  1. Slide 1: Talisman Deep Project – Napoleon Lead Technical Presentation

    For personal use only Talisman Deep Project – Napoleon Lead Technical Presentation – March 2021

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by Tamaska Oil and Gas Limited (Company), based on information available as at the date of this presentation. The information in this presentation is provided in summary form and does not contain all information necessary to make a

  3. Slide 3: Napoleon

    Napoleon For personal use only 1. Introduction Talisman & Amulet Primarily from L-M Jurassic sourced Oil NW SE 2. Regional Aspects 3. Structure & Charge C Napoleon 4. Reservoir and Seal R S S 5. Summary 197T_JS ASX:TMK March 2021 Page 3

  4. Slide 4: Napoleon - Introduction

    Napoleon - Introduction For personal use only § TMK owns 20% of the Talisman Deep Project, which contains the Napoleon structure § Located in WA-8-L below Talisman in the Barrow-Dampier Sub-basin § Simple large structure - 3D reprocessing in progress - target size similar to Dorado and neighbouring

  5. Slide 5: WA-8-L Location

    WA-8-L Location Napoleon in liquids rich Barrow-Dampier Sub-basin For personal use only Napoleon-1 Napoleon ASX:TMK March 2021 Page 5

  6. Slide 6: Exploring in similar way to Dorado

    Exploring in similar way to Dorado Superior Imaging -> Discovery For personal use only Ref: https://www.carnarvon.com.au/wp-content/uploads/2020/07/Investor-Presentation.pdf ASX:TMK March 2021 Page 6

  7. Slide 7: 3D Pre-SDM Reprocessing

    3D Pre-SDM Reprocessing For personal use only § Panaeus 3D seismic is being reprocessed by DUG (Down Under Geophysical), using the largest computer processing power in the southern hemisphere § The project is being supervised by industry expert - Debenham’s Geophysical Consultancy § Completion - Apr

  8. Slide 8: 2020 Pre-SDM Strike & Dip Lines

    2020 Pre-SDM Strike & Dip Lines Superior Imaging For personal use only Napoleon-1 Napoleon ASX:TMK March 2021 Page 8

  9. Slide 9: 2002 Original Strike & Dip Lines

    2002 Original Strike & Dip Lines Poorer Imaging For personal use only Napoleon-1 Napoleon ASX:TMK March 2021 Page 9

  10. Slide 10: Hydrocarbon Charge

    Hydrocarbon Charge For personal use only § Hydrocarbon charge is addressed by geochemical modelling that involves: 1. Determining the type of source rocks available in the area; 2. Determining the type of hydrocarbons present in nearby wells/fields, correlating the two; 3. Predicting timing and amou

  11. Slide 11: Stratigraphy, Plays, Traps & HC migration

    Stratigraphy, Plays, Traps & HC migration WA-8-L & surrounds For personal use only ASX:TMK March 2021 Page 11

  12. Slide 12: Large simple structure with in-situ liquids rich mature charge

    Large simple structure with in-situ liquids rich mature charge For personal use only Talisman & Amulet Primarily from L-M Jurassic sourced Oil NW SE 197T_JS Depth (m) Line of Section S Amulet S C Napoleon Talisman R S S Napoleon 197T_JS WA-8-L ASX:TMK March 2021 Page 12

  13. Slide 13: Evidence of HC escape features

    Evidence of HC escape features Pockmarks at top reservoir For personal use only Seismic Coherency at Reservoir ASX:TMK March 2021 Page 13

  14. Slide 14: Napoleon – Summary

    Napoleon – Summary For personal use only § Located in the premier Barrow-Dampier Sub-basin – NE liquids rich corner § Reprocessing and basin analysis studies (including geochemical modelling) in progress § Large simple structure - significant potential volume § Simple tilted fault block with proven

  15. Slide 15: TMK Capital Structure

    TMK Capital Structure For personal use only Performance TMK Capital Structure Shares Shares Existing 895,000,000 Consideration for acquisition of 20% interest 45,000,000 45,000,000* in the Talisman Deep Project (Napoleon) Total 940,000,000 45,000,000* * The terms and issue of the Performance Shares

  16. Slide 16: Board and Management

    Board and Management For personal use only Brett Lawrence M.Pet.Eng., B.Eng., B.Com. – Managing Director Brett has 16 years of diverse experience in the oil and gas industry. He worked with Apache Energy for over eight years, performing roles in drilling engineering, reservoir engineering, project d