Adx Energy Ltd · ASX:ADX

Adx Energy — Investor Presentation (February 2016)

19 slides from Adx Energy's investor presentation, Feb 25, 2016

  1. Slide 1: ADX Energy Investor Presentation February 2016

    For personal use only ADX Energy INVESTOR PRESENTATION February 2016 www.adx-energy.com 1

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only This document has been prepared by ADX Energy Ltd for the purpose of providing an activity update to interested analysts/investors and shareholders. Any statements, opinions, projections, forecasts or other material contained in this document do not constitute any co

  3. Slide 3: Corporate Summary and Capital Structure

    CORPORATE For personal use only Summary  An ASX listed international energy explorer (ASX:ADX)  Asset refocus on low cost, low risk, profitable asset commercialisation  Portfolio of Appraisal, Development and Exploration assets  Geographic focus – Offshore Mediterranean and Onshore Europe  Expe

  4. Slide 4: Geographic Focus

    GEOGRAPHIC FOCUS Offshore Mediterranean and Onshore Central Europe For personal use only - Acreage Contains 1 Oil Field, 3 Oil Discoveries and 1 gas condensate discovery Parta, Romania 50% operated Pannonian Basin Provencal Tyrrhenian basin Sea Aegean extension 4 Sicily Channel Licenses Libyan Sea (

  5. Slide 5: Strategic Direction - Current Assets

    STRATEGIC DIRECTION - Current Assets  Commercialisation of the Nilde Field Area Resources – Italy Sicily Channel For personal use only  Tangible low risk resource with proven production performance and substantial 1C resource (20 MMBBLS) that can be converted to reserves at low cost  Excellent re

  6. Slide 6: Current Assets

    For personal use only CURRENT ASSETS  Nilde Field Area Project – Sicily Channel, Italy  Parta Exploration Project – Onshore Romania  Kerkouane Appraisal & Exploration Project - Offshore Tunisia 6

  7. Slide 7: Current Assets: Nilde Oil Field Area

    CURRENT ASSETS: Nilde Oil Field Area Background For personal use only  1 Abandoned Oil Field with 3 Oil discoveries (all tested)  Nilde field produced but abandoned early  Excellent seismic and well data base  34 mmbo remaining 2C recoverable resources (independently audited) Source: offshoreene

  8. Slide 8: Nilde Field Area - Contingent Oil Resources

    NILDE FIELD AREA - Contingent Oil Resources Gross Contingent1 Resources Volumes (MMstb) For personal use only 1C 2 2C2 Notes 3C2 Estimate Contingent Resources: those quantities of petroleum Estimate Estimate estimated, as of a given date, to be potentially recoverable from known accumulations but, f

  9. Slide 9: Nilde Field Area - Key Project Attributes

    NILDE FIELD AREA - Key Project Attributes • Historical production and test data for all undeveloped discoveries provides For personal use only confidence on reservoir performance and crude quality (light oil, 39⁰ API). • A substantial1C resource at Nilde and Nilde-Bis of 18 million barrels. • Potent

  10. Slide 10: Nilde Oil Field - Production History

    NILDE OIL FIELD - Production History Nilde oil produced: 21 mmbls from 112 mmbls OIIP •21 mmbo 39 API oil For personal use only Initial reserves post sanction in 1979: 6.3 mmbbls ~10,000 bbls/d produced mainly from 7860 bbls/d one vertical well (Nilde-2) 5700 bbls/d • Late life well added (Nilde 6)

  11. Slide 11: Nilde Field History - Early Abandonment

    NILDE FIELD HISTORY – Early abandonment For personal use only Peak production coincided with water break through and 1988 oil price collapse NILDE total annual Oil PRICE – REFINERY PRICES production in barrels of oil (grey: real, blue: nominal) New FPSO: Peak production: US$40 oil US$13 oil US $40 o

  12. Slide 12: Nilde Field Area Commercialisation - Immediate Way Forward

    NILDE FIELD AREA COMMERCIALISATION - Immediate Way Forward For personal use only  Develop a reservoir production simulation model utilising production history to better predict future well performance and optimise development  Engage with contracting companies to determine a fit for purpose and co

  13. Slide 13: Current Assets - Parta Permit Progress

    CURRENT ASSETS – Parta Permit Progress For personal use only  30 months extension of first exploration phase agreed with NAMR, government ratification pending  2 D seismic acquired indicating excellent prospectivity  Extensive landowner work to secure access 3D area resulting in community support

  14. Slide 14: Parta 3D Seismic Is a Game Changer

    PARTA 3D SEISMIC IS A GAME CHANGER “Shooting Fish in a barrel” For personal use only S N PINCHOUT tested TRAPS Oil production 1.2 mmscf/d Ch IVb_ IVc_ IVa IVb_ Va IVc_ TS2 VI Vc BLOW OUT VIII  Oil & Gas charge proven 8 sqkm trap area tested  Multi – horizon play proven 1.2 mmscf/d  Use 3D seismic

  15. Slide 15: Kerkouane Permit - Offshore Tunisia

    KERKOUANE PERMIT – Offshore Tunisia Nilde oil field  The ADX Tunisian offshore license For personal use only area encompasses approx. 5,000 km² of a proven hydrocarbon Dougga – West (oil) 227 mmboe Best case province. Prospective Resource  Kerkouane (Tunisia) offers several very large resource siz

  16. Slide 16: Growth Strategy

    GROWTH STRATEGY - Low cost, low risk production in areas we know well. For personal use only - Compliment current assets with low opex cash flow. - Leverage value development at Nilde to secure other assets Central & Southern Europe Opportunities: A number of appraisal and re development opportuniti

  17. Slide 17: Summary - Playing to Our Strengths

    SUMMARY – Playing to our strengths  A strategic adjustment has been necessary to adapt the new oil price regime >> For personal use only Reduced administration costs and asset refocus  The “Nilde Oil Field Area” offshore Italy has the potential for a significant reserve >> establishing a commercia

  18. Slide 18: Immediate Activity - Outlook for 2016

    IMMEDIATE ACTIVITY – Outlook for 2016 For personal use only 1. Corporate Continue to seek efficiencies and cost cutting opportunities, achieve recognition for tangible and substantial asset potential 2. Italy – Nilde area: Move contingent resources into reserves and thereby create significant shareh

  19. Slide 19: For personal use only

    For personal use only Ian Tchacos Executive Chairman Paul Fink Chief Executive Head Office: Level 2, Suite 14 210 Bagot Road, Subiaco, WA, 6008 Tel: 61 8 9381 4266 Fax: 61 8 9381 4766 Website www.adxenergy.com.au Email admin@adxenergy.com.au ASX Code ADX 19

ADX Energy — Investor Presentation (February 2016) on 6ix