Hillgrove Resources Limited · ASX:HGO

Hillgrove Resources — Kantra Copper — Copper to the World Conference 2026

18 slides from Hillgrove Resources's conference presentation, Sep 2, 2026

  1. Slide 1: Presentation – Copper to the World Conference

    2 September 2026 PRESENTATION – COPPER TO THE WORLD CONFERENCE Kantra Copper Limited (formerly Hillgrove Resources Limited, Kantra or Company) (ASX:KAN) is pleased to enclose a copy of the presentation to be delivered by Kantra’s CEO & Managing Director, Bob Fulker, at the Copper to the World Confer

  2. Slide 2: A Growing Australian Copper Producer

    A Growing Australian Copper Producer For personal use only Copper to the World September 2026 Bob Fulker Chief Executive Officer & Managing Director (Formerly Hillgrove Resources Limited)

  3. Slide 3: Important Notice and Disclaimer

    Important Notice and Disclaimer Disclaimer To the maximum extent permitted by law, neither Kantra nor its related corporations, directors, officers, employees or agents, nor any other person, accepts any liability, including, without limitation, any liability arising from fault or negligence, for an

  4. Slide 4: Growing Copper Producer

    Growing Copper Producer With strong development & exploration pipelines ASX:KAN BOARD & MANAGEMENT For personal use only Share price1 $1.10 Derek Carter Chair Shares on issue1 235.9 M Bob Fulker CEO & Managing Director Market capitalisation $260 M Murray Boyte Non-Exec. Director Debt Nil Roger Higgi

  5. Slide 5: Copper Market Outlook

    Copper Market Outlook Copper demand is projected to rise ~50% by 2040, driven The number of new copper discoveries has fallen primarily by energy transition sharply since the 2000s, while average grades have declined For personal use only Increasing Cash costs reflect grade decline, deeper mining an

  6. Slide 6: Delivering and Growing the Business

    Delivering and Growing the Business Building blocks to value creation For personal use only Mine Life & Throughput Upsides Growth Opportunities Cu Production - tonnes Guidance1: 12,750 – 14,000 ▪ Kanmantoo mine life extension ▪ Utilise latent plant capacity ▪ Focusing on 2+Mtpa pathway ▪ Inorganic g

  7. Slide 7: Kanmantoo Copper Mine (100%)

    Kanmantoo Copper Mine (100%) Latent capacity enables material production and cost reduction upside Resources1 Fully Permitted Operation 22 Mt 160 kt Cu 120 koz Au 700m/mth For personal use only 1.8 Mtpa 2 Active 3rd Mining Front2 Resources Contained Contained UG Run Rate Mining Fronts Development Un

  8. Slide 8: For personal use only

    To be updated Monday North For personal use only Kavanagh Nugent Spitfire Open at depth Kavanagh Open at depth Open at depth 2026 Planned Stopes 2026 Planned Development Existing Development to Aug 2026 Existing Void to Aug 2026 7 Existing Backfill to Aug 2026 Open at depth

  9. Slide 9: Emily Star Development Approved

    Emily Star Development Approved Third mining front under development to provide optionality1 For personal use only ▪ Geological continuity confirmed ▪ No material geotechnical risks identified ▪ $20 - $22 million capital requirement to completion, in addition to the $2.9 million spent to end of June

  10. Slide 10: Near-Mine Prospects

    Near-Mine Prospects 13 Targets within 1 km from the Kanmantoo Processing Facility 1 For personal use only ▪ Spitfire resource extension drilling returned high-grade intersects2, results will be incorporated into the 2026 MROR update scheduled for October ▪ Emily Star mine design includes drill platf

  11. Slide 11: Mutooroo Copper Project

    Mutooroo Copper Project High-grade copper growth option unlocked by Kantra’s infrastructure advantage For personal use only ▪ PFS Phase 1 – Focused on material risk items, namely rail logistics and metallurgical test work – expected to conclude in the December Quarter1 ▪ Rail logistics: o Potentiall

  12. Slide 12: Regional Exploration

    Regional Exploration Building a multi-asset copper growth pipeline For personal use only ▪ Strategic tenement holding at high-potential structural corridors ▪ Clear pipeline logic: Regional targets designed to complement Kanmantoo and extend long-term copper optionality ▪ Data-driven targeting: Inte

  13. Slide 13: Upcoming Milestones

    Upcoming Milestones Building on consistent delivery to unlock future value For personal use only Kanmantoo Operation H1 2026 H2 2026 Ramp up to 1.7-1.8Mtpa Run Rate  Emily Star Stage 1 Drill Platform  Drilling to Inform Stage 2 Decision  Stage 2 Investment Decision  Resources & Reserves Resource

  14. Slide 14: Copper Foundation, Multi-Asset Future

    Copper Foundation, Multi-Asset Future Building the next mid-tier copper company For personal use only Cu Strategy in Tier 1 Jurisdiction Robust Resources & Reserves Cash Generating Operation Latent Installed Capacity for Growth Mutooroo Copper Growth Option Near Mine Exploration Upside Potential 13

  15. Slide 15: Contact

    Contact For personal use only Kantra Copper Limited 5-7 King William Road Unley SA 5041 info@kantra.com www.kantra.com Thank you Bob Fulker CEO & Managing Director +61 (0)8 7070 1698 To receive up-to-date Luke Anderson CFO & Joint Company Secretary company information, +61 (0)8 7070 1698 scan the QR

  16. Slide 16: Appendix - Kanmantoo Mineral Reserve

    Appendix - Kanmantoo Mineral Reserve Tonnes Cu Au CuEq Ag Cu Metal Au Metal Mine Area Classification For personal use only (kt) (%) (ppm) (%) (ppm) (kt) (koz) Proved 1,500 0.96 0.11 1.0 2.8 14 5 Kavanagh Probable 900 0.89 0.19 1.0 2.9 8 5 Sub-Total 2,300 0.93 0.14 1.0 2.8 22 10 Proved 360 0.73 0.37

  17. Slide 17: Appendix - Kanmantoo Mineral Resource

    Appendix - Kanmantoo Mineral Resource Tonnage Cu Au Ag Cu Metal Au Metal JORC Mine Area Notes: Classification (kt) (%) (g/t) (g/t) (kt) (koz) For personal use only 1. Due to effects of rounding, total numbers may not sum. 2. Inferred 1 – includes Kavanagh high grade Inferred; Central Measured 4,200

  18. Slide 18: Appendix - Mutooroo Mineral Resource

    Appendix - Mutooroo Mineral Resource Resource Copper Cobalt Gold Copper Cobalt Gold For personal use only Classification Tonnes Category % % g/t tonnes tonnes ounces Measured Oxide 598,000 0.56 0.04 0.08 Subtotal Oxide 598,000 0.56 0.04 0.08 3,300 200 1,500 Measured Sulphide 4,149,000 1.23 0.14 0.18