Korab Resources Limited · ASX:KOR

Korab Resources — Investor Presentation (May 2013)

18 slides from Korab Resources's investor presentation, May 7, 2013

  1. Slide 1: Korab Resources Limited – Gold Operations Update May 2013

    Korab Resources Limited Gold Operations Update – May 2013 Andrej K. Karpinski Executive Chairman ASX: KOR

  2. Slide 2: Korab Capital Structure and Board

    KORAB Korab Capital Structure and Board RESOURCES LIMITED Korab Historical Share Price Chart vs. Gold Index ASX : KOR Shares on issue: 135 million Options on issue (25 cents exercise price): 44 million Last price: $0.07 Market Cap: $9 million Top 20 shareholding: 57% Directors shareholding: 20% Boar

  3. Slide 3: Robust Undervalued Gold Portfolio

    KORAB Robust Undervalued Gold Portfolio RESOURCES LIMITED Gold inventory of 2.38 million ounces of gold in JORC resource* Bobrikovo gold and silver project in Ukraine Mineral resource of 2 million ounces Au* Exploration target of between 7 million ounces and 13.9 million ounces Au** based on 55 mill

  4. Slide 4: Korab Projects

    KORAB Korab Projects RESOURCES LIMITED BOBRIKOVO MELROSE Korab Gold Projects Other Korab Projects 3 ASX: KOR

  5. Slide 5: About the Bobrikovo Project

    KORAB About the Bobrikovo Project RESOURCES LIMITED Project is located within a large intra- continental structure hosting several world-class gold mining operations including Muruntau, Vysokovoltnoe, and Bakirchic BOBRIKOVO Tenor and style of mineralisation at Bobrikovo is similar to 170 million oz

  6. Slide 6: Bobrikovo Project Description

    KORAB Bobrikovo Project Description RESOURCES LIMITED Resource increased to 2 million ounces of gold over 2 years Over $5 million spent to date by Korab Group on the project exploration, evaluation and development Over $16 million spent on the project by previous owners (resource definition and expl

  7. Slide 7: Bobrikovo Resource Base

    KORAB Bobrikovo Resource Base RESOURCES LIMITED Current gold resource at Bobrikovo Resource by category • 2.04moz Au in 37 Mt @ 1.7 g/t Au (0.5g/t cut-off) At 0.5 g/t Au cut-off ORE_MASS AU_CONTENT AU_MASS Bobrikovo gold resource includes high grade component [1000t] [g/t] [Mln oz.] Measured 1,660.3

  8. Slide 8: Resource Model at 0.5 g/t Au cut

    KORAB Resource Model at 0.5 g/t Au cut RESOURCES LIMITED Current JORC resource is only constrained by depth and density of drilling Majority of drill-holes ended in mineralisation Drilling program to test for extensions at depth and along strike expected to be completed in second half of 2013 *** **

  9. Slide 9: Selected Significant Intercepts

    Selected Significant Intercepts KORAB Greater than 15m in width and greater than 2g/t Au RESOURCES LIMITED 45.5 m at 6.15 g/t Au and 27.9 g/t Ag from 1.5 m to 47 m 55.6 m at 2.25g/t Au and 17.2g/t Ag from 13.5 m to 69.10 m 19.3 m at 5.79 g/t Au and 18.7 g/t Ag from 2 m to 21.6 m 15.6 m at 4.81 g/t A

  10. Slide 10: Selected Significant Intercepts

    Selected Significant Intercepts KORAB Greater than 10m in width RESOURCES LIMITED Hole_ID From To Interval Au Average Ag Average including Interval Au Average Ag Average 685 9.00 23.00 14.00 2.39 80.66 Including 2.00 4.90 216.00 687 11.00 30.00 21.50 4.76 56.15 Including 2.20 20.85 108.82 692 33.00

  11. Slide 11: Bobrikovo Mineralisation Style

    KORAB Bobrikovo Mineralisation Style RESOURCES LIMITED 2million oz. Au mineral resource where mineralisation is associated with extreme fracturing of the sandstone and A metasomatic leaching causing a halo effect around the higher grade main veins. 7-13.9 million oz. Au exploration target sits withi

  12. Slide 12: Gold Production Key Points

    KORAB Gold Production Key Points RESOURCES LIMITED Stage 1 gravity plant CAPEX estimated at $700,000 (equivalent to 470 oz. Au) Stage 1 gravity plant to use 330,000 tonnes of a blend of high and low grade rock mined and stockpiled on site by Korab which will be blended to an average grade of 3.04 g/

  13. Slide 13: In-country Management

    KORAB In-country Management RESOURCES LIMITED Korab has a strong technical team based in the Ukraine responsible for the existing mining operations Senior Management Mr A. Najmitdinov Ex – Severstal Gold, Oxus Gold, and Newmont Gold, MBA from University of Denver, 10 years senior Country Manager man

  14. Slide 14: Melrose Resource Base

    KORAB Melrose Resource Base RESOURCES LIMITED Current gold resource at Melrose stands at 6.6 million tonnes @ 1.61 g/t for 340,000 oz. Au (0.5g/t cut-off) Measured and indicated resource totals 3.3 Mt @ 1.7 g/t Au for 185,000 oz. Au Melrose deposits remain open at depth and along strike with strong

  15. Slide 15: Summary

    KORAB Summary RESOURCES LIMITED Gold inventory of ~2.38 million ounces of gold in JORC resource* plus substantial exploration potential (see page 2 for exploration target) Potential to become gold producer at exceptionally low capital cost ($700,000) and very low processing costs ($295/oz. Au) Fully

  16. Slide 16: Peer Comparison

    KORAB Peer Comparison RESOURCES LIMITED Korab Resources 4 15 ASX: KOR

  17. Slide 17: Appendix A

    KORAB Appendix A RESOURCES LIMITED Bobrikovo Gold Resource at 0.5 g/t Au Bobrikovo Gold Resource at 2 g/t Au Category Tonnes ‘000 Grade g/t Au Gold Ounces Category Tonnes ‘000 Grade g/t Au Gold Ounces Measured 1,660 2.05 0.11 Measured 471 4.72 0.07 Indicated 7,274 2.79 0.65 Indicated 3,223 4.56 0.47

  18. Slide 18: Important Information

    KORAB Important Information RESOURCES LIMITED This presentation has been prepared by Korab Resources Limited (“Korab” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation

Korab Resources — Investor Presentation (May 2013) on 6ix