Morella Corporation Limited · ASX:1MC
Morella — Investor Presentation (December 2025)
18 slides from Morella's investor presentation, Dec 9, 2025
Slide 1: ASX Announcement: Morella Investor Presentation
ASX Announcement 9 December 2025 Morella Investor Presentation Morella Corporation Limited (ASX:1MC) (“Morella” or the “Company”) is pleased to provide the attached updated Investor Presentation. For personal use only Contacts for Further Information Investors | Shareholders James Brown Managing Dir
Slide 2: Building a Diversified Critical-Minerals Platform
For personal use only MORELLA CORPORATION LIMITED (ASX:1MC) Building a Diversified Critical-Minerals Platform (From Lithium to Rubidium, Titanium and Beyond) 8 December 2025 info@morellacorp.com | www.morellacorp.com ASX : 1MC ACN: 093 391 774
Slide 3: Important Notice & Disclaimer
Important Notice & Disclaimer This presentation has been prepared by Morella Corporation Limited (ASX:1MC). It contains summary information only and is provided solely for For personal use only general information purposes. The information contained in this presentation is of a general nature and do
Slide 4: State of Play — Positioning Morella for 2026
State of Play — Positioning Morella for 2026 Transition from lithium-only to a diversified critical-minerals strategy Clear Pathway to Multi-Commodity Growth For personal use only with exposure to lithium, rubidium, and titanium–vanadium. Morella is strengthening its lithium foundation Strong WA
Slide 5: Corporate Snapshot
Corporate Snapshot Morella Corporation (ASX: 1MC) (2 December 2025) Project Portfolio Ownership Breakdown by Investor Type For personal use only (2 December 2025) Critical minerals developer with core assets in A diversified portfolio advancing toward Western Australia and Nevada resource and develo
Slide 6: Strategic Positioning for the Energy Transition
Strategic Positioning for the Energy Transition Critical minerals underpin the global shift to: For personal use only Electrification and energy storage Lithium Rubidium Advanced manufacturing and defence Demand linked to EV penetration Listed as a critical mineral in US trending toward 35–4
Slide 7: Project Portfolio Overview
Project Portfolio Overview For personal use only Tabba Tabba East (Li,Ta) Nevada Projects Mallina (Li) West Wodgina (Li) North Big Smoky (Li) Mt Edon (Rb,Li) Fish Lake Valley (Li) Dixon Well (Ti,V) Western Australia Projects ASX: 1MC 6
Slide 8: Mt Edon – Advanced Critical-Minerals Opportunity (Rb, Li)
Mt Edon – Advanced Critical-Minerals Opportunity (Rb, Li) Project Snapshot For personal use only Tier-1 WA jurisdiction (Mid-West), excellent infrastructure access Large LCT-type rare metal pegmatite system Rubidium + lithium mineralisation across multiple bodies Pegmatites up to 80m true th
Slide 9: Dixon Well – High Grade Titanium–Vanadium Opportunity
Dixon Well – High Grade Titanium–Vanadium Opportunity (Ti, V) Project Snapshot For personal use only WA Mid-West | Tier-1 jurisdiction Mafic–ultramafic intrusive sequence prospective for titanium–vanadium systems High-grade Ti–V mineralisation confirmed in early-stage sampling (1) Mineralisa
Slide 10: Mallina (Li) - Pilbara Joint Venture
Mallina (Li) - Pilbara Joint Venture Project Snapshot For personal use only Pilbara Craton | Tier-1 lithium district JV with Elevra Lithium (formerly Sayona Mining Limited) Three mapped pegmatite corridors over ~2 km strike Strong Li-bearing pegmatites confirmed by historical drilling Clos
Slide 11: JV Portfolio – Targeting New Lithium Opportunities in the Pilbara Region
JV Portfolio – Targeting New Lithium Opportunities in the Pilbara Region Tabba Tabba East (Li–Ta) For personal use only Adjacent to Wildcat’s Tabba Tabba project in the same lithium corridor Multiple mapped pegmatite trends + Li–Ta geochem anomalies Geological setting consistent with broader T
Slide 12: Fish Lake Valley (FLV) – Nevada Lithium Portfolio
Fish Lake Valley (FLV) – Nevada Lithium Portfolio Project Snapshot For personal use only Located in the Esmeralda County lithium province, ~40 km from Clayton Valley (Albemarle’s Silver Peak). Historical drilling + surface sampling confirm lithium-bearing brines and sediments across the playa sy
Slide 13: North Big Smoky (NBS) – Nevada Lithium Portfolio
North Big Smoky (NBS) – Nevada Lithium Portfolio Project Snapshot For personal use only Located in Nye County, within a well-known lithium-enriched basin system. Morella completed a 259-hole auger program defined a large lithium anomaly (up to 499 ppm Li), with >40% of samples ≥200 ppm. (1) Gr
Slide 14: 2026 Pipeline & Milestones
2026 Pipeline & Milestones 2026 delivers a multi-asset exploration and Mallina JV (Li) – High-Grade Intercepts + New Targets For personal use only development pipeline Phase 1 RC drilling over priority gravity + structural targets across lithium, rubidium and titanium–vanadium — with clear Exten
Slide 15: Supportive Capital Structure Underpinning Growth
Supportive Capital Structure Underpinning Growth Morella’s capital structure is supported by long-dated, unsecured Director Convertible Loan Facilities (2021 Recapitalisation) convertible facilities provided by Directors and strategic investors. For personal use only A$3.5M unsecured convertible f
Slide 16: Investment Highlights
Investment Highlights Tier-1 critical minerals exposure across Western Australia and Nevada For personal use only Lithium, rubidium, titanium and vanadium portfolio positioned in stable, mining-friendly jurisdictions with strong strategic demand outlooks Mt Edon advancing toward a maiden JORC resour
Slide 17: Competent Persons Statement & JORC Compliance
Competent Persons Statement & JORC Compliance The information in this presentation that relates to Exploration Results is extracted from the following ASX announcements: For personal use only 13 October 2025 – Mt Edon Rubidium Metallurgical Test work 25 November 2025 – Mt Edon Metallurgical Upda
Slide 18: Thank you
For personal use only Thank you info@morellacorp.com | www.morellacorp.com ASX : 1MC ACN: 093 391 774