Barrick Mining Corporation · TSX:ABX

Barrick Mining — Barrick Gold — Denver Gold Show Bulyanhulu Luncheon Presentation (October 2000)

40 slides from Barrick Mining's conference presentation, Oct 4, 2000

  1. Slide 1: lame

    lame Ce Te - ey Laie “ Fidel afl

  2. Slide 2: District development: Tanzania – Lake Victoria Greenstone Belt

    district development Tanzania – Lake Victoria Greenstone Belt

  3. Slide 3: District development: Tanzania – Lake Victoria Greenstone Belt

    district development Tanzania – Lake Victoria Greenstone Belt Barrick Properties Bulyanhulu Barrick Properties

  4. Slide 4: District development: Tanzania – Lake Victoria Greenstone Belt

    district development Tanzania – Lake Victoria Greenstone Belt Pangea properties Barrick properties Bulyanhulu Pangea properties Pangea properties Barrick properties

  5. Slide 5: Regional geology

    regional geology Tanzania – Lake Victoria Greenstone Belt GEITA BULYANHULU 10.5 Moz reserve Barrick Gold Corporation GOLDEN PRIDE

  6. Slide 6: District development: Tanzania – Lake Victoria Greenstone Belt

    district development Tanzania – Lake Victoria Greenstone Belt Musoma Geita Bulyanhulu Tulawaka Golden Pride Sekenke

  7. Slide 7: Bulyanhulu district development

    Bulyanhulu district development • 21 licenses • 2,000 sq. km. Bulyanhulu Golden Ridge

  8. Slide 8: Sekenke district development

    Sekenke district development • 26 licenses • 2,400 sq. km. Sekenke

  9. Slide 9: Geita district development

    Geita district development • 18 licenses • 1,200 sq. km. Geita Mine Bulyanhulu

  10. Slide 10: Tulawaka district development

    Tulawaka district development • 14 licences • 1,000 sq. km. Tulawaka Bulyanhulu

  11. Slide 11: District development: Tanzania – Lake Victoria Greenstone Belt

    district development Tanzania – Lake Victoria Greenstone Belt Musoma Geita Bulyanhulu Tulawaka Golden Pride Sekenke

  12. Slide 12: Tulawaka district development

    Tulawaka district development • 200 km. to Bulyanhulu • 1 million oz. resource • grade of Tulawaka 19 g/t Bulyanhulu

  13. Slide 13: Tulawaka longitudinal section – east zone

    Tulawaka longitudinal section – east zone L 1+00 W L 6+00 W L 5+00 W L 4+00 W L 3+00 W L 2+00 W L 1+00 E L 4+00 E L 2+00 E L 3+00 E L 0+00 1200m El. www www Surface TRC 499 TRC 500 TRC 471 TRC 501 TRC 466 TRC 469 TRC 441 TRC 491 1150m El. TRC 467 TRC 505 TRC 470 TRC 487 TRC 510 TRC 503 TRC 488 TRC 5

  14. Slide 14: Tulawaka longitudinal section – east zone

    Tulawaka longitudinal section – east zone L 1+00 W L 6+00 W L 5+00 W L 4+00 W L 3+00 W L 2+00 W L 1+00 E L 4+00 E L 2+00 E L 3+00 E L 0+00 1200m El. www www Surface TRC 499 TRC 500 TRC 471 TRC 501 TRC 466 TRC 469 TRC 441 TRC 491 1150m El. TRC 467 TRC 505 TRC 470 TRC 487 TRC 510 TRC 503 TRC 488 TRC 5

  15. Slide 15: Tulawaka section – 0+62.5W

    Tulawaka section – 0+62.5W gold zone C 53 bore hole 1 4 1 8 0 19 2 25 34 34 TR 2 10 25 25 intersection C D C C Talus zone C TR C C TR TD TR TR TR TR surface assay = g/t Au / laterite m upper saprolite 6.48/5m 1150m 1.57/1m lower saprolite 4.90/8m VEIN B VEIN 153.97/2.69m A bedrock 8.36/4.22m 1100m 2

  16. Slide 16: Bulyanhulu district development

    Bulyanhulu district development • 21 licenses • 2,000 sq. km. Itetemia Bulyanhulu Buly South

  17. Slide 17: Surface geology

    surface geology significant RAB results RAB results drilled with core significant RAB results over reef 1

  18. Slide 18: Development reserves: 3.7 million oz., December 1998

    development reserves: 3.7 million oz. december 31, 1998 1 km. 1 km.

  19. Slide 19: Development reserves: 7.5 million oz., December 1999

    development reserves: 7.5 million oz. december 31, 1999 reserves & resources: >10.4 million oz. 1.2 km. 2 km.

  20. Slide 20: Development reserves: 10.5 million oz., August 2000

    development reserves: 10.5 million oz. august 31, 2000 reserves & resources: >12.0 million oz. 4 km. 2 km.

  21. Slide 21: September, 2000 drills working – definition, exploration

    september, 2000 20 drills working – 18 definition, 2 exploration 2 km. KMC-707 KMC–590D KMC–640D KMC–699 KMC-689 KMC-727A 1.44 m Hthk in progress2.56 m Hthk results 2.42 m Hthk results @ 5.18g/t @ 25.11g/t pending @ 25.85g/t pending KMC–693A KMC-615B KMC-700E 3.78 m Hthk 2.63 m Hthk 2.48 m Hthk @ 6.

  22. Slide 22: September, 2000 drills working – definition, exploration

    september, 2000 20 drills working – 18 definition, 2 exploration 2 km. 7 km. KMC-707 KMC–590D KMC–699 KMC-689 KMC-727A 1.44 m Hthk in progress results 2.42 m Hthk results @ 5.18g/t pending @ 25.85g/t pending KMC-700E 2.48 m Hthk @ 19.42g/t KMC–640D KMC–693A KMC-615B 2.56 m Hthk 3.78 m Hthk 2.63 m Ht

  23. Slide 23: Phase I development update: general overview

    phase I development update general overview • april 2001 startup • on budget

  24. Slide 24: Phase I development update: infrastructure

    phase I development update infrastructure • 138 km powerline completed • water pipeline commissioned

  25. Slide 25: Phase I development update: process facilities

    phase I development update process facilities • construction of plant and infrastructure 67% complete • all major equipment is on site • mill startup 2001

  26. Slide 26: Phase I development update: potential for expansion

    phase I development update potential for expansion • 4,000 tonnes per day • 6,000 tonnes per day

  27. Slide 27: Phase I development update: shaft sinking

    phase I development update shaft sinking • production shaft at 320 meters • first station excavated • shaft in production in 2Q, 2001 • three ventilation shafts completed

  28. Slide 28: Phase I development update: underground development

    phase I development update underground development • 9,300 meters completed – 25% over feasibility • 3 Tanzanian development crews

  29. Slide 29: Phase I development update: underground development

    phase I development update underground development • grades consistent – thickness 10% greater • 121,000 tonnes @ 16g/tonne stockpiled

  30. Slide 30: Phase I development update: training / staffing

    phase I development update training / staffing • 50 Tanzanian development operators trained • 60 Tanzanians in training for process and maintenance • expatriate recruitment nearly complete

  31. Slide 31: Phase I development update: community and environment

    phase I development update community and environment • employee housing • World Bank environmental standards

  32. Slide 32: Phase I and Phase II, main and east

    MAIN EAST phase I phase II 4 km. 2 km.

  33. Slide 33: Phase II: east zone

    phase II east zone • 12/13 grams per tonne • 500-1000 tpd mining rate • adds 100,000 oz. to production • decline to begin early 2001 • 12 months to access ore

  34. Slide 34: Phase II: east zone 2002 program

    phase II east zone • 2002 program • delineate current reserve • carry out further exploration • begin development • 2003 production • $40 million capital expenditure

  35. Slide 35: Phase III west and Phase IV

    MAIN EAST phase I phase II WEST phase III 4 km. 2 km. phase IV

  36. Slide 36: Phase III and Phase IV

    phase III west zone • surface drilling to date • greater widths / higher grades • requires main shaft to access zone by drift phase IV deep main zone • great holes at depth • develop later in decade

  37. Slide 37: Property summary

    property summary present • total cash costs: $130 per /oz • total production costs: under $200 per /oz potential • increase reserves • reduce costs

  38. Slide 38: lame

    lame Ce Te - ey Laie “ Fidel afl

  39. Slide 39: Slide 39

  40. Slide 40: Slide 40

Barrick Gold — Denver Gold Show Bulyanhulu Luncheon Presentation (October 2000) on 6ix