Hillgrove Resources Limited · ASX:HGO

Hillgrove Resources — Shareholder Meeting (April 2019)

28 slides from Hillgrove Resources's shareholder meeting presentation, Apr 30, 2019

  1. Slide 1: 2019 AGM MD Presentation

    2019 AGM MD PRESENTATION STEVEN MCCLARE IIIII CEO & MD PETER ROLLEY IIIII CHIEF GEOLOGIST 30 APRIL 2019

  2. Slide 2: Disclaimer Statement

    DISCLAIMER STATEMENT No representation or warranty is or will be made by any person (including Hillgrove Resources Limited ACN 004 297 116 (“Hillgrove”, “HGO”, or the “Company”) and its officers, directors, employees, advisers and agents) in relation to the accuracy or completeness of all or part of

  3. Slide 3: Competent Person Statements

    COMPETENT PERSON STATEMENTS Competent Person's Statement The information in this release that relates to the 2016 Mineral Resource Estimate for Giant is based upon information compiled by Mr Peter Rolley, who is a Member of The Australian Institute of Geoscientists. Mr Rolley is a full-time employee

  4. Slide 4: Strategic Objectives Summary

    STRATEGIC OBJECTIVES SUMMARY Strategic objective is to return value to shareholders in the form of fully franked dividends which will be achieved by:  Maximising the value from the existing pit,  Progressively rehabilitate,  Realising future value from our existing assets:  Potential $31 million

  5. Slide 5: Giant Pit Nearing Completion

    GIANT PIT NEARING COMPLETION  Drilling and blasting of the approved cutback will soon be completed.  Haulage will continue on a non continuous period. 5

  6. Slide 6: Processing Will Continue Until Mid 2020

    PROCESSING WILL CONTINUE UNTIL MID 2020  Despite mining winding down there are significant stockpiles accumulating.  With the majority of costs invested Kanmantoo is now cash generative. Ore Stockpiles 6

  7. Slide 7: Mine Closure & Completion Plan

    MINE CLOSURE & COMPLETION PLAN  Progressive rehabilitation program built on extensive consultation.  Rehabilitation plan encapsulates many 1970’s mining legacies.  Seeing the site evolve builds credibility.  The process is continually adapting and evolving e.g. optimal flora and fauna or communi

  8. Slide 8: 2018 Premier's Award Commendation

    2018 PREMIER’S AWARD COMMENDATION 8 8

  9. Slide 9: Kanmantoo PHES

    KANMANTOO PHES Sale process concluded1 with AGL paying $31 million over 18-36 months:  $1 million initial payment,  $4 million (anticipated over six months):  stability of the ground at the proposed vertical shaft  early works agreement between AGL and HGO  baseline contamination study  confir

  10. Slide 10: Exploration Presentation

    EXPLORATION PRESENTATION PETER ROLLEY IIIII CHIEF GEOLOGIST 30 APRIL 2019

  11. Slide 11: Contents

    CONTENTS 1. KANMANTOO UG MINE – Stage 1 2. NUGENT UG PROJECT – Stage 2 3. KANMANTOO SOUTH UG HUB – Stage 3 4. EXPLORATION A pipeline of Cu-Au projects 11

  12. Slide 12: Endowment - Recap

    ENDOWMENT - RECAP HGO has demonstrated the extension of several high grade copper-gold zones beyond the final pit design e.g. 21m @ 2.0% Cu, 0.1g/t Au 7m @ 2.7% Cu, 0.6g/t Au 33m @ 2.1% Cu, 0.2g/t Au 12m @ 2.2% Cu, 7.9g/t Au Resulting in an Exploration Target1 of 5-10Mt @ 1.7-2.2% Cu, 0.4-1.0g/t Au

  13. Slide 13: Stage 1 Target - Kavanagh

    STAGE 1 TARGET - KAVANAGH Kavanagh copper lodes have been the main stay of the open pit operation and drilling has demonstrated that these lodes continue for over 480m vertically and below the final pit design See cross sections through the open pit as examples of the depth continuity of the mineral

  14. Slide 14: Stage 1 Target – Kavanagh UG

    STAGE 1 TARGET – KAVANAGH UG Under the agreement with AGL, HGO may plan to exploit the Kavanagh copper lodes via an UG operation until FID1. Due to the Kavanagh Lodes close proximity to the open pit Haul Road, minimal capital will be required to develop the UG KAVANAGH Development of the UG will NUG

  15. Slide 15: Stage 1 Target – Kavanagh UG Exploration Target

    STAGE 1 TARGET – KAVANAGH UG Exploration Target DH Width Tonnage Grade Grade Grade Range (m) Range (Mt) Range Cu% Range Au g/t Range CuEq% The Exploration Target Coopers 6 - 10 0.1 - 0.3 1.5 - 2.0 0.4 - 0.8 1.8 - 2.5 for Central Kavanagh North Kavanagh 6 - 10 0.1 - 0.7 1.5 - 2.0 0.4 - 0.8 1.8 - 2.5

  16. Slide 16: Stage 2 Target - Nugent UG

    STAGE 2 TARGET - NUGENT UG Nugent Lode is over 300m long, and 2m to 23m wide. It is a quartz vein system with high Cu-Au It is open to depth Confirmation of the continuity and grade of the Nugent Lode to depth will occur via diamond drilling from surface before embarking on any UG development KEY TA

  17. Slide 17: Stage 2 Target – Nugent UG Exploration Target

    STAGE 2 TARGET – NUGENT UG Exploration Target DH Width Tonnage Grade Grade Grade Range (m) Range (Mt) Range Cu% Range Au g/t Range CuEq% Coopers 6 - 10 0.1 - 0.3 1.5 - 2.0 0.4 - 0.8 1.8 - 2.5 The Exploration Target North Kavanagh 6 - 10 0.1 - 0.7 1.5 - 2.0 0.4 - 0.8 1.8 - 2.5 for the Nugent Lode, No

  18. Slide 18: Kanmantoo South – Stage 3 Target for UG Mining Hub

    KANMANTOO SOUTH – STAGE 3 TARGET FOR UG MINING HUB PHES Area Kanmantoo is a copper-gold mine with a large number of structurally controlled Cu-Au ore zones In the area outside of the PHES agreement there are a number of Cu-Au lodes that may be amenable to underground mining. In addition to Nugent th

  19. Slide 19: Kanmantoo South – Stella Target

    KANMANTOO SOUTH – STELLA TARGET In 2019 HGO infilled the 2018 MT survey for which the data is still being processed. Approx 300m north of the 2018 MT section line, Aberfoyle drilled one hole (KAN001) and intersected; A 60m wide zone of chlorite-pyrrhotite-Fe- garnet altered sediments (128-170m downh

  20. Slide 20: Kanmantoo North West – Significant Copper and Gold Endowment

    KANMANTOO NORTH WEST – SIGNIFICANT COPPER AND GOLD ENDOWMENT HGO mapping revealed a large area of high Fe and gossan alteration 4.5kms north-west of the Kanmantoo mine site. This high Fe alteration is coincident with a strong magnetic anomaly evident in the State survey regional magnetics HGO has co

  21. Slide 21: Location

    LOCATION Hillgrove Resources Ltd (ASX:HGO) holds, or has under application, ~6,100 sq. kms of exploration licences in South Australia. The focus is on defining copper-gold mineralisation around the Kanmantoo Process Plant, and To transfer the geology knowledge from Kanmantoo to discover large magmat

  22. Slide 22: Kanappa Cu-Au

    KANAPPA Cu-Au The Kanappa Cu-Au zone is 50kms from Kanmantoo A series of pegmatites and aplites intrude into a sequence of potassic altered schists and carbonates Soil copper zone 4.4kms long Geochem zoning from west to east Cu-Zn => Cu-Bi => Cu-Au => Au Alteration over 1km width from west to east C

  23. Slide 23: Kanappa Drilling

    KANAPPA DRILLING Kanappa drilling of a 400m portion of the soil anomaly intersected over 250m width of magmatic related alteration and veining1  KPDD003 45m @ 0.2% Cu from 45m downhole Peak values include 1m @ 2.7% Cu 1m @ 2.5 g/t Au Drill core is from KPDD002 from 230.5m, showing pyrrhotite & chal

  24. Slide 24: Mt Rhine Cu-Au

    MT RHINE Cu-Au The Mt Rhine copper-gold zone is 10kms from Kanappa Soil copper zone 1.7kms long Peak rock chips of 13% Cu 49.8g/t Au (separate samples) Peak Channel Sampling of 6m @ 15.9g/t Au Much higher gold tenor cf Kanappa KEY TAKEAWAYS  Large scale alteration system 1.7kms long and 500m wide 

  25. Slide 25: South East

    SOUTH EAST Numerous Copper –Molybdenum occurrences recorded Colebatch – outcropping chalcopyrite and molybdenite over 1.6 kms in granite Alamil – drill core with narrow veins and chlorite/epidote zones of chalcopyrite and sulphides in diorite over 267m, from 86m depth Sherlock – drill core with SHR0

  26. Slide 26: Stage 1 – Kavanagh Deeps

    STAGE 1 – KAVANAGH DEEPS  Utilising the Open Pit Haul Road as a quasi-decline in potential UG development  Earliest to production  Dependent on PHES STAGE 2 – NUGENT DEEPS  Significant copper and gold outside of PHES Footprint  Second production centre and springboard to Stage 3 STAGE 3 – KANMA

  27. Slide 27: Option 1 – Joint Venture

    NOT IN ORDER OF PRIORITY NOR PREFERENCE, AND NOT TO BE NECESSARILY AS MUTUALLY EXCLUSIVE OPTION 1 – JOINT VENTURE  Joint venture all or a portion of the assets OPTION 2 – SALE OR PARTIAL SALE  Sale of all or a portion, of the assets in a similar process to the PHES strategy OPTION 3 - IPO  To lis

  28. Slide 28: Conclusion

    CONCLUSION Hillgrove has an exciting albeit different future based around Kanmantoo:  Continued safety as mining of Kanmantoo open pit winds down,  Three million tonne ore stockpile to be processed over the next 12 months.  Industry leading rehabilitation generates community goodwill.  Cash gene