  1. Slide 1: Menzies & Laverton Restart Mining Study

    MENZIES & LAVERTON RESTART MINING STUDY SEPTEMBER 2023

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer Important Notices This Presentation has been prepared by Brightstar Resources Limited (Brightstar) and is authorised by the Board of Directors of Brightstar. Disclaimer • This Presentation has been prepared by Brightstar based on information from its own and third party

  3. Slide 3: Cautionary Statement

    Cautionary Statement Cautionary Statement • The Scoping Study referred to in this ASX release has been undertaken to evaluate the potential development of the Menzies Gold Project (“Menzies Project”) and the Laverton Gold Project (“Laverton Project”)(together, the “Projects”) located in the Eastern

  4. Slide 4: Project Overview

    Project Overview +1Moz JORC Resources – Open and growing to deliver scale to become a material and relevant participant in the WA gold sector Tier-1 jurisdiction with compelling land position in two proven goldfields with multi-million ounce endowments: • Significant operations nearby include Granny

  5. Slide 5: Compelling Economics Delivered in a Low-Risk Start-Up

    Compelling Economics Delivered in a Low-Risk Start-Up Total Material Processed LOM Gold Produced Plant Throughput2 5.3Mt @ 2.00g/t Au 322koz over 8 years 480ktpa Mining Physicals Annual Production C1 Cash Cost1 40koz pa A$1,765/oz Pre-tax NPV8% IRR (pre-tax) Gold Price Assumption $103M 79% A$2,900/o

  6. Slide 6: Corporate Overview

    Corporate Overview SHARE PRICE $0.012 1.89bn 0.030 30 Share Price Shares on issue 0.025 25 Share Price (A$/share) 0.020 20 Volume (M) 1 $23m $3.6m 0.015 15 Market Capitalisation Cash 0.010 10 0.005 5 – $20m - 0 Debt Enterprise Value Aug-22 Nov-22 Jan-23 Mar-23 Jun-23 Aug-23 Volume (m) Share Price (A

  7. Slide 7: Production Summary and Overview

    Production Summary and Overview • Two project areas: o Menzies Gold Project (MGP) o Laverton Gold Project (LGP) UG • Four mines: o 1x open pit and 1x underground at MGP o 1x open pit and 1x underground at LGP UG OP • Upfront capital required: A$22 million UG • Payback: 1.5 years UG OP OP OP OP • Cum

  8. Slide 8: Production Summary

    Production Summary Total gold produced of 322koz at an AISC of A$2,041/oz over the life of mine • LOM production underpinned by 66% production of ounces from Measured and Indicated Resource classification • Payback period (first 1.5 years of production) comprised of 70% Mineral Resources in the M&I

  9. Slide 9: Key Study Outcomes

    Key Study Outcomes PROJECT COSTS FINANCIAL METRICS SUMMARY CAPITAL COSTS Gold Price Assumed A$/oz A$2,900 Pre-Production Capital A$m 22 Spot Gold Price 1 A$/oz A$3,000 Sustaining Capital A$m 53 Discount Rate % 8 Growth Capital A$m 94 PROJECT VALUATION @ A$2,900/oz OPERATING COSTS LOM EBITDA A$m 153

  10. Slide 10: Project Sensitivity Analysis

    Project Sensitivity Analysis The combined development displays robust financial metrics under different scenario analysis and various downside scenarios Project NPV (unleveraged and pre-tax) Sensitivity Analysis Scenario Analysis (Gold Price Assumptions) Base case Current spot Gold Price (A$/oz) $2,

  11. Slide 11: Project All-In Sustaining Costs

    Project All-In Sustaining Costs The project displays attractive LOM AISC margins utilising conservative gold price assumption at A$2,900/oz • Application of real mining and processing costs obtained from June 2023 market quotes • Opportunities to reduce AISC through further optimisation of mining an

  12. Slide 12: Mining Phase 1 – Menzies Gold Project

    Mining Phase 1 – Menzies Gold Project Selkirk • Development of 1x large open pit complex and 1x underground mine at the MGP • Lady Shenton System comprised of three open pit mining areas / deposits: Menzies Town o Pericles o Stirling o Lady Shenton cutback • Yunndaga underground utilising existing o

  13. Slide 13: Menzies Gold Project

    Menzies Gold Project Simultaneous development of open pit mining at Lady Shenton system and underground mining at Yunndaga • 3 open pit mining areas at Lady Shenton • Mining Physicals: o Total movement of 10 million BCM o Average strip ratio of 10.8:1 o Ore of 1.9Mt @ 1.63g/t Au for 100koz mined • O

  14. Slide 14: Menzies Gold Project

    Menzies Gold Project • 3.5 years of toll treatment processing • Combined processing physicals: o 2.6Mt of ore o Average head grade of 1.95g/t Au o Recovered gold 153koz Au o Recovery 95% • Robust early mine life production profile: o Year 1: 49koz o Year 2: 63koz o Year 3: 36koz • Wind down of minin

  15. Slide 15: Mining Phase 2 – Laverton Gold Project

    Mining Phase 2 – Laverton Gold Project • Portfolio is spread across multiple project areas: Alpha U/G o Cork Tree Well (6.4Mt @ 1.4g/t Au for 303koz Au) o Alpha (1.4Mt @ 2.3g/t Au for 106koz Au) o Beta (1.9Mt @ 1.7g/t Au for 102koz Au) • Development of four open pits at Cork Tree Well and 1x undergr

  16. Slide 16: Laverton Gold Project

    Laverton Gold Project Staged development of open pit mining at Cork Tree Well and underground mining at Alpha • 4 open pit mining areas at Cork Tree Well: o 2 cut-backs (South 1 & 2), 2 new open pits (Central & Delta) • Mining Physicals: o Total movement of 12 million BCM o Average strip ratio of 11

  17. Slide 17: Laverton Gold Project

    Laverton Gold Project LAVERTON GOLD PROJECT - PRODUCTION • +5 years of owner operator processing 18,000 180,000 • Cork Tree Well open pit and Alpha underground mine 16,000 160,000 • Combined processing physicals: QUARTERLY RECOVERED GOLD (OZ) 14,000 140,000 o 2.7Mt of ore 12,000 120,000 o Average he

  18. Slide 18: Laverton Processing Strategy

    Laverton Processing Strategy • Three options assessed by GR Engineering Services Ltd (GRES): • Plant Restart (current configuration) • Upgrade & Refurbish for 480ktpa (fresh rock throughput) • Plant Relocation to Menzies • Optimal outcome is Upgrade & Refurbish case with total Capital Cost $18.5 mil

  19. Slide 19: Attractive Low Capital Development vs Peers

    Attractive Low Capital Development vs Peers Scoping Study outputs indicate a readily fundable project with a compelling return on capital investment • Best NPV/Capex ratio of all undeveloped gold opportunities on the ASX (LHS) • Lowest Capital Intensity of undeveloped gold opportunities on the ASX (

  20. Slide 20: Upside and Opportunities for PFS

    Upside and Opportunities for PFS MENZIES LAVERTON Yunndaga Upside Infill drilling to convert Infill drilling to convert Inferred Resources to Inferred Resources to Indicated classification Indicated classification Targeted drilling on the edges / adjacent to Extensional drilling at optimised pit she

  21. Slide 21: Key Catalysts and Value Drivers

    Key Catalysts and Value Drivers Year CY2023 CY2024 CY2025 Quarter Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 DRILLING Resource Definition - Menzies & Laverton Diamond Drilling (Met, Geotech, Extensional) Ongoing RC Resource Definition Programs Targeted Resource Updates - Menzies & Laverton Exploration Greenfield

  22. Slide 22: Recent M&A Increase in WA Pre-development Gold Space

    Recent M&A Increase in WA Pre-development Gold Space $950/oz M&A activity for ASX-listed WA pre-production gold assets Enterprise Value per Ounce (A$/oz) (M,I&I)1 $226/oz 226 $217/oz 217 $176/oz 176 M&A Average EV/oz of $108/oz* $66/oz 66 Brightstar EV/oz: A$19/oz $56/oz 56 $48/oz 48 $39/oz 39 $33/o

  23. Slide 23: Peer Comparison

    Peer Comparison Combination of attractively priced ounces that belies the inherent value of Brightstar’s assets $200 $339M $217M 90% $180 80% Enterprise Value (A$ per Resource Ounce) $160 70% Measured & Indicated % $140 60% $120 50% $100 40% $80 EV/Resource oz Average $48/oz 30% $60 20% $40 $20 10%

  24. Slide 24: Summary

    Summary +30% conversion of Resource ounces to De-risked staged mine plan: Laverton processing plant unlocks Mine Plan delivering 322koz recovered 2 project areas with 1x open pit and inorganic opportunities in the Laverton from 1.02Moz JORC Resource base 1x underground mine in each project district

  25. Slide 25: Project Overview

    PROJECT OVERVIEW

  26. Slide 26: Laverton Gold Project Overview

    Laverton Gold Project Overview Base load resources with material exploration upside and a processing solution Approximately 300km2 of 100%-owned tenure in the Laverton Tectonic Zone which is renowned for its significant mines currently being mined to >1,500m depth (Sunrise Dam and Granny Smith) Port

  27. Slide 27: Cork Tree Well – Scale & Upside

    Cork Tree Well – Scale & Upside Open pit +303koz JORC Resource Open Along Strike and at Depth JORC Mineral Resource upgrade to 6.4Mt @ 1.4g/t Au for 303koz o Including 157koz @ 1.6g/t Au in Indicated classification OPEN OPEN Recent drilling focused on Resource growth and conversion of Inferred to In

  28. Slide 28: Menzies Gold Project Overview

    Menzies Gold Project Overview Contiguous land package in prolific historic mining field Consists of a tenement holding of a contiguous land package of granted mining leases over a strike length of +17km Majority of deposits are hosted along the Menzies Shear Zone and located adjacent to Goldfields H

  29. Slide 29: Exploration Upside – Menzies Gold Project

    Exploration Upside – Menzies Gold Project Limited and ineffective historical exploration provides high-grade opportunities at Menzies Despite a long and successful mining history, exploration drilling at Menzies was historically focused on: • Near mine exploration in and around the active mining cen

  30. Slide 30: Appendices

    APPENDICES

  31. Slide 31: Board & Management

    Board & Management ALEX DEAN GREG JONATHAN JOSH TONY ROVIRA VALLVE BITTAR DOWNES HUNT LAU MANAGING DIRECTOR COO NON-EXEC CHAIRMAN NON-EXEC DIRECTOR NON-EXEC DIRECTOR NON-EXEC DIRECTOR Mr Rovira is a qualified Mr Vallve holds technical Mr Bittar holds a Master of Mr Downes has over 25 Mr Hunt is an M

  32. Slide 32: Consolidated JORC 2012 Resources

    Appendix 1 Consolidated JORC 2012 Resources Location Measured Indicated Inferred Total Au Cut-off (g/t) Kt g/t Au Koz Kt g/t Au Koz Kt g/t Au Koz Kt g/t Au Koz Alpha 0.5 623 1.6 33 374 2.1 25 455 3.3 48 1,452 2.3 106 Beta 0.5 345 1.7 19 576 1.6 29 961 1.7 54 1,882 1.7 102 Cork Tree Well 0.5 - - - 3,

  33. Slide 33: Pre-production WA Gold M&A Peer Comparison Information & References

    Appendix 2 Pre-production WA Gold M&A Peer Comparison Information & References TOTAL Deal Value EV/oz MEASURED INDICATED INFERRED GRADE Acquirer Target Stage Date RESOURCE Source ($Am) ($AUD/oz) (Koz) (Koz) (Koz) (g/t) (Koz) Northern Star Strickland Minerals Sale of Millrose Project Resource Develop

  34. Slide 34: Peer Comparison Information & References

    Appendix 3 Peer Comparison Information & References Source: IRESS, Company Announcements . Pricing as at 04/09/23. Cash balance as reported in June 2023 Quarterly Report CODE COMPANY STAGE MARKET CAP (A$M) CASH (A$M) EV (A$M) SHARE PRICE MEASURED (Koz) INDICATED (Koz) INFERRED (Koz) TOTAL RESOURCE (

  35. Slide 35: WA Gold M&A Peer Comparison for Mining Studies

    Appendix 4 WA Gold M&A Peer Comparison Information & References for Mining Studies Pre-tax Net Capital Source Production Pre-Production NPV Discount Payback NPV/Capex Gold Price Code Company Study Stage Project LOM (Yr) Present Value Intensity (ASX Date Profile (ozpa) Capex (A$m) Rate Used (%) Perio

  36. Slide 36: Alex Rovira

    ALEX ROVIRA Managing Director alex@brightstarresources.com.au brightstarresources.com.au