H3 Energy Limited · ASX:H3E
H3 Energy — 2019 Good Oil Conference
11 slides from H3 Energy's conference presentation, Sep 11, 2019
Slide 1: Whitebark Investor Presentation: Rex-2 Continues to Outperform
Whitebark Investor Presentation Rex-2 Continues to Outperform 11 September 2019 Updated Rex-2 Flow rate continues to exceed initial expectations Whitebark Energy (ASX : WBE) is pleased to provide an updated investor presentation for the 2019 Good Oil Conference. The attached presentation includes an
Slide 2: Growth through disciplined execution
Growth through disciplined execution Good Oil September 2019 Slide 1
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS 1 Successful execution of Wizard Lake Drilling Program Rex-1 Discovery Dec 2018 – facilities and pipeline June 2019 Rex-2 stellar result of over 800 boe/d >50% oil (gross) in September 2019 Now targeting >1,500 boe/d production (>70% oil) from Wizard Lake CY2020 Rex-3 t
Slide 4: Corporate Overview
CORPORATE OVERVIEW ABOUT WHITEBARK ENERGY SHARE PRICE PERFORMANCE Whitebark is an ASX listed Company, focused on 70 1.2 the development of Canadian oil and gas assets Growing current net production 500 boe/d to a 60 1 targeted 1,500+ boe/d in CY2020 Current economic climate presenting signific
Slide 5: Developing a Track Record of Successful Execution
DEVELOPING A TRACK RECORD OF SUCCESSFUL EXECUTION Exploration Drilled two horizontal wells at Wizard Lake during FY 2018/19* On budget and on schedule Rex-1 December 2018, Rex-2 August 2019, Rex-3 planning underway, targeting spud before end of CY2019 Development Installed cost effective mod
Slide 6: Rex-2 – Peak Rate of 865 boe/d
REX-2 – PEAK RATE OF 865 BOE/D - NATURAL FLOW Rex-2 drilled and fracced in August, tested in September 2019 Initial (constrained) peak production 865 boe/d* − 540 bbls/d oil − 2 mmscf/d gas Elevated porosity levels of up to 21% recorded through the sand (Rex-1: 18%) Toe Vertical Depth 1,572 me
Slide 7: Rex-2 Production Test Operations
REX-2 PRODUCTION TEST OPERATIONS* Well flowing under pump Day 1 - 2 First oil production Pump was disengaged and well began to Day 3 free flow Peak rate of 865 boe/d. Decision made to choke back well due to noise levels being Day 4 exceeded by the flare. Oil and gas rates continue to increas
Slide 8: Q4 Next Steps – Pipeline, Facilities and Rex-3
Q4 NEXT STEPS – PIPELINE, FACILITIES AND REX–3 Infrastructure ~3km pipeline to be built to connect to local gas network to sell Wizard gas Upgrade of modular facilities to ensure higher gas and oil production rates can be managed safely and efficiently Rex-3 WBE Working Interest 50% after comp
Slide 9: Investment Summary – Participate in a 2019 Growth Story
INVESTMENT SUMMARY – PARTICIPATE IN A 2019 GROWTH STORY Transformational Period for the Business Secured Wizard Lake opportunity First two successful wells drilled on time and on budget Results above expectations Modular and scaleable infrastructure Speedy approvals, quick implementation
Slide 10: Disclaimer
DISCLAIMER No representation or warranty, expressed or implied, is made by Whitebark Energy Ltd that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, Whitebark Energy, their officers, employees and advisers
Slide 11: Thank you
Thank you David Messina Managing Director E: david.messina@whitebarkenergy.com Slide 10