Morella Corporation Limited · ASX:1MC
Morella — Investor Presentation (August 2024)
24 slides from Morella's investor presentation, Aug 6, 2024
Slide 1: Corporate Presentation
For personal use only Corporate Presentation Focussed on battery materials discovery 2 August 2024 info@morellacorp.com | www.morellacorp.com ASX : 1MC ACN: 093 391 774
Slide 2: Disclaimer and Important Information
Disclaimer and Important Information Summary Information This document contains a summary of information about Morella Corporation Limited associates and advisers disclaim any obligations or undertaking to release any updates or revisions to the (“Morella”) and its activities that is current as at t
Slide 3: Summary
Summary For personal use only MISSION: Discover and develop high-quality lithium deposits to meet the growing global demand for battery materials. VISION: Become a leading player in sustainable lithium production, leveraging innovative exploration techniques. KEY POINTS: ▪ Strong geological team wit
Slide 4: Corporate Snapshot
Corporate Snapshot Key messaging and information For personal use only CORPORATE THEMATIC 1MC 247.2 M ASX CODE SHARES ON ISSUE Project portfolio provides hardrock, brine and sedimentary hosted lithium exposure $11m MARKET CAP AT 4.4c Lithium is integral to the electrification and 46.50% 18.15% green
Slide 5: Management
Management Significant experience in the development and operation of mining and mineral processing projects COMPETITIVE JAMES BROWN - MANAGING DIRECTOR ADVANTAGE For personal use only • 35 years exploration, mining and mine-development experience • Global capital market relationships established to
Slide 6: Portfolio of Prospective Lithium Projects
Portfolio of Prospective Lithium Projects Exploration underway, projects have confirmed lithium mineralization in Tier 1 jurisdictions WESTERN AUSTRALIA HARD ROCK LITHIUM For personal use only • World-renowned lithium exploration and mining region with immediate access to utilities, world-class expo
Slide 7: Tier Mining Destinations
Tier 1 Mining Destinations Stable, low-risk, proven locations for lithium exploration and development Morella operates in Nevada USA & the Pilbara Region of Western Australia both Tier 1 exploration For personal use only destinations with proven history in the exploration for & development of Lithiu
Slide 8: Western Australia – Projects
Western Australia – Projects Pilbara lithium projects – joint venture between Morella (managing partner 51%) and lithium producer Sayona Mining Limited (49%) TABBA TABBA EAST (E45/4703) For personal use only ▪ Located in Tabba Tabba shear zone region < 5 km from Wildcat Resources significant recent
Slide 9: Tabba Tabba East
Tabba Tabba East For personal use only Operating Lithium Mine TENEMENT • E45/4703 is located in the Pilbara of Western Australia and close to the INFORMATION port facilities in the major regional center of Port Hedland Multi-user Export Port • It is 4,160Ha or 41.6sq.km • The tenement is located sou
Slide 10: Tabba Tabba East
Tabba Tabba East For personal use only RECENT • Remote mapping exercise designed to identify linear structures EXPLORATION or potential pegmatites was carried out over the whole tenement area. • Series of surface geochemistry programs were conducted over the following years (2018 – 2021) targeting z
Slide 11: Mallina Lithium Project
Mallina Lithium Project For personal use only Operating Lithium Mine Multi-user Export Port TENEMENT • E47/2983 is located in the Pilbara region of Western Australia and close INFORMATION to the port facilities in the major regional centers of Port Hedland. • It is 8,305ha or 83.05sq.km • The teneme
Slide 12: Mallina Lithium Project
Mallina Lithium Project RECENT • A series of mapping and rock chipping programs from 2017 to 2019 For personal use only EXPLORATION identified spodumene bearing pegmatites with chip assays up to 4.6% Li2O. • Broad programs of soil sampling were carried out from 2017 to 2018 with resultant anomalies
Slide 13: Mt Edon Lithium Project
Mt Edon Lithium Project For personal use only Operating Lithium Mine TENEMENT • The Mt Edon Project tenement package (E59/2092, E59/2055, and Multi-user Export Port INFORMATION E59/2778) is located in Yilgarn province of Western Australia within the historic Paynes Find mining district. • The projec
Slide 14: Mt Edon Lithium Project
Mt Edon Lithium Project For personal use only RECENT • An initial soil program was carried out in 2016 identifying lithium EXPLORATION anomalies at levels 10 times background. • Extensive mapping and rock chip sampling programs were undertaken by Sayona from 2016 to 2019 identifying surface expressi
Slide 15: Nevada USA – Projects
Nevada USA – Projects Nevada lithium projects – joint venture between Morella (60%) and USA based lithium explorer Lithium Corporation (40%) FISH LAKE VALLEY For personal use only ▪ Located between Las Vegas and Reno in Nevada Fish Lake Valley is proximal to the town of Tonopah. ▪ Situated on the we
Slide 16: Fish Lake Valley
Fish Lake Valley For personal use only TENEMENT • Lithium Corporation in conjunction with Morella Corporation has INFORMATION staked 297 placer claims at Fish Lake Valley in the Esmerelda County • The claims cover 4,440Ha or 44.4sq.km • The tenement is located in the northern end of Fish Lake Valley
Slide 17: Fish Lake Valley – Recent Exploration Activity
Fish Lake Valley – Recent Exploration Activity For personal use only RECENT • In January 20241 Morella drilled a single 400m deep core drillhole in EXPLORATION the northern part of the playa to explore the geological context. • Assay results of sediments showed highly elevated lithium concentrations
Slide 18: North Big Smoky - Carvers
North Big Smoky - Carvers For personal use only TENEMENT • Lithium Corporation in conjunction with Morella Corporation has INFORMATION staked 388 placer claims at North Big Smoky Valley in the Nye County referred to as the Carvers project area • The claims cover 2,888Ha or 28.9sq.km • The claims are
Slide 19: North Big Smoky - Carvers
North Big Smoky - Carvers For personal use only RECENT • In December 20221 a Controlled-source Audio-frequency EXPLORATION Magnetotellurics (CSAMT) was undertaken on a single line at Carvers. The results of which showed a deep brine horizon which could potentially host lithium • During May 20232 a f
Slide 20: North Big Smoky - Austin
North Big Smoky - Austin For personal use only TENEMENT • Lithium Corporation in conjunction with Morella Corporation has INFORMATION staked 360 placer claims at North Big Smoky Valley in the Lander County – the staking of this claim area was based on a gravity low form the regional gravity availabl
Slide 21: North Big Smoky - Austin
North Big Smoky - Austin For personal use only RECENT • In May 20231 a CSAMT survey across the total project area was EXPLORATION completed which emphasised the deeper brine anomaly across the project area • Soil sampling has not been carried out due the colluvium cover. FORWARD • A reflective seism
Slide 22: Morella – the future
Morella – the future Tier1 Mining Jurisdictions For personal use only • Morella has exploration holdings in two areas of the world that are most conducive to mining development being Western Australia and Nevada. • With projects in both areas Morella is strategically positioned to develop its known
Slide 23: Morella – building a sustainable future
Morella – building a sustainable future Environmental Responsibility For personal use only Morella is committed to minimising environmental impacts through: • Reducing the size of the drilling footprint – to minimise disturbance • Rehabilitating the sites as soon as practical after drilling has been
Slide 24: For personal use only
For personal use only info@morellacorp.com | www.morellacorp.com ASX : 1MC ACN: 093 391 774