Nexus Minerals Ltd. · ASX:NXM
Nexus Minerals — Diggers & Dealers Mining Forum 2024
21 slides from Nexus Minerals's conference presentation, Aug 6, 2024
Slide 1: Updated Diggers and Dealers Mining Forum Company Presentation
UPDATED DIGGERS AND DEALERS MINING FORUM COMPANY PRESENTATION AUGUST 2024 nexus-minerals.com 1
Slide 2: Disclaimer
DISCLAIMER • This document contains forward looking statements. Forward looking statements are not based on historical facts, but are based on Nexus’s current expectations of future results or events. These forward looking statements are subject to risks, uncertainties and assumptions which could ca
Slide 3: Cautionary Statement - Scoping Study
CAUTIONARY STATEMENT - SCOPING STUDY The Scoping Study referred to in this presentation (slide 13) is based on the material assumptions outlined in the announcement released to ASX on 4 June 2024. The Scoping Study has been undertaken to determine the viability of open pit mining and third-party tol
Slide 4: About Nexus Minerals
ABOUT NEXUS MINERALS CORPORATE OVERVIEW NXM OVERVIEW NEXUS MINERALS LIMITED ASX: NXM SHARES 389M SHARE PRICE A$0.038 MARKET CAP A$14.8M CASH (30/06/2024) A$4.4M ENTERPRISE VALUE A$10.4M TOP 20 25% BOARD & MANAGEMENT CHAIRMAN MR PAUL BOYATZIS 40 years equity markets and corporate governance MANAGING
Slide 5: Company Projects
Au Cu COMPANY PROJECTS WESTERN AUSTRALIA Wallbrook Project Large scale gold deposits NSW MINERAL PROJECT Gold and Copper + Critical Minerals - Lithium, Caesium, Tantalum & Tin VICTORIA Bethanga Project Large Porphyry Copper-Gold 5
Slide 6: Wallbrook Gold Project
COMPANY PROJECT WALLBROOK GOLD PROJECT WESTERN AUSTRALIA / EASTERN GOLDFIELDS • 140km northeast of Kalgoorlie in-between Northern Star’s Carosue Dam Operations and Porphyry Mining Centre Operations • Northern Star mining Porphyry Mining Centre sending ore to their Carosue Dam Operations 3.2Mtpa Mill
Slide 7: Systematic and Proven Exploration Approach in an Emerging Gold Camp
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS SYSTEMATIC AND PROVEN EXPLORATION APPROACH IN AN EMERGING GOLD CAMP $ $ Monetisation Resource / Reserve Crusader-Templar Deposit - Updated Open Pit Combined MRE 304,000oz (@ 1.7g/t Au) Definition & *Exploration Target 480,0
Slide 8: Emerging Gold Camp
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS EMERGING GOLD CAMP • Regional “Gold Camp” prospectivity • 5 Mineralised Corridors identified to date – MC1 to MC5 • ~90% of 192km2 tenement package yet to be explored • Gold associated with gravity low + mag low + N/E struc
Slide 9: Branches Prospect
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS BRANCHES PROSPECT ➢ Mineralised corridor now 1.1km x 300m (remains open) ➢ RC drill results have included: • 5m @ 17.91g/t Au (within 8m @ 11.37g/t Au from 118m) • 5m @ 5.45g/t Au (within 36m @ 2.04g/t Au from 43m) • 12m @
Slide 10: Regional Exploration
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS REGIONAL EXPLORATION MC4.1 PROSPECT ➢Initial RC drilling at MC4.1 has returned outstanding results, including: • 12m @ 2.91 g/t Au (within 32m @ 1.40 g/t Au from 8m) • 4m @ 6.19 g/t Au (within 8m @ 3.26 g/t Au from 96m) • 4
Slide 11: Crusader-Templar Prospect - MRE
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR PROSPECT - MRE • 1.6km strike mineralised corridor / 100% Nexus’ owned / Granted ML tenements • Updated Combined Mineral Resource Estimate – 70%+ increase in contained gold • 5.67Mt @ 1.7g/t Au for 304,000
Slide 12: Crusader-Templar Prospect - MRE
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR PROSPECT - MRE Exploration Target = Mineralised envelope Surface to 400m deep / Incl MRE ounces * Note: The potential quality and grade of the Exploration Target is conceptual in nature and as such there ha
Slide 13: Crusader-Templar Scoping Study
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR SCOPING STUDY* • Various options utilising third-party processing plants operating under a toll treatment agreement were considered within a radius of 150km • $3,000 gold price used for study pit shell opti
Slide 14: Crusader-Templar Scoping Study
COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR SCOPING STUDY 1.6km Strong grade and mineralisation continuity over the 1.6km from Crusader South to Templar North 14
Slide 15: NSW Mineral Project – First Mover Advantage – Mega Peg
COMPANY PROJECTS CRITICAL MINERAL TARGETS NEW SOUTH WALES & VICTORIA NSW MINERAL PROJECT – First Mover Advantage – “Mega Peg” • Nexus Minerals has been granted over 15,000km2 of prospective tenure • First mover advantage allows for regional scale exploration targeting with one of the largest pegging
Slide 16: NSW Mineral Project - 15,000km2 Mega Peg
COMPANY PROJECTS CRITICAL MINERAL TARGETS NEW SOUTH WALES & VICTORIA NSW MINERAL PROJECT - 15,000km2 “Mega Peg” • A review of open file geology and whole-rock geochemistry confirmed that much of the exploration ground granted in southern NSW is underlain by reduced, fractionated, peraluminous S-type
Slide 17: Bethanga Porphyry Cu-Au Project
tet Tasman Trt Nor subact, Saumur ‘Yoova Trt (Cowra Buch it npn ber mgenemice) Mua Tract argue ie BETHANGA. Wa er, and generalsed) C Daameran Tat — J & Sc PORPHYRY Cu-AuU F Cairns fe ; = 6B, a Seer ! cy a PROJECT i XS Townsviie $ ie h i x ‘Porphyry Cu-Mo- =a i a Sore TARGETING = LARGE SCALE PORPHY!
Slide 18: Bethanga Porphyry Cu-Au Project
COMPANY PROJECTS BETHANGA PORPHYRY Cu-Au PROJECT VICTORIA BETHANGA PORPHYRY Cu-Au ✓ Fertility study returned positive results ✓ The porphyry target zone covering ~8km x 3km ✓ 3 diamond drill holes for 1,516m recently completed ✓ Drill results consistent with the elemental association of magmatic- hy
Slide 19: Summary
SUMMARY WESTERN AUSTRALIA GOLD NSW MINERAL PROJECT Wallbrook Project - highly prospective and strategic landholding • NSW Mineral Project – ~15,000km2 granted tenure • Crusader-Templar Prospect ➢ First mover advantage allows for regional scale exploration ➢ Scoping Study completed ➢ Processing of re
Slide 20: Nexus Minerals Quarterly Highlights June 2024
NEXUS MINERALS QUARTERLY HIGHLIGHTS JUNE 30 2024 20
Slide 21: Summary Appendix JORC Tables
SUMMARY APPENDIX 1 JORC TABLES Crusader-Templar Prospect Combined JORC 2012 Mineral Resource Estimate (0.4g/t Au cut-off) 21