  1. Slide 1: Building North America's Low-Cost Multi-Asset Copper Producer

    BUILDING NORTH AMERICA’S LOW-COST MULTI-ASSET COPPER PRODUCER June 2023

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains forward-looking statements and forward-looking information (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legislation and the United States Private Securities Legislation Reform Act of 1995, Sectio

  3. Slide 3: Taseko – Investment Highlights

    Taseko – Investment Highlights Building a Multi-Asset, North American Copper Producer C A N A D A B R I T I S H C O L U M B I A GIBRALTAR Strong Copper ALEY Commitment to Strong Fundamentals YELLOWHEAD Environmental, Social & Proven Team of Mine NEW PROSPERITY Governance Performance Builders & Opera

  4. Slide 4: Capital Structure & Coverage

    Capital Structure & Coverage Share Price C$1.85 Analyst Coverage Target Price & Recommendation 52 Week High / Low C$2.53 / US$1.15 Buy C$2.75 (+50%) May ’23 Listed TSX:TKO / NYSE:TGB / LSE:TKO Buy C$3.70 (+100%) May ’23 Buy C$2.50 (+35%) May ’23 Shares Outstanding* 288M Buy C$3.00 (+60%) Apr ’23 Mar

  5. Slide 5: Copper Price Outlook

    Copper Price Outlook 2022 copper price volatility driven by: Concerns about global economy Chinese economic data / Covid lockdowns Favourable long-term supply-demand dynamics: Rising interest rates US$ strength Maturing global supply base and lack of project pipeline, with projects having long Coppe

  6. Slide 6: Copper Price Outlook

    Copper Price Outlook Highlights from S&P Global Copper Study (July 2022) Copper – the “metal of electrification” – is essential to all energy transition plans Copper market would need to grow from 25 million metric tonnes (MMt) today to ~50 MMt by 2035 to achieve ‘net- zero’ by 2050, a record-high l

  7. Slide 7: Electric Vehicles – A Rapidly Emerging Market

    Electric Vehicles – A Rapidly Emerging Market Copper is Essential to Electric Vehicle Technology Copper is used throughout electric vehicles, charging stations 18 to 49 lbs and supporting infrastructure because of the metal’s Conventional Car 85 lbs durability, high conductivity and efficiency Hybri

  8. Slide 8: Gibraltar Copper Mine – British Columbia

    Gibraltar Copper Mine – British Columbia A FOUNDATION OF STABLE CASHFLOW MINE TYPE STAGE PRODUCTION (LoM) Open Pit – Cu/Mo Producing 130Mlbs (~60kt Cu) CASH COSTS (LOM) MINE LIFE REPLACEMENT VALUE US$2.10/lb 22 Years +US$1 billion1 1. Calculated using US$15,000 / ton capacity multiplied by capacity

  9. Slide 9: Gibraltar Copper Mine – Large-Scale, Steady-State Mine

    Gibraltar Copper Mine – Large-Scale, Steady-State Mine Value Creation Acquired Gibraltar in 1999 for $1 Restarted the mine in 2004 Between 2006 and 2013, invested C$800 million to expand and modernize the mine to 85,000 tons per day In 2010, sold 25% of the mine for C$187 million to a Japanese conso

  10. Slide 10: Gibraltar Mine – Cash Flow Growth from Stable Mining Operation

    Gibraltar Mine – Cash Flow Growth from Stable Mining Operation Leverage to copper has resulted in strong earnings growth and cash flow generation Gibraltar is a foundation of stable cash flow for the Company Gibraltar Quarterly Production throughout the copper price cycle 40 (100% basis) Taseko has

  11. Slide 11: Florence Copper Project - Arizona

    Florence Copper Project - Arizona PATHWAY TO A LOW-COST FUTURE MINE TYPE STAGE PROCESSING In-situ Leach Development SX/EW PRODUCTION CAPACITY ESTIMATED OPERATING (per year) COSTS (C1) MINE LIFE 85Mlb (~40kt) Cu US$1.11/lb LOM 22 Years 11

  12. Slide 12: Florence Copper Project – A Near Term, Low Cost Copper Project

    Florence Copper Project – A Near Term, Low Cost Copper Project Project Highlights Over US$135 million was spent on the project by former owners (Conoco, Magma Copper, BHP Copper) Taseko has invested a further $165M since 2014, including US$25M to build the PTF All major power, transportation, road a

  13. Slide 13: In-Situ Copper Recovery (ISCR)

    In-Situ Copper Recovery (“ISCR”) How does in-situ copper recovery work? Benefits of ISCR OTHER BENEFITS: Low cost 24 April 2019 Small environmental footprint (less than a square mile) First Numerous site redevelopment opportunities (post closure) Cathode Limited land disturbance Harvest Low dust emi

  14. Slide 14: Florence Copper Project – A Defined Path to Production

    Florence Copper Project – A Defined Path to Production Two Phase Development Approach Phase 1: Production Test Facility PTF development and construction starts (~US$25M) The PTF consisted of a wellfield and SX/EW plant Wellfield & SX/EW plant commissioned in Q3, 2018  24 wells: 4 injection wells, 9

  15. Slide 15: Florence Copper Project – Financing

    Florence Copper Project – Financing Strategic Partnership with Mitsui & Co. (U.S.A.) Inc. Florence Financing Plan • Provides US$50 million of construction financing • Extensive permitting and technical due diligence process by Mitsui is a third- party endorsement of the Florence Copper project Mitsu

  16. Slide 16: Florence Copper Project – Procurement

    Florence Copper Project – Procurement SX Modules, EW Cell Covers, Electrolyte Filters HDPE Piping 16

  17. Slide 17: Florence Copper Project – Construction Schedule

    Florence Copper Project – Construction Schedule Schedule of Key Components of Construction Simplified construction schedule following issuance of final UIC permit Detailed engineering complete ~US$80 million of long-lead items already invested Board Approval Preproduction Well Development SX/EW Cons

  18. Slide 18: Looking to the Future

    TASEKO MINES LOOKING TO THE FUTURE 18

  19. Slide 19: Yellowhead Copper Project

    Yellowhead Copper Project Project Highlights Advanced stage project acquired by Taseko in 2019 for ~C$13 million in Taseko shares Located in close proximity to power, rail and highway In January 2020, Taseko announced improved economics and new 817M tonne Reserve estimate Technical Study Highlights

  20. Slide 20: New Prosperity Gold-Copper Project

    New Prosperity Gold-Copper Project Project Highlights One of the Largest Copper-Gold porphyries in the world Life of mine average annual production of ~540,000 gold equivalent oz Provincial Authorization (Environment Assessment Certificate) in place 5-year production profile Gold (ounces) Copper (M

  21. Slide 21: Taseko Copper Reserves

    Taseko Copper Reserves Significant Value in P&P Copper Reserves Nearly 15 billion pounds of copper in reserves Including gold in reserves, over 19 billion pounds of copper equivalent 15 30 New Prosperity (Lbs / Market Capitalization) 10 20 (Billions lbs Copper) Yellowhead 5 10 Florence Gibraltar 0 0

  22. Slide 22: Why Invest in Taseko – The Valuation Case

    Why Invest in Taseko – The Valuation Case $3,000 Taseko Valuation Waterfall Significant gap between asset NPV and market cap $1,200 $2,500  Based NAV for Gibraltar (at US$3.50 cu) and $2,020 Florence (US$3.75 cu) $2,000 $480  Not including Yellowhead, New Prosperity or Aley $1,500 $1,300 >C$1.5 bi

  23. Slide 23: Appendix

    Taseko) APPENDIX 23

  24. Slide 24: Credit Profile

    Credit Profile Substantial improvement in leverage metrics on the back of higher copper prices, Gibraltar mine plan optimization and enhanced liquidity Taseko maintains reasonable leverage levels and LTM Adjusted EBITDA balances capital needs through a combination of debt, equity and internally gene

  25. Slide 25: Proactively Reducing Impact of Cu Price Volatility

    Proactively Reducing Impact of Cu Price Volatility Hedging policy in place to reduce the short term Historical Copper Hedging impact of a decline in the price of copper and Cu Production (Mlbs) Defensive Hedging Strategy Taseko’s hedging strategy is designed to secure a minimum price for a significa

  26. Slide 26: 2022 ESG Highlights: 360° of Value

    2022 ESG Highlights: 360° of Value Environment FLORENCE COPPER PROJECT TREES PLANTED SHRUBS PLANTED GRASS SEEDED WILL BE THE LOWEST CO2 AND ENERGY INTENSITY COPPER 17,930 51,090 34 Hectares PRODUCER IN NORTH AMERICA GIBRALTAR MINE 2022 BIOLOGICAL WATER INITIATED PERMITTING PROCESS eDNA WILDLIFE STUD

  27. Slide 27: A Proven Team of Mine Builders and Value Creators

    A Proven Team of Mine Builders and Value Creators Senior Management Board of Directors RON THIESSEN – CHAIRMAN PETER MITCHELL • President, CEO and Director of • Chartered Professional Accountant with over 35 Northern Dynasty Minerals. years of senior financial management experience. • Chartered Prof

  28. Slide 28: Aley Niobium Project

    Aley Niobium Project Project Highlights The world's largest niobium deposit, outside the two operating mines in Brazil (site covers ~433 km2) “Green" rare metal – metals like niobium, are the heart of green technology, such as wind turbines and electric vehicles Taseko acquired the project in 2007 f

  29. Slide 29: Jurisdiction Exposure – 2019 Fraser Institute

    Jurisdiction Exposure – 2019 Fraser Institute Taseko’s exposure sits on the 1st quartile of the Fraser Institute’s Investment Attractiveness Index The Investment Attractiveness Index is a composite index that combines the Policy Perception Index and the Best Practices Mineral Potential Index, weight

  30. Slide 30: Appendix – Reserves & Resources

    Appendix – Reserves & Resources Gibraltar Florence Copper Contained Contained Tons Grade Tons Grade Metal Metal Category Category (millions) (millions) Cu (%) Mo (%) Cu (B lbs) Cu (%) Cu (B lbs) Sulphide Mineral Reserves Effective December 31, 2022 at a 0.15% Cu cut-off Mineral Reserves Effective De

  31. Slide 31: Appendix – Reserves & Resources

    Appendix – Reserves & Resources Yellowhead Aley Contained Contained Tonnes Grade Grade Copper Tonnes Metal Category Category (millions) (millions) Cu (%) Au (g/t) Ag (g/t) (B lbs) Nb205 (%) Nb (M kg) Mineral Reserves Effective December 31, 2019 at a 0.17% Cu cut-off Mineral Reserves Effective Septem

  32. Slide 32: Appendix – Reserves & Resources

    Appendix – Reserves & Resources New Prosperity Grade Contained Metal Tonnes Category (millions) Au Cu Au (g/t) Cu (%) (M oz) (B lb) Mineral Reserves Effective November 2, 2009 at a C$5.50 NSR/t cut-off Proven 481 0.46 0.26 7.1 2.8 Probable 350 0.35 0.18 3.9 1.4 Total P&P Reserves 831 0.41 0.23 11.0

  33. Slide 33: Appendix – NI 43-101 Compliance

    Appendix – NI 43-101 Compliance Unless stated otherwise, Taseko Mines Limited (the “Company”) has prepared the technical information in this presentation including Mineral Reserve and Mineral Resource estimates (“Technical Information”) based on information contained in the technical reports, news r