIC Mount Polley Imperial Significant Scale Stockman Aeris Kidd Creek Discovery McIlvenna Ba

Slide 6: Corporate Overview
Corporate Overview Global Share Register and Strong Balance Sheet Listings Shares on Issue 1 Share Price 1 Cash & Liquid Assets 3 872.7M ~A$1.175 rsonal use only ASX: FFM ~A$349.7M 6% TSX: FFM Market Cap 1 Debt: Streams: 16% Avg Daily Vol 2 ASX 200 5.8M ~A$1.0B $0 None Major 45% Global Banking & Ana

Slide 7: A Leadership Team with Proven Mine Building Experience
A Leadership Team with Proven Mine Board of Directors Building Experience Strong Governance Mine Development Expertise Capital Markets Leadership Proven track record of advancing mineral Seasoned independent directors with extensive ASX Deep corporate finance, investor relations, rsonal use only pro

Slide 8: Management Team
Management Team Exceptional Management and In-Country Team Experienced corporate, technical and in-country leaderships to advance Green Bay Corporate, Capital Markets & Governance Operations & Technical People & Community rsonal use only Jessie Liu-Ernsting Gus Simbanegavi Daina Del Borello Chief Co

Slide 9: Location: Newfoundland & Labrador, A Tier One Mining Jurisdiction
Location Newfoundland & Labrador A Tier One Mining Jurisdiction Permitting & Development • Supportive Government & Community • Permitting framework; Released from Environmental Assessment in 45 days rsonal use only Infrastructure & Power • 1.5hr drive from commercial airport via paved highway • Acce

Slide 10: PEA Study Highlights
Long-life operation with exceptional PEA Study Highlights economics in a tier one jurisdiction Two development cases were analysed in the study – Both returning outstanding economics 1 1.8Mtpa Case (4,800tpd) 2 4.6Mtpa Case (12,500tpd) rsonal use only Post-tax NPV7% Peak Production1 Post-tax NPV7% P

Slide 11: Low Capital Intensity
Low capex intensity leverages existing Low Capital Intensity near-mine infrastructure Our competitive advantages result in Capital Intensity of Copper Development Projects1 Owned by Investable Peers2 25 44 low capital intensity: 25 22 rsonal use only 22 • Existing infrastructure including undergroun

Slide 12: Operating Costs
Operating Costs Projected to sit at the lower end of the cost curve for copper developers and producers Green Bay is expected to be lower cost than most existing producing mines1 and the next generation2 of copper projects Low-cost and abundant hydro-electric power is a huge benefit to the Project r

Slide 13: Project Financing
The Company has the ability to fund the Green Project Financing Bay Project with simple financing The Green Bay Copper Gold Mine is a high-quality copper-gold project with strong debt carrying capacity • BurnVoir Corporate Finance appointed debt advisor rsonal use only • Initial advice that debt car

Slide 14: Early Site Works
Early Site Works rsonal use only A huge headstart with existing infrastructure 14

Slide 15: PEA Economic Study
Demonstrating a large scale mine with PEA Economic Study robust economics Recent PEA study work undertaken by industry-leading independent technical experts rsonal use only Flexibility & Conservative Long Multi-Decade Scalability Further Growth Study Inputs Mine Life 2026/27 1.8Mtpa & 4.6Mtpa Commod

Slide 16: Mine Design
Mine Design Simple design allowing for future expansion Mine Design for the 4.6Mtpa (12,500tpd) Case Staged mine design easily expandable from the 1.8Mtpa case up to the 4.6Mtpa case rsonal use only • Underground mining operation using conventional sub-level longhole stoping with mining in multiple

Slide 17: Mill Feed
High grade copper-gold core zone is a huge Mill Feed growth opportunity and remains open Initial mine plan to access high-grade VMS and FWZ zones concurrently High Grade Core Zone of: → Opportunity to offset FWZ with more high-grade VMS through the mill feed 18.1Mt @ 4.3% CuEq (M&I) and Mill Feed by

Slide 18: Regional Discoveries
Regional Discoveries A District scale VMS system owned 100% by FireFly $16.7M Regional Program in FY27 2-3 x Rigs, Extensive Drilling and Geophysics Multiple Regional Targets Across 346km² land package rsonal use only All in close proximity to the planned processing facility & port MING UNDERGROUND

Slide 19: Success in 2026, Ramping Up Regional Exploration for 2027
Success in 2026 Ramping Up Regional Exploration for 2027 FireFly Exploration Strategy is Delivering Multiple FireFly Discoveries in 2026 Strong Regional Exploration Focus in 2027 rsonal use only SIGNIFICANT DISCOVERIES IN 2026: NASH & RDI - VMS Discoveries1 • Maiden drilling returned thick shallow c

Slide 20: Adjacent to Ming: Multiple VMS Clusters
Adjacent to Ming Multiple VMS Clusters Surrounding the Ming Mine and Future Processing and Port Facilities MING MINE UNTESTED 5,535,000mN M&I Resource: 57.3Mt @ 2.4% CuEq MING-ORIENTED CONDUCTIVE TRENDS Shallow Near Inf Resource: 17.3Mt @ 2.8% CuEq Open Down Plunge Surface Drilling 2026 UNTESTED rso

Slide 21: Nash & RDI Discovery
Nash & RDI Discovery Another FireFly Discovery in 2026 and close to the Ming Future Processing Facility • Copper-rich Volcanogenic Massive Sulphide (VMS) discovery • Less than 10km from the Ming Mine and future Processing Facility rsonal use only • FireFly’s maiden drill campaign returned thick near

Slide 22: Mount Joy Discovery
Mount Joy Discovery Another FireFly Discovery in 2026 and close to the Ming Future Processing Facility 5,530,000mN TILT COVE MINE Historical Production 1864-1967 ~ 8 Mt mined: 170 kt of Cu and NUGGET POND MINE 42.5 kOz Au produced rsonal use only Historical Production 1997 - 2004 5,525,000mN 443 kt

Slide 23: Drilling Underway for Maiden Resource in Q1 2027
Drilling Underway for Maiden Resource in Q1 2027 Rambler Main Drilling only 5km to the Ming Future Processing Facility Rambler Main Mine An historical Copper-Gold mine, mined in the 1920s to only 200m vertical depth with mineralisation remaining open rsonal use only • Multiple Drill Rigs Underway •

Slide 24: Little Deer & Tilt Cove
Little Deer & Tilt Cove Mineral Resource remains open – Truckable to Ming Mine TILT COVE REGIONAL EXPLORATION PROJECT – LARGE SCALE DISCOVERY POTENTIAL rsonal use only Historical Mining at Tilt Cove Large Untested EM Anomaly • 115km2 area only ~30km east of Ming Mine Ming Mine • Large copper-gold VM

Slide 25: Catalyst Rich
Green Bay Project1 - Mining, Development & Growth Catalyst Rich Rapidly defining a High-Grade Large-Scale Copper & Gold VMS District Milestone H2 26 H1 27 H2 27 H1 28 H2 28 H1 29 H2 29 Ming Underground Resource Growth UG Resource Drilling 6x Rigs: high grade upper mine rsonal use only extensions, M&

Slide 26: Early Works Pre Construction
Early Works Pre Construction Early Works have commenced Early Works advancing on multiple fronts since conditions were met in April 2026 rsonal use only U ND E R W A Y Agreements U ND E R W A Y Development U ND E R W A Y Camp expansion O NG O I NG Stewardship Community engagement, supply and Undergr

Slide 27: About FireFly Metals Supplementary Information
rsonal use only About FireFly Metals Supplementary Information ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 27

Slide 28: Green Bay Mineralisation
Green Bay has world-class VMS style Green Bay Mineralisation copper-gold grades Upper Volcanogenic Broad Footwall Convergent Massive Sulphide Stringer Zone High-Grade Core Zone rsonal use only Massive Sulphides Cu-Rich Stringers Massive Sulphides Cu-Rich Stringers Multiple lenses of copper and gold-

Slide 29: Production Profile
Multi-decade large scale high-grade copper-gold Production Profile mine in Canada 4.6Mtpa Case 120 11 years @ ~90ktpa LOM CuEq Production 1.8Mtpa (4,800tpd) Including 6 years @ ~100ktpa 1,127kt 1,319kt 4.6Mtpa (12,500tpd) rsonal use only 1.8Mtpa 4.6Mtpa 100 Case Case Payable CuEq Metal (‘000 tonnes)

Slide 30: Operations Overview
Simple industry standard mining & Operations Overview processing techniques Metallurgy Concentrate Infrastructure Mining & Processing & Port & Power rsonal use only LHOS with 20m- Truck & >98% Cu >80% Au & Ag 11.5 24% Cu 6g/t Au 54g/t Ag +$250M Previously Grid Hydro 25m Sublevels Shaft Haulage Recov

Slide 31: Mineral Processing
Mineral Processing A simple conventional process Industry Standard Mineral Processing Setup due to favourable grinding and flotation properties • Mill is designed to be scalable. rsonal use only • Low Capital Expansion o To go from 1.8Mtpa to 4.6Mtpa requires a simple twinning of the circuit and add

Slide 32: Mine Design
Future shaft unlocks additional value Mine Design in the 4.6Mtpa Option Mine Design for the 4.6Mtpa (12,500tpd) Case Mine Animation Current New Historical Decline Decline Please follow the link to a video rsonal use only Shaft Vent Raisebores animation on the FireFly website Shaft showing developmen

Slide 33: Consistent year on year resource growth
Consistent year on year resource growth Green Bay MRE with more to come • Resource contains 1.6Mt of Copper, 1.3Moz of Gold and 12.1Moz of Silver Green Bay Total Resource • 77% is high confidence M&I Resource category ready for conversion to ore reserves Ming Mine & Little Deer Deposit rsonal use on

Slide 34: Green Bay Copper Resource
Green Bay Copper Resource A rare combination of scale and grade 1,400,000 M&I Mineral Resource Contained Copper (t) 6.0 Inferred Mineral Resource Contained Copper (t) M&I Mineral Resource Copper Grade (%) rsonal use only 1,200,000 Inferred Mineral Resource Copper Grade (%) 5.0 Mineral Resource - Con

Slide 35: Green Bay Resource Update
Green Bay Resource Update Green Bay Mineral Resource Statement at August 2026 Ming Deposit Mineral Resource Estimate TONNES COPPER GOLD SILVER CuEq rsonal use only (Mt) Grade Metal Grade Metal Grade Metal Grade (%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%) Measured 3.5 1.5 52 0.2 20 1.3 147 1.7 I

Slide 36: Resource Sensitivity
Potential for significantly more copper-gold Resource Sensitivity metal at various cut-off grades Green Bay MRE Grade-Tonnage Sensitivity Curve • The Green Bay MRE has 160,000,000 Resource @ 0.6% Cu COG Reported Resource 5.0 upside to a reduced Cut Off 80.6Mt @ 2.1% CuEq M&I 60.2Mt @ 2.4% CuEq M&I G

Slide 37: Catalyst-Rich 2026-2027 / Why FireFly Metals
Catalyst-Rich 2026-20271 Mid-2026 H1 2027 Mid - 2027 2028 Mid 2029 rsonal use only Financing & Offtake In Place Construction Progressing First Production Economic Studies Release Regional Exploration Results (PEA/Scoping Study) Ongoing UG & Surface Drilling Final Investment Decision Resource & Reser

Slide 38: PEA Financial Metrics
APPENDIX 1 rsonal use only PEA Financial Metrics Summary of the key study financial metrics for both the 1.8Mtpa (4,800tpd base case) and the 4.6Mtpa (12,500tpd) option ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 38

Slide 39: Cashflow
Significant Free Cash Flow generation with Cashflow self-funding expansion Free Cash Flow Generation (after-tax) - 1.8Mtpa Case LOM Cumulative FCF A$5,373M 450 368 357 370 Annual Free Cash Flow After- 337 322 329 350 299 303 287 282 High-Grade VMS Extensions; Remains OPEN 252 rsonal use only 256 250

Slide 40: Financial Metrics Overview: LOM Physicals
Financial Metrics Overview Compelling LOM Physicals PRODUCTION DATA rsonal use only Mill Feed Tonnage (annual) Mtpa 1.8 4.6 Average Throughput (daily) tpd 4,800 12,500 Mine Life years 32.3 22.3 Copper Head Grade LOM % Cu 1.83 1.58 Gold Head Grade LOM g/t Au 0.62 0.48 Silver Head Grade LOM g/t Ag 5.2

Slide 41: Financial Metrics Overview: Project Economics
Financial Metrics Overview Compelling Project Economics 1.8 Mtpa 4.6 Mtpa FINANCIAL ANALYSIS UNIT Scenario Scenario PEA Spot PEA Spot rsonal use only Metal Prices Metal Prices Metal Prices Metal Prices After-Tax NPV7% A$ $2.2B $3.5B $3.0B $5.0B After-Tax IRR % 41% 55% 39% 54% Post-tax Payback Period

Slide 42: Initial Capital
Low capital intensity, underpinned by existing Initial Capital infrastructure A$ MILLIONS 1.8 Mtpa Case 4.6 Mtpa Case Total initial Capital Cost Mining 254 302 rsonal use only Process plant 124 124 Refundable tax credits On-site surface infrastructure 36 37 Mining On-site rock storage and water mana

Slide 43: Operating Costs
Ming Mine operating costs point to a long-life high Operating Costs margin copper and gold mine 9% 10% LOM OPERATING COSTS 1.8 Mtpa Case 4.6 Mtpa Case 7% 5% Mining A$/tonne milled 99 74 rsonal use only Processing A$/tonne milled 18 14 13% 14% G&A A$/tonne milled 10 5 Total on-site operating cost A$/

Slide 44: Sustaining Capital
Efficient Sustaining Capital Enables Mining Sustaining Capital Flexibility Across Multiple Fronts A$ MILLIONS 1.8 Mtpa Case 4.6 Mtpa Case Total Sustaining Capital Cost Mining 784 780 rsonal use only Process plant 3 3 On-site surface infrastructure 8 8 On-site rock storage and water management 101 17

Slide 45: MRE Supplementary Information
APPENDIX 2 rsonal use only MRE Supplementary Information The Mineral Resource Estimate (MRE) statement accompanied by additional growth information ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 45

Slide 46: Green Bay Resource Update
Green Bay Resource Update Green Bay Mineral Resource Statement at August 2026 Ming Deposit Mineral Resource Estimate TONNES COPPER GOLD SILVER CuEq rsonal use only (Mt) Grade Metal Grade Metal Grade Metal Grade (%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%) Measured 3.5 1.5 52 0.2 20 1.3 147 1.7 I

Slide 47: Resource Sensitivity
Potential for significantly more copper-gold Resource Sensitivity metal at various cut-off grades Green Bay MRE Grade-Tonnage Sensitivity Curve • The Green Bay MRE has 160,000,000 Resource @ 0.6% Cu COG Reported Resource 5.0 upside to a reduced Cut Off 80.6Mt @ 2.1% CuEq M&I 60.2Mt @ 2.4% CuEq M&I G

Slide 48: Reference Data for Slides
APPENDIX 3 rsonal use only Reference Data for Slides Source and key information summary for slides that contain external production and Mineral Resource data ASX: FFM | TSX: FFM • FIREFLYMETALS.COM.AU 48

Slide 49: Appendix 3.1 Copper Resource Data Sources & Figures
Appendix 3.1 Copper Resource Data Sources & Figures M&I Inferred M&I Inferred Mineral Mineral Mineral Mineral Current Effective rsonal use only Project Project Stage Resource Resource Resource Resource Reference Owner Date Contained Contained Copper Copper Copper (t) Copper (t) Grade (%) Grade (%) G

Slide 50: Appendix 3.2: Copper Production & Cost Data Sources 1/3
Sources & Appendix 3.2: Copper Production & Cost Data Figures 1/3 Production (t) – Cost (US$/lb Cu) Current 2025 Actual or – 2025 Actual or Effective rsonal use only Owner Project Status Study Estimate Study Estimate Reference Date Sudbury https://www.sedarplus.ca/csa- Operations Magna Producer 2,73

Slide 51: Appendix 3.2: Copper Production & Cost Data Sources 2/3
Sources & Appendix 3.2: Copper Production & Cost Data Figures 2/3 Production (t) – Cost (US$/lb Cu) Current 2025 Actual or – 2025 Actual or Effective rsonal use only Owner Project Status Study Estimate Study Estimate Reference Date https://filemanager-cdn.mziq.com/published/53207d1c-63b4-48f1-96b7-1

Slide 52: Appendix 3.2: Copper Production & Cost Data Sources 3/3
Sources & Appendix 3.2: Copper Production & Cost Data Figures 3/3 Production Cost (US$/lb (t) – 2025 Cu) – 2025 Actual or Actual or Study Study Effective rsonal use only Current Owner Project Status Estimate Estimate Reference Date Green Bay 25-Aug- 1.50 (1.8Mtpa) FireFly 2026 PEA 35,000 2026 PEA/Sc

Slide 53: Appendix 3.3 Copper Project Study Data Sources 1/2
Appendix 3.3 Copper Project Study Data Sources & Figures 1/2 Annual Initial Capital Current Study Production (Kt) – Cost (US$M) – Effective Owner Project Stage Study Estimate Study Estimate Reference Date rsonal use only Green Bay FireFly 2026 PEA 49 1.50 2026 PEA/Scoping Study design 2026-08-25 (1.

Slide 54: Appendix 3.3 Copper Project Study Data Sources 2/2
Appendix 3.3 Copper Project Study Data Sources & Figures 2/2 Annual Initial Capital Current Study Production (Kt) – Cost (US$M) – Effective Owner Project Stage Study Estimate Study Estimate Reference Date rsonal use only https://koryxcopper.com/wp-content/uploads/2026/02/PEA_of_the_Haib_Copper_Proje
Source: ASX announcement, Nov 24, 2026
More decks from FireFly Metals Ltd
LME Week 202653 slides · Oct 20, 2026
Technical Presentation (August 2026)76 slides · Aug 25, 2026
Diggers & Dealers Kalgoorlie (August 2026)24 slides · Aug 3, 2026
Rising Stars Adelaide (April 2026)34 slides · Apr 9, 2026
BMO Conference 202641 slides · Feb 24, 2026
Investor Presentation (December 2025)45 slides · Dec 11, 2025