Stellar Resources Limited · ASX:SRZ
Stellar Resources — Shareholder Meeting (October 2013)
26 slides from Stellar Resources's shareholder meeting presentation, Oct 16, 2013
Slide 1: Heemskirk Tin Project - Stellar Resources AGM
For personal use only Heemskirk Tin Project - Tasmania CEO: Peter Blight Stellar Resources AGM October 2013 ASX: SRZ www.stellarresources.com.au
Slide 2: Agenda
Agenda For personal use only Company overview Tin market update Achievements on $10 million Targets for PFS Optimisation Relative Valuation 2
Slide 3: Corporate Snapshot
Corporate Snapshot For personal use only ASX Code SRZ (listed April 2005) Shares on Issue 223.4M Share Price 5.4c (12 month range: 4-16c) Market Capitalisation $12M Cash $2.2M (Jun 13) Investments $0.2M Ownership Structure Board & Management Top 20 60.6% Phil Harman Non-Exec Chairman S Bunnenberg 18
Slide 4: Tin consumers need new mines
Tin consumers need new mines For personal use only Alluvial supply less reliable and facing rising costs Concentrate shortage for several years Security of supply a major issue for end-users New supply to come from hard rock mines Hard rock mines provide greater certainty of supply Incen
Slide 5: Tin price rally on Indonesian disruption
Tin price rally on Indonesian disruption LME Tin Price versus Stocks For personal use only 35,000 35,000 Tonnes US$/tonne 30,000 30,000 25,000 25,000 20,000 20,000 Indonesia driving prices higher & 15,000 15,000 stocks lower 10,000 10,000 LME Stocks LME Price 5,000 5,000 0 0 9 /0 10 0 0 1 /0 12 /0 1
Slide 6: Great Location
Great Location For personal use only 100% owned Heemskirk tin project 100% owned St Dizier tin deposit Significant mining district Easy access to water & power Sealed road between both deposits Rail & road connects to Burnie Port 18km from Australia’s largest tin mine - Renison Bell 6
Slide 7: Significant achievements at low cost
Significant achievements at low cost For personal use only Outcomes achieved on $10 million of project spending to date Maximised tin price leverage by moving to 100% ownership. Increased resource by 49% to 71,500t contained tin worth $1.6bn. High grade intersections – best of 7m@4% tin in ZS1
Slide 8: Grade and tonnage rising
Grade and tonnage rising For personal use only Heemskirk: highest grade undeveloped ASX listed tin resource 2.00 1.75 Renison Bell MLX 50% 1.50 Tin Grade % Heemskirk SRZ 100% 1.25 1.00 2011 2013 Achmmach MGT 83.5% KAS 100% 0.75 Mt Lindsay 0.50 Mt Garnet Rentails VMS 100% CSD 100% MLX 50% 0.25 Tarong
Slide 9: High grade intersections – ZS113
High grade intersections – ZS113 For personal use only 9
Slide 10: Competitive mine gate costs
Competitive mine gate costs Mine gate cash cost of US$14,389/t is 42% below industry marginal cost For personal use only Marginal Cost of Production US$25,000/t Heemskirk Cash Cost US$14,389/t 10 Cash cost estimates are used with permission from ITRI
Slide 11: PFS shows economic viability
PFS shows economic viability For personal use only Description Economic Outputs Tin price scenarios -10% Base Case +10% LME tin price US$/t 22,950 25,500 28,050 NPV 8% A$M 11 61 103 IRR % 10 19 26 Payback years 4.7 3.7 3.1 Operating margin A$/t ore treated 51 70 86 Total cash surplus A$M 77 152 215
Slide 12: Optimising PFS to add value
Optimising PFS to add value For personal use only 3 diamond drill holes targeting high grade at Severn 2 diamond drill holes targeting gap between Severn and Montana 3 diamond drill holes to extend high grade Lower Queen Hill 3 diamond drill holes targeting near surface mineralisation at St
Slide 13: Severn/Montana drill targets
Severn/Montana drill targets For personal use only 13
Slide 14: Queen Hill drill targets
Queen Hill drill targets For personal use only 14
Slide 15: St Dizier – outcropping tin target
St Dizier – outcropping tin target 2.5 km of tin mineralised skarn For personal use only 15
Slide 16: Target area: 1km to granite source
Target area: 1km to granite source For personal use only 16
Slide 17: Heemskirk: The Next Renison?
Heemskirk: The Next Renison? For personal use only Deepest drilling at Heemskirk 500m Area 4 Grades >3.0% tin 17
Slide 18: Stellar undervalued relative to peers
Stellar undervalued relative to peers For personal use only 700 Enterprise value per tonne tin resource 600 500 400 300 200 100 0 ANW SRZ CSD VMS KAS MLX 18
Slide 19: Disclaimer
Disclaimer For personal use only Forward Looking Statement This presentation may contain a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Stellar’s control, may cause the actual results, performance and achievements of Stellar to differ materi
Slide 20: Stellar Resources Limited contact details
Stellar Resources Limited Level 17, 530 Collins Street For personal use only Melbourne VIC 3000 Phone +61 3 9618 2540 Fax +61 3 9649 7200 www.stellarresources.com.au 20
Slide 21: APPENDICES – PFS Result
APPENDICES – PFS Result For personal use only 21
Slide 22: Preliminary feasibility completed
Preliminary feasibility completed For personal use only Production scheduling: Mining One Pty Ltd Geotech and mine design: Mining One Pty Ltd Metallurgy: Asther Pty Ltd and ALS AMMTEC Plant engineering and infrastructure: GR Engineering Pty Ltd Environmental: J Miedecke & Partners Pty Ltd
Slide 23: PFS technical and cost summary
PFS technical and cost summary For personal use only Description Units Value Mining inventory Mt 3.95 Mined ore tin grade % tin 1.06 Average Mill Throughput Mtpa 0.6 Initial mine life Years 6.75 Tin recovery % 70 Average concentrate grade % 48 Average tin in concentrate production tpa 4,327 Mine gat
Slide 24: PFS underground mine plan
PFS underground mine plan For personal use only Queen Hill Long Hole Stoping Montana Long Hole Stoping Severn Drift & Fill Severn Long Hole Stoping 24
Slide 25: PFS Pre-production capital expenditure
PFS Pre-production capital expenditure For personal use only Item US$ Million AU$ Million Mine 34.1 37.9 Process facilities including first fills and spares 68.0 75.5 Infrastructure including tailings storage facility 6.4 7.2 Owners costs 1.4 1.5 Contingencies 4.0 4.5 Total project pre-production ca
Slide 26: PFS life of mine cash operating costs
PFS life of mine cash operating costs For personal use only Item US$/t tin in conc AU$/t ore Mining 8,137 65.2 Processing 4,131 33.1 Direct Cash Cost (mining+processing) 12,268 98.3 Mine sustaining 1,735 13.9 Site sustaining 175 1.4 Corporate overheads 212 1.7 Total mine gate operating cost 14,389 1