Goldquest Mining Corp. · TSXV:GQC

Goldquest Mining — Investor Presentation (July 2009)

25 slides from Goldquest Mining's investor presentation, July 2009

  1. Slide 1: Midnite - July 2009

    Ee Midnite JULY 2009 goldquesicorp.com

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Statements in this document, to the extent not based on historical events, constitute forward-looking statements. Forward-looking statements include, without limitation, statements evaluating market and general economic conditions in the preceding sections, and statements

  3. Slide 3: GoldQuest - (TSX-V: GQC)

    GoldQuest - (TSX-V: GQC) Focused on generative exploration in Dominican Republic since 2001 Joint Venture in the DR with Gold Fields Biggest individual shareholders are Gold Fields Entered into agreement to acquire polymetallic project in NW Spain Strong pipeline of new discoveries in the DR Capital

  4. Slide 4: Management & Directors

    Management & Directors Alistair Waddell Previously lived & worked in Dominican Republic President, CEO & Director Formerly Senior Geologist – AngloGold Ford Cannon 30+ years experience in mining and finance Chief Financial Officer Former commercial banker Felix Mercedes 20+ years mining, exploration

  5. Slide 5: Dominican Republic Overview

    Dominican Republic Overview Pro mining & pro foreign investment Well established, competitive mining code Long history of mining; industry important to DR economy World class mining districts • Falconbridge Dominicana – Nickel. 2007 - 51% of total DR exports - $1.2B • Barrick / Goldcorp - Pueblo Vie

  6. Slide 6: DR Exploration Programme

    DR Exploration Programme Gold Fields funded generative exploration programme 2,600 stream sediment samples taken 28,500 rock and soil samples taken Over 50 significant targets generated Gold Fields ~8.5 % share position in GQC

  7. Slide 7: DR Project Overview

    DR Project Overview – Focused on District Size Projects Las Animas District - (Excluded from GF JV) Gold rich Copper-Zinc Massive Sulphide El Toro and Santa Ana mesothermal vein systems San Juan District Las Tres Palmas, Jengibre, Loma Viejo Pedro & Los Comios Epithermal Au-Cu-Zn targets Pueblo Viej

  8. Slide 8: Los Comios

    0K 2,050.00) Los Comios ¥ Las Tres Palmas Loma Viejo Pedro Jengibre Santa Ana Las Animas Cerro Dorado Cretaceous Volcanic belt Soren ' kilometers rincipal GoldQues I Project Falcondo.Ni Xstrata Mine = 1 Riedraiman ‘Barrick-GoldCorp thine Tierra Mala fi \ ' ' Maimion Cu=Au-Zn ' GlobeStar mine ' Cur

  9. Slide 9: DR - Las Animas

    DR - Las Animas Geological sequence Felsic volcanics in contact with sediments Massive sulphide located at volcanic-limestone contact Deposit is steeply dipping Massive sulphide Copper-zinc, gold rich massive sulphides

  10. Slide 10: DR - Las Animas

    DR - Las Animas - Diamond drilling 47 diamond drill holes completed. Five principal N-S fences of drill holes targeting sediment- volcanic contact. NI 43-101 compliant resource calculation completed. Indicated: 1.00MT @ 2.95 g/t Au, 2.70% Cu, 3.36% Zn & 58.6 g/t Ag. Inferred: 0.62MT @ 1.66 g/t Au, 3

  11. Slide 11: DR - Las Animas

    DR - Las Animas LA-10 142 m @ 1.92 % Zn, 2.59 % Cu, 2.50 g/t Au & 36.58 g/t Ag LA-26 67.77 m @ 3.98 % Zn, 3.38 % Cu, 1.49 g/t Au & 26.52 g/t Ag LA-38 Extended system from surface to >500m. Eight exploration drill holes completed on Guazumitas zone 900M to SE.

  12. Slide 12: DR - Las Animas – Soil Geochemistry – Au

    …………………………………………………………………………………………………………………………………..……………. DR - Las Animas – Soil Geochemistry – Au …………………………………………………………………………………………………………………………………………..…….

  13. Slide 13: DR - San Juan Projects

    DR - San Juan Projects = sae SAN JUAN DISTRICT PROJECTS) Rock Sample Data Au PPB | @ 5,000 to 66,000 @ 1,000to 5,000 @ 500to 1,000 Oto 500 aor “LAS TRES PALMAS

  14. Slide 14: DR - San Juan - Las Tres Palmas

    DR - San Juan - Las Tres Palmas Geology: Intermediate Sulphidation replacement style. Work to Date: Trenching: 48M @ 5.22g/t Au Drilling: 63m @ 2.19g/t Au Next Steps: Drill testing outboard & deeper feeder targets

  15. Slide 15: DR – San Juan - Las Tres Palmas

    DR – San Juan - Las Tres Palmas - Drill Cross-section DDH: 18m @ 6.5 g/t Au Trench: 48m @ 5.2 g/t Au v v v v v v v v v v v v v v v v v v ?silica-sulfide sto ckwork & breccia s ili c if ie d dacite v v v v DDH: 63m @ 2.19 g/t Au v v DDH: 20m @ 0.26 v Auv v v g/t v v v v v v v v v v v v v v v v v v v

  16. Slide 16: DR – San Juan - Jengibre Project

    DR – San Juan - Jengibre Project New Discovery High-grade replacement style Zn-Cu-Au-Ag 7 drill holes completed by GF Drilling 54M @ 1.03 g/t Au Outcropping mineralization & alteration Silica-pyrite with sphalerite

  17. Slide 17: DR - Los Comios – Rock samples

    DR - Los Comios – Rock samples 59 Rocks >1% Cu 24 Rocks >1 g/t Au

  18. Slide 18: DR - Pueblo Viejo District

    DR - Pueblo Viejo District Piedra Imán project Within 3 km of Pueblo Viejo mine Targets on mapped NW and N-S structural corridors Lithocap targets – Geological, Geochemical & Geophysical Advanced argillic alteration ~8 km²

  19. Slide 19: Spain Overview

    Spain Overview Pro mining & pro foreign investment as part of EU Certain expenditures eligible for refunds from government Long history of mining Year round exploration World class mining districts

  20. Slide 20: Toral project Overview

    Toral project Overview GoldQuest has entered into an agreement with Lundin Mining to acquire a 100% interest in Toral project. Historical, non NI-43-101 compliant resource of 5.4 million tonnes grading 9% Zn, 6% Pb and 45 g/t Ag. Zinc-rich and pyrite-poor sulphides. Excellent infrastructure - power

  21. Slide 21: Spain – Toral Zn-Pb-Ag Project

    Spain – Toral Zn-Pb-Ag Project

  22. Slide 22: Next Slide

    ~ QUEST Next Slide <r Drillsite access road Power line Rail road

  23. Slide 23: Longitudinal Section

    Spain – Toral Zn-Pb-Ag Project 5.4 million tonnes grading 9% Zn, 6% Pb and 45 g/t Ag Elev. 800 Valley 600 400 200 0 - 200 - 400 600 m Grade thickness map Historical Resource figure not NI 43-101 compliant Am > 45 38 < Am <45 Longitudinal 30 < Am <38 % Zinc x thickness Section 22 < Am < 30 15 < Am <

  24. Slide 24: Going Forward – 2009 Plan

    Going Forward – 2009 Plan Las Animas – Testing of targets in district and along strike. Regional follow-up of geochemical targets. El Toro – Complete programme of trenching. San Juan exploration– Las Tres Palmas, Los Comios & Jengibre. Complete Toral acquisition from Lundin Mining. Upon completion o

  25. Slide 25: GQC: TSX-V For further information

    GQC: TSX-V For further information: www.goldquestcorp.com Tel: +1-604 632 4333

GoldQuest Mining — Investor Presentation (July 2009) on 6ix