Paladin Energy Ltd · ASX:PDN

Paladin Energy — Non-Deal Roadshow (March 2019)

29 slides from Paladin Energy's roadshow presentation, Mar 6, 2019

  1. Slide 1: Paladin Energy Ltd Toronto Canada Road Show

    PALADIN ENERGY LTD TORONTO CANADA ROAD SHOW MARCH 2019 ASX: PDN

  2. Slide 2: Disclaimer and Notes

    DISCLAIMER AND NOTES JORC AND NI 43-101 MINERAL RESOURCES AND ORE RESERVES This presentation includes certain statements that may be deemed “forward-looking In the following presentation, for those deposits that are reported as conforming to the statements”. All statements in this presentation, othe

  3. Slide 3: A Global Uranium Leader & Proven Producer

    A GLOBAL URANIUM LEADER & PROVEN PRODUCER The best leverage to uranium upside

  4. Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT CAPITAL STRUCTURE As at 22/02/2019 SHARE PRICE SINCE RE-STRUCTURE 120 $0.25 Shares on issue 1,752M Millions Share price A$ 19.0c Market capitalisation A$ 332.8M 100 $0.20 Market capitalisation US$1 236.3M Cash US$2 33.0M 80 Debt US$2 125.9M $0.15 Enterprise value US$ 329.2M 60 $0.

  5. Slide 5: Investment Highlights

    INVESTMENT HIGHLIGHTS Proven producer and product. Diversified portfolio of developed mines and projects with unsurpassed uranium price leverage (~8Mlbpa idled capacity) Lead time and capital associated with a re-start to bring Langer Heinrich back into production is less than new projects Explorati

  6. Slide 6: Meet Our Board of Directors

    MEET OUR BOARD OF DIRECTORS  Mr Crabb is a solicitor by background and was a partner in Perth firms Robinson Cox (now Clayton Utz) and Blakiston & Crabb (now Gilbert & Tobin). Mr Rick Crabb  He has over 25 years experience specialising in mining, corporate and commercial law, advising multinationa

  7. Slide 7: Meet Our Senior Management

    MEET OUR SENIOR MANAGEMENT  Mr Sullivan brings 30 years of diversified mining experience to Paladin, across multiple commodities and projects domestically and internationally. His experience spans strategic planning in mines and smelters; feasibilities; commissioning; mine expansion and restructuri

  8. Slide 8: Strong Demand in the Uranium Market

    STRONG DEMAND IN THE URANIUM MARKET A solid long-term outlook

  9. Slide 9: The Uranium Story Is Compelling

    THE URANIUM STORY IS COMPELLING Spot Price 2012 - 2018 Underlying estimated uranium use based on Cumulative supply cuts $50 nuclear power generation 2016 2017 2018 2019 2020 $45 250 0 Compound $40 “Under buying” -5 Reduction $35 200 Rabbit Lake U308 Spot Price (US$/lb) -10 $30 Ranger -15 Mlbs U3O8 1

  10. Slide 10: It's All About Supply

    IT’S ALL ABOUT SUPPLY FUTURE CONTRACTED COVERAGE RATES OF US & EUROPEAN UTILITIES  +40Mlbs taken out of the market in  Global mine supply now 120.00% recent years (including Ranger 2019) structurally impaired and unable to respond in time to price Contract Coverage (% of total requirements) 100.00

  11. Slide 11: Green Shoots Are Still Visible

    GREEN SHOOTS ARE STILL VISIBLE  IPCC REPORT – Global warming increase by 1.5˚C by 2030  China - Plans to have 56 reactors operating by 2020 and 180 reactors, or 220% increase, by 2030 to reduce its reliance on coal  India following suit with 21 reactors into operation by 2031  17 new reactors in

  12. Slide 12: China Key Driver of Demand

    CHINA KEY DRIVER OF DEMAND  China National Nuclear Corp (CNNC) looking to invest in overseas uranium mines to secure supply for an expected ramp-up in China’s nuclear power generation. 1.4Blb’s stated requirement.  CNNC worth $100 billion as China's premier energy company, with investments includi

  13. Slide 13: Possible Outlook – Mid Level Growth

    POSSIBLE OUTLOOK – MID LEVEL GROWTH 200 Supply gap 150 16.8Mlbs 100 50 0 2021 Implied Consumption 2021 Secondary Supply 2021 Requirement for Mined Current Mined Supply Returnable Care and Source: Supply Maintenance Supply - UxC, TradeTech and Paladin Research Care and maintenance The industry also n

  14. Slide 14: Vanadium: A New Opportunity

    A NEW OPPORTUNITY VANADIUM Vanadium to be produced as a co-product

  15. Slide 15: Vanadium - A New Opportunity for Langer Heinrich

    VANADIUM - A NEW OPPORTUNITY FOR LANGER HEINRICH $35 Vanadium Price V2O5 Flake 98% $30 $25 $20 $15 $10 $5 $0 2013 2014 2015 2016 2017 2018 2019  Opportunity to produce Vanadium at LHM  Estimated production circa 1.3Mlbs  Long term price of US$8.50/lb  Significant price increase due to Chinese re

  16. Slide 16: Vanadium Vital for Next-Gen Industries

    VANADIUM VITAL FOR NEXT-GEN INDUSTRIES Steel making  Steel industry consumption continues to grow – China’s new high-strength rebar 4.5% 3.5% Energy storage specification standards implemented in 1% November 2018, using alloys such as Superalloys (aerospace etc) vanadium has created a supply shorta

  17. Slide 17: Langer Heinrich: A Strategic Tier-One Asset

    A STRATEGIC TIER-ONE ASSET AT LANGER HEINRICH A LOW COST, LONG LIFE URANIUM MINE

  18. Slide 18: Langer Heinrich

    LANGER HEINRICH  Lowest cost open-pit mine globally1  Top 10 Uranium Mine by Production2  +20 year mine life3  43.3Mlb cumulative production. Remaining resources 123.4Mlbs.  Stable government Mineral Resources depleted to 30th June 2018 Class Tonnes Mt Grade ppm U3O8 Mlb Measured 60.7 515 68.7

  19. Slide 19: We Are Planning for a Rapid, Reliable Restart

    WE ARE PLANNING FOR A RAPID, RELIABLE RESTART OPERATIONAL REVIEW OF LANGER HEINRICH MINE (LHM) CONCEPT STUDY COMPLETED TO OPTIMISE RESTART: Defining further Prefeasibility study Prefeasibility study Verifying Care & Learning from ten years potential improvements for rapid, low-risk for optimised pla

  20. Slide 20: Adding Value Through a Rigorous Study Methodology

    ADDING VALUE THROUGH A RIGOROUS STUDY METHODOLOGY Improve definition of restart scope – repair, improve processing facility and Process debottlenecking study Mineral Resource definition – Process test work for improvements – potential for drilling to build Vanadium geology vanadium (~1.3Mlb pa). Als

  21. Slide 21: Be Ready! But Continue to Optimise

    BE READY! BUT CONTINUE TO OPTIMISE Rapid Restart Study RAPID RESTART STUDY:  6-9 month Prefeasibility Study focused on optimising the current facility  6-9 month Feasibility Study to enable LHM Restart to be triggered from June 2020 PROCESSING UPGRADE STUDY: Processing Upgrade Study  12-15 month

  22. Slide 22: We Have Verified Our Restart and LOM Improvement Capital

    WE HAVE VERIFIED OUR RESTART AND LOM IMPROVEMENT CAPITAL Relatively low initial capital requirements of circa US$100M Post production plant optimisation capital requirements (excludes C&M and study costs) (funded from operating cash flows) Plant repair and Working capital Pre-start tailings Back-End

  23. Slide 23: World Wide Product Cost Curve – All Projects

    WORLD WIDE PRODUCT COST CURVE – ALL PROJECTS 85 80 75 70 65 60 55 50 Full Cost (US$/lb) 45 40 Production Cost Curve LHM All-in Costs 35 Target LOM All-in costs 30 Aspirational Target LOM All-in costs 25 20 15 10 5 0 0 50 100 150 200 250 300 350 400 450 500 550 Cumulative Production Capacity (Mlb U3O

  24. Slide 24: Kayelekera

    KEYELEKERA 3.3Mlbpa Proven Producer

  25. Slide 25: Kayelekera Mine

    KAYELEKERA MINE  Developed mine on care and maintenance – fully built mine commissioned in 2008 with 3.3Mlbpa nameplate capacity  Restart implementation plan under preparation incorporating optimised economics  >5 Year Remaining Mine Life1  10.9Mlb - Production before being placed on care and ma

  26. Slide 26: Contact Us

    PALADIN ENERGY LTD CONTACT US HEAD OFFICE INVESTOR RELATIONS Level 4, 502 Hay Street Karen Oswald Subiaco Western Australia 6008 T: +61 (0) 423 602 353 PO Box 201, Subiaco, Western Australia 6904 E: Karen.oswald@paladinenergy.com.au T: +61 (0) 8 9381 4366 E: paladin@paladinenergy.com.au www.paladine

  27. Slide 27: Appendix: Resource & Reserve Tables

    30 June 2018 APPENDIX Mineral Resources NAMIBIA Measured Indicated Langer Heinrich Mt 60.7 21.5 Grade ppm U3O8 515 460 Mlb U3O8 68.7 21.7 RESOURCE & RESERVE TABLES Inferred 8.7 470 9.0 Stockpiles 30.8 355 24.0 Total Namibia 121.7 460 123.4 MALAWI Kayelekera 30 June 2018 Measured 0.7 1,010 1.7 Mlb Pa

  28. Slide 28: A Quality Global Suite of Exploration & Dev. Assets

    A QUALITY GLOBAL SUITE OF EXPLORATION & DEV. ASSETS Mt Isa (82/91/100%)  Direct 50% interest in 2,724ha of licences and 82% ownership of ASX-listed Summit Resources Canada  Largest uranium deposit in Manyingee Queensland  Potential for future development 41.5Mlb of 5-7Mlbpa uranium mine Michelin

  29. Slide 29: Global Vanadium Production

    GLOBAL VANADIUM PRODUCTION 90% of the world’s vanadium is produced by four countries RUSSIA major producer with 17% of global Vanadium production vanadium produced from soared from 2000-2014 steel slag as Chinese steel production production boomed but no more growth is CHINA expected from this produ

Paladin Energy — Non-Deal Roadshow (March 2019) on 6ix