Paladin Energy Ltd · ASX:PDN
Paladin Energy — Shareholder Meeting (November 2026)
39 slides from Paladin Energy's shareholder meeting presentation, Nov 17, 2026
Slide 1: 2026 Annual General Meeting - MD and CEO Presentation
rsonal use only 17 November 2026 2026 Annual General Meeting MD and CEO Presentation
Slide 2: Important Notice
Important Notice This presentation (Presentation) is dated 17 November 2026 and has been damage which may be suffered by any person as a consequence of any JORC (2012) and Qualified Person as defined by NI 43-101. prepared by Paladin Energy Ltd (the Company or Paladin) based on information in this P
Slide 3: A global operational uranium producer with scale and growth potential
Leveraging market Delivering sequenced strength production growth rsonal use only Capitalising on growing demand Advancing a multi-decade for nuclear energy, a secure and production, development and reliable source of baseload power exploration pipeline across Namibia, essential for meeting the worl
Slide 4: Multi-decade production and growth pipeline
Multi-decade production and growth pipeline to capitalise on the growing uranium supply deficit rsonal use only Namibia Canada Advanced exploration portfolio in Canada and Australia Production Development and Preliminary Economic Advanced exploration1 Early-stage exploration exploration Assessment (
Slide 5: Delivering Paladin's near-term growth strategy
Delivering Paladin’s near-term growth strategy rsonal use only Maximise the Unlock the value Advance exploration value from LHM of the PLS Project assets Deliver safe, consistent operational and Progress the project through key Focus on both near mine and financial performance permitting and regulat
Slide 6: FY2026 Highlights
FY2026 Highlights LHM achieved or exceeded FY2026 guidance rsonal use only 4.82Mlb U3O8 US$304.3M US$52.2M produced Sales revenue from the Gross profit sale of 4.35Mlb U3O8 3.2 99% 55 Group TRIF1 of LHM employees are community programs across Namibia and at 30 June 2026 Namibian Nationals Canada Ref
Slide 7: A successful year of delivery, growth and strategic progress
A successful year of delivery, growth and strategic progress rsonal use only Nov 2026 Aug 2026 Jul 2026 Jun 2026 A$525M Jun 2026 Mutual equity raising Jun 2026 Protocol Benefits completed10 Jun 2026 LHM ramp-up signed with Agreement the CNSC with Birch Feb 2026 Paladin added successfully Narrows com
Slide 8: A$525M equity raising positions Paladin for its next phase of growth at PLS
A$525M equity raising positions Paladin for its next phase of growth at PLS Significant equity financing represents a material de-risking milestone for PLS development rsonal use only Compelling PLS Maintaining PLS Advancing growth Enhanced balance investment case Project momentum opportunities shee
Slide 9: Langer Heinrich Mine, Namibia
rsonal use only Langer Heinrich Mine Namibia
Slide 10: LHM: A strategic uranium producing asset
LHM: A strategic uranium producing asset rsonal use only Located in Namibia, the third largest global uranium producing country accounting for ∼13% of global production1 Strong Government and community support for uranium mining in Namibia with excellent local infrastructure and proximity to the Wal
Slide 11: LHM ramp-up successfully completed
LHM ramp-up successfully completed Strong operational performance, achieving or exceeding FY2026 guidance on production, US$43.3/lb sales and cost of production cost of production1 rsonal use only FY2026 guidance range US$44/lb to US$48/lb 4.82Mlb U3O8 4.35Mlb U3O8 US$12M in capital produced sold ex
Slide 12: LHM September 2026 Quarter Results
LHM September 2026 Quarter Results Mining Processing Sales rsonal use only Mining activities continued to progress to The planned maintenance shutdown and ore Strong Average Realised Price1 reflected plan, focused on the J pit as development characteristics associated with the mining increasing uran
Slide 13: LHM delivering uranium to Tier-1 customer base
LHM delivering uranium to Tier-1 customer base Industry leading contract book leveraging strong uranium market fundamentals rsonal use only 1.16Mlb US$79.4/lb 20Mlb 84% U3O8 sold in the first three months of average realised price1 in the first of U3O8 contracted of the LHM Ore Reserve FY2027 three
Slide 14: LHM FY2027 Guidance
LHM FY2027 Guidance1 rsonal use only Guidance (100%) 2,3 FY2027 U3O8 Produced4 Mlb 5.1 – 5.6 U3O8 Sold5 Mlb 4.8 – 5.3 Cost of Production6 US$/lb 44 – 48 Capital Expenditure7 US$ 29 – 35 • Higher production is expected in the second half of FY2027 as higher-grade ore feed to the processing plant incr
Slide 15: Patterson Lake South, Canada
rsonal use only Patterson Lake South Canada
Slide 16: PLS Project: Globally material project
Premier location Shallow & high grade Located in the Athabasca Basin region, Conventional mining, via decline access. rsonal use only the world’s premier high-grade uranium Shallow nature of the Triple R deposit mining district with access to established supports a simple development approach infras
Slide 17: Canada's Athabasca Basin region
Canada’s Athabasca Basin region PALADIN CANADA PROPERTIES DEVELOPMENT PROJECTS PAST PRODUCERS DEPOSITS The world’s premier high-grade uranium mining jurisdiction CURRENT OPERATIONS SHOWINGS MILL rsonal use only Jurisdiction: stable, supportive government and communities with access to a skilled work
Slide 18: Shallow, high-grade orebody with significant extension potential
Shallow, high-grade orebody with significant extension potential Triple R deposit remains open along strike and at depth Indicated Resource rsonal use only Inferred Resource Open along strike and at depth Decline access Conventional mining Load and haul Bulk freezing Shallow deposit allows Mining is
Slide 19: Building respectful, long lasting relationships with local communities
Building respectful, long lasting and mutually beneficial relationships with local rsonal use only communities and Indigenous peoples where we operate Paladin respects and upholds Indigenous rights throughout the lifecycle of our operations that take place on the lands of Indigenous peoples and seek
Slide 20: De-risking permitting pathway
De-risking permitting pathway rsonal use only Pathway to production Dec 2024 Mar 2025 Aug 2025 Feb 2026 Jun 2026 Jul 2026 Next milestones6 2031 Production Acquisition Exemption Completion Environmental Sufficiency Administrative Provincial Permitting of Fission granted by of Engineering Impact statu
Slide 21: Project finance, offtake and government support
Project finance Government Support Proven operational Compelling economics, a strengthened Growing government support for nuclear rsonal use only balance sheet, and established debt as a decarbonisation and energy security experience, relationships underpin broad access to financing options. Potenti
Slide 22: Unlocking the value of PLS
Unlocking the value of PLS, one of the leading low cost, high-grade uranium projects globally rsonal use only Key regulatory, Focus on securing permitting, engineering development permitting and Indigenous and advancing project engagement milestones funding ahead of FID achieved since Fission acquis
Slide 23: Exploration and growth strategy
rsonal use only Exploration and growth strategy
Slide 24: Globally significant uranium resource
Globally significant uranium resource rsonal use only 532Mlb1 of uranium mineral resources providing a strong Paladin asset portfolio growth pathway Attributable Mineral Resources¹ Canadian assets located in a richly endowed mineralisation 127.7Mlb province with extensive opportunity to grow the res
Slide 25: A strategic path to unlocking PLS upside
A strategic path to unlocking PLS upside Potential to support longer life of mine production and higher cash flow, leveraging existing PLS Project infrastructure rsonal use only Resource extension drilling Targeted extension drilling aims to increase resource inventory within the existing Triple R
Slide 26: Uranium Market
rsonal use only Uranium Market
Slide 27: Focus on energy security is accelerating policy support for nuclear power
COP28 pledge to triple World Bank policy now nuclear capacity by 2050 permits support for nuclear endorsed by 38 nations energy, expanding potential rsonal use only financing and advisory pathways for eligible projects Focus on energy security is China hosts the fastest- India plans to grow accelera
Slide 28: Disconnect between uranium requirements and supply
Disconnect between uranium requirements and supply Paladin’s assets are 40 strategically placed 17 3 7 78 to supply uranium CANADA rsonal use only RUSSIA globally 0 KAZAKHSTAN 22 0 LHM provides utilities with diversification vis-a-vis production from Kazakhstan, FRANCE Canada and Uzbekistan 51 PLS i
Slide 29: Structural uranium supply-demand deficit is expected to widen
Structural uranium supply-demand deficit is expected to widen Visible new supply is insufficient to meet growing uranium demand rsonal use only Global uranium supply and demand1 (Mlb) Global utility uncovered uranium requirements2 114Mlb 768Mlb 1,851Mlb 400 New supply required annually 50Mlb 181Mlb
Slide 30: Global nuclear reactor fleet underpins existing demand for uranium
Global nuclear reactor fleet underpins existing demand for uranium Multi-decade reactor rollout drives uranium demand growth rsonal use only Global nuclear reactor rollout is underway1 82 reactors under construction1 336 980 PROPOSED NEW TOTAL REACTORS POTENTIAL IN 27 COUNTRIES REACTORS China 41 Ind
Slide 31: Delivering Sustainable Value
rsonal use only Delivering Sustainable Value
Slide 32: Making an impact in our communities
Making an impact in our communities Paladin is committed to playing a meaningful role in its host communities in Namibia and Canada. We are proud that 99% of our employees are Namibian Nationals. rsonal use only Our focus in Namibia’s Erongo Region has been on supporting healthier, more resilient co
Slide 33: Goal to be a leading independent, upstream-focused uranium producer
Paladin’s goal is to be a leading independent, upstream-focused uranium producer globally rsonal use only Langer Patterson Value Heinrich Lake South creation Mine Project Producing uranium for global Delivering PLS Project for nuclear energy energy security today expansion tomorrow Exploration Drivi
Slide 34: Thank you.
rsonal use only Thank you. INVESTOR RELATIONS MEDIA Paula Raffo Anthony Hasluck T: +61 8 9423 8100 T: +61 438 522 194 E: paula.raffo@paladinenergy.com.au E: anthony.hasluck@paladinenergy.com.au
Slide 35: Appendix
rsonal use only Appendix.
Slide 36: LHM September 2026 Quarter Results
LHM September 2026 Quarter Results1 Q1 Q4 rsonal use only LHM (100%)2 FY2027 FY2026 MINING Waste Mined Mt 5.89 5.57 1. Refer to Paladin’s exchange announcement titled “Quarterly Total Ore Mined3 Mt 1.84 1.87 Report – September 2026” dated 14 October 2026 2. Paladin has a 75% interest in the LHM Tota
Slide 37: LHM Mineral Resources and Ore Reserves
LHM Mineral Resources and Ore Reserves rsonal use only Summary Mineral Resources1 As at 30 June 2026 Mt Grade ppm U3O8 Mlb U3O8 Grade ppm V2O5 Mlb V2O5 Measured In-situ 67.6 449 66.9 145 21.7 ROM stockpiles 0.1 485 0.1 157 0.0 2 LG stockpiles 27.3 314 18.9 102 6.1 Total Measured 95.0 410 85.9 133 27
Slide 38: PLS Project Mineral Resources and Reserves
PLS Project Mineral Resources and Reserves rsonal use only Mineral Resources1 Deposit Mt Grade % U3O8 Mlb U3O8 Grade g/t Au Koz Au Indicated Triple R 2.9 1.88 118.8 0.59 54.4 Inferred Triple R 0.4 1.19 10.9 0.46 6.1 Total 3.3 1.79 129.7 0.57 60.6 Ore Reserves1 Mt Grade % U3O8 Mlb U3O8 Probable R780E
Slide 39: Non-IFRS Measures
Non-IFRS Measures The Non-IFRS Measures used in this Presentation are described below. Average Realised Price rsonal use only Average Realised Price is a Non-IFRS Measure that represents the average revenue received per pound of U3O8 sold during a given period. It is calculated by dividing total rev