  1. Slide 1: Luanga | Critical Metals for Clean Air – November 2026 Corporate Presentation

    TSXV BRVO OTCQX BRVMF LUANGA | Critical Metals for Clean Air November 2026 Corporate Presentation Multi-Million Ounce Tier 1 Open-Pit PGM + Au + Ni Deposit at PFS Stage A member of High-Grade IOCG-Style Massive Sulphide Copper-Gold Discovery in the World Class Carajás Mineral District, Brazil PALLAD

  2. Slide 2: Forward-Looking Statement

    Forward-Looking Statement This presentation contains “forward-looking information” (also referred to herein as “forward-looking cause the actual results, level of activity, performance or achievements of Bravo and/or the Luanga Project to be statements”) under the provisions of applicable Canadian s

  3. Slide 3: MRE and PFS Technical Disclosure

    Mineral Resource Estimate (“MRE”) and Preliminary Economic Assessment (“PFS”) Technical Disclosure All scientific and technical information relating to the Mineral Resource Estimate (“MRE”) of the Luanga Project contained in this presentation is derived from Bravo’s Technical Report, titled “NI 43-1

  4. Slide 4: Investment Thesis

    INVESTMENT THESIS Multi-Million Ounce Tier 1 Open-Pit PGE+Au+Ni Deposit at PFS Stage Level & High-Grade IOCG/ISCG-Style Sulphide Cu-Au Discovery in the Right Place, with the Right People and the Right Strategy Multi-Million-Ounce Open Pit PGM+Au+Ni Located in the world-class Carajás deposit + High-G

  5. Slide 5: Strong Balance Sheet, Clean Capital Structure

    STRONG BALANCE SHEET, CLEAN CAPITAL STRUCTURE US$94 Million in Cash | Supported by renowned resource investors TSXV BRVO | OTCQX BRVMF BRAVO SHARE OWNERSHIP First Day of Trading (IPO price @ $1.75) July 21, 2022 7.8% TEMBO CAPITAL Share Price (as of November 9, 2026) C$2.40 42.7% 6.3% 52 Week High/L

  6. Slide 6: Disciplined Capital Deployment | Exceptional Value Creation

    DISCIPLINED CAPITAL DEPLOYMENT | EXCEPTIONAL VALUE CREATION Driving meaningful project de-risking while preserving financial strength Capital Strength: ~US$137M raised since inception, with ~70% (US$94M) still on the IPO balance sheet Public Off. | Follow-on 2 Capital Efficiency: Significant project

  7. Slide 7: Location Advantage

    LOCATION ADVANTAGE Low economic hurdle due to abundant infrastructure | Simple land status | Favourable fiscal regime INFRASTRUCTURE Cu-Au Occurrences* Air Rail Road Power Port PARAUAPEBAS: MINING CAPITAL OF PARÁ | Cu-Au (?) Regional centre for mining people, services & logistics EXISTING ESG ATTRIB

  8. Slide 8: 2026 PFS | Base Case Outcomes

    2026 PFS | BASE CASE OUTCOMES* Open pit mine, concentrator and Barcarena ZPE smelter producing a saleable PGM-Ni alloy US$785M US$1.45B 35.1% 2.0 years Initial Capex 10 years After-tax NPV8% After-tax IRR Payback, post-tax $604M Concentrator Life of mine $181M Smelter 3,938 kOz 394 kOz/y 538 kOz US$

  9. Slide 9: Sensitivity Analysis

    SENSITIVITY ANALYSIS* Economics Resilient Across the Price Cycle After-tax NPV (US$M) is most sensitive to metal prices *For full details, please refer to the Company's Technical Report dated Sep 16, 2026 and press release dated September 22, 2026 9 TSXV BRVO | OTCQX BRVMF

  10. Slide 10: PFS Development Cases Evaluated

    PFS DEVELOPMENT CASES EVALUATED* Four development cases were evaluated: two at PFS level and two at the PEA level Indicator Base Case Alternate A Alternate B Opportunity Case 10 Mtpa + integrated 10 Mtpa + staged Reduced 5Mtpa + 10 Mtpa + integrated Case Parameters smelter | 2P Reserve integrated sm

  11. Slide 11: Maiden Proven & Probable Reserve

    MAIDEN PROVEN & PROBABLE RESERVE Based on conversion ratio of 55% relative to the M&I Resource 86.7 Mt 2.77 g/t 7.73 Moz Proven & Probable ore PdEq grade1 Contained PdEq1 2026 Maiden Reserve 2P PdEq1 PdEq1 Pd Pt Rh Au 4E PGM Pd Pt Rh Au Ni Ni Tonnes Reserve2 Oz g/t g/t g/t g/t g/t g/t Oz Oz Oz Oz To

  12. Slide 12: Pit Constrained Proven & Probable Reserve

    PIT CONSTRAINED PROVEN & PROBABLE RESERVE 96% of Total MRE Tonnage Above 250 metres level from surface 12 TSXV BRVO | OTCQX BRVMF

  13. Slide 13: Opportunity Case Rationale | Ongoing Drilling

    OPPORTUNITY CASE RATIONALE | Ongoing Drilling to Support Resource Upgrade in the Next MRE Drilling well advanced Open at depth PFS Mine Plan 22,100m 69 of 81 planned holes Mineralization remains open below current drilling along 96% of mined 2P Reserve tonnage within 250m of of 2026 drilling planned

  14. Slide 14: Updated Site Layout

    UPDATED SITE LAYOUT Updated Tailings Storage Facility (TSF) location and adoption of conventional wet tailings storage, replacing the TSF Babylon dry-stack configuration CZ Target contemplated in the PEA 90Mt Solids Capacity Larger central waste dump with protective wall supporting the conventional

  15. Slide 15: Base Case - 4E PGM Production Profile

    BASE CASE - 4E PGM PRODUCTION PROFILE Material mined and payable precious metal production by year 393kOz 4E PGM LOM Avg. Production 15 TSXV BRVO | OTCQX BRVMF

  16. Slide 16: Base Case - Nickel Production Profile

    BASE CASE - NICKEL PRODUCTION PROFILE Material mined and payable precious metal production by year 10k tonnes Ni LOM Avg. Production 16 TSXV BRVO | OTCQX BRVMF

  17. Slide 17: PFS Commodity Mix: When Precious Meets Critical

    PFS COMMODITY MIX: WHEN PRECIOUS MEETS CRITICAL Mix offers economic resilience across commodity cycles Revenue Contribution by Product Diversified revenue mix • Strong and well-balanced exposure to Palladium, Platinum, Rhodium, and Nickel, complemented by Gold and Sulphuric Acid as by-product credit

  18. Slide 18: Gross Revenue and Free Cash Flow

    GROSS REVENUE AND FREE CASH FLOW 18 TSXV BRVO | OTCQX BRVMF

  19. Slide 19: Metallurgical Performance Improvements

    METALLURGICAL PERFORMANCE IMPROVEMENTS Jameson Cell technology delivers higher recoveries and ~100 g/t PGM+Au concentrate Extensive metallurgical testwork completed since the 2025 PEA Jameson Cell technology improves recoveries, selectivity and flotation performance Higher recoveries for Pd, Au and

  20. Slide 20: CAPEX | PFS Base Case

    CAPEX | PFS BASE CASE AACE Class 4 Estimate (−20% / +30% Accuracy Range) The ZPE Factor - Bravo authorized* to operate its smelter inside the ZPE Barcarena for 20 years Located at the Vila do Conde Port: a global and established logistics hub *Authorization published September 1, 2026 via Resolution

  21. Slide 21: OPEX | PFS Base Case

    OPEX | PFS BASE CASE US$47.56 US$478 US$706 OPEX / tonne milled C1 cash cost / oz 4E AISC / oz 4E LIFE-OF-MINE OPERATING COST BREAKDOWN Total LOM OPEX: US$4,124M Mining | US$2,541M Processing | US$803M G&A | US$475M US$3.83/t material moved US$9.26/t milled US$5.48/t milled Smelting & logistics | US

  22. Slide 22: OPEX | Luanga at 1st Quartile AISC

    OPEX | LUANGA AT 1ST QUARTILE AISC Potentially Positioned Among the Lowest-Cost PGM Operation 1,200 Co-Product All-in Sustaining Cash Cost Palladium Spot Price = US$1041/oz Marula 1,000 (US$/oz Palladium Equivalent) Tharisa Platinum Mile Marikana Impala Mimosa Eland des Iles Lac Platreef Styldrift Z

  23. Slide 23: Why the Smelter Strategy Makes Strategic Sense

    WHY THE SMELTER STRATEGY MAKES STRATEGIC SENSE Decades-Proven Technology | Strategic Location | Tax Benefits | Greater Control & Value Capture | Aligned with Brazil 23 TSXV BRVO | OTCQX BRVMF

  24. Slide 24: Concentrate Processing | ZPE Barcarena Smelter

    CONCENTRATE PROCESSING | ZPE BARVARENA SMELTER Downstream Processing converts Luanga concentrate into a sealable PGM+Au+Ni alloy Sulphuric acid Developed by Dr. Pyrometallurgy Roasting ~10% alloy yield sold to local fert. Rodney Jones Flowsheet extracts sulphur Producing a saleable Roasting → electr

  25. Slide 25: Global PGM Smelters

    GLOBAL PGM SMELTERS Vertical integration from mine to smelter is the prevailing model in the global PGM industry, with smelting capacity concentrated predominantly in Southern Africa Note: Includes operating smelters. Some facilities also refine PGMs. Source: Company websites, public reports 25 TSXV

  26. Slide 26: Permitting - LP in Hand | Next Milestone: LI

    PERMITTING - LP IN HAND | NEXT MILESTONE: LI Installation License (LI) application in Q4 2026 LP is the most critical, time-consuming and challenging to secure LP granted by SEMAS in March 2025, following approval of the EIA/RIMA and public consultation process Confirms the environmental viability o

  27. Slide 27: Financial Strength and Next Steps

    FINANCIAL STRENGTH AND NEXT STEPS Luanga has already been significantly de-risked across geology, metallurgy, engineering, permitting, with the completion of the PFS and a consolidated development strategy in place Mar 2025 Sep 2026 Q4 2026 Q1 2027 Ahead Preliminary Licence PFS complete, ZPE Install

  28. Slide 28: Copper-Gold Division

    Copper-Gold Division Led by Fabio Masotti: 30+ years global mining experience across 20+ countries; 31 years at Vale (up to Exploration Director) Zz 2? PALLADIUM NICKEL Pd Ni

  29. Slide 29: Copper-Gold Division | Building a Scalable Portfolio

    Copper-Gold Division | Building a Scalable Portfolio 29 TSXV BRVO | OTCQX BRVMF

  30. Slide 30: Copper-Gold Division | Unlocking the Carajás Opportunity

    Copper-Gold Division | Unlocking the Carajás Opportunity 30 TSXV BRVO | OTCQX BRVMF

  31. Slide 31: Cu-Au Opportunity Evaluation

    Cu-Au OPPORTUNITY EVALUATION Systematically Screening the Carajás District for Strategic Opportunities 31 TSXV BRVO | OTCQX BRVMF

  32. Slide 32: Luanga Located Within Trend of Major IOCG Deposits

    Luanga Located Within Trend of Major IOCG Deposits References to active mines and other mineral projects is for illustration purposes only. There can be no assurances the Company will achieve comparable results. IOCG Deposits in the Carajás Region Source: See last slide on this presentation 32 TSXV

  33. Slide 33: Ni and Cu Sulphide Prospectivity

    Ni and Cu SULPHIDE PROSPECTIVITY Massive Nickel Sulphide Discovery Prompted Detailed HeliTEM Program, BHEM and Interpretation AUGUST 3, 2022 - Bravo Intercepts Massive Sulphide Mineralization at its Luanga (PGM + Au + Ni) Project 1st DDH22LU47: 11m @4.24g/t PGM+2.04% Ni and 1.23% Cu from 131.1m incl

  34. Slide 34: T5 Target - DDH2405T002: 11.48m at 14.3% Cu and 3.3g/t Au

    T5 TARGET - DDH2405T002 | 11.48m at 14.3% Cu and 3.3g/t Au First Assay Result From First Drilled EM Anomaly Post HeliTEM and Bore-hole Electromagnetic (“BHEM”) FROM (m) TO (m) LENGTH (m) Cu % Au g/t 165.62 166.60 0.98 11.04 5.22 166.60 167.50 0.90 12.61 1.45 167.50 168.50 1.00 23.62 6.39 168.50 169.

  35. Slide 35: T5 Target - DDH2405T004: 8.75m at 9.48% Cu and 2.1g/t Au

    T5 TARGET - DDH2405T004 | 8.75m at 9.48% Cu and 2.1g/t Au 2nd Drill Hole - Completed 50m to the east of DDH2405T002 Supports the IOCG-style mineralization intersected in DDH2405T002 to the west and appears to confirm the continuity of the sulphide mineralization. Remains open along strike and up and

  36. Slide 36: Luanga Tenement Copper-Gold Mineralization

    LUANGA TENEMENT COPPER-GOLD MINERALIZATION Cu-Au Geology Cu-Au occurrences outside the Luanga PGM Complex are consistent with the Iron Sulphide Copper-Gold (ISCG) model Mineralisation is hosted in shear zones, with hydrothermal alteration and paragenetic sequences characteristic of ISCG/IOCG systems

  37. Slide 37: Priority Targets Selection

    PRIORITY TARGETS SELECTION First interpretation selected 54 targets 12 Cu-Au Targets Prioritized • Proximity to major shear- zone, traditional structures hosting IOCG/ISCG deposits • Airborne magnetic highs linked to IOCG alteration • Airborne Electromagnetic and ground microgravity anomalies • IOCG

  38. Slide 38: 2026-2027 Cu–Au Exploration Program

    2026-2027 Cu–Au EXPLORATION PROGRAM Systematic advancement of Cu–Au targets Phase 1 • Objective: • Better refine existing targets, generate new targets, drill test targets, define mineralization of economic potential • Targets: • Orion-Babylon-T5, Taurus-Pernambuco, Lizard, Gemini/T6, T1, T16, T17 •

  39. Slide 39: Bravo Expands Copper-Gold Footprint in Carajás, Brazil

    Canaã Copper-Gold Project Bravo Expands Copper-Gold Footprint in Carajás, Brazil Strategic entry into the Canaã IOCG district adds previously drilled Cu-Au prospects, extensive exploration data. 8,400m drilling program planned.

  40. Slide 40: Canaã Copper | Entry into the Canaã IOCG district

    Canaã Copper | Entry into the Canaã IOCG district 100% interest in a 6,185-hectare copper-gold exploration property in Pará, Brazil PROJECT CONTEXT • Immediately northeast of Canaã dos Carajás, an established mining and services centre. • Approximately 120 km southwest of Luanga via paved roads. • I

  41. Slide 41: Historical Exploration | Two Drilled Cu-Au Prospects

    Historical exploration | Two drilled Cu-Au prospects Drilling Highlights High-Grade Copper-Gold Potential at Canaã HISTORICAL WORK COMPLETED TAPUIA 28.45m @ 2.43% Cu + 0.78 g/t Au 5,009m OPCTD-011 | from 241.55m Diamond drilling across 27 holes 18.00m @ 2.72% Cu + 0.42 g/t Au OPCTD-003 | from 135.00

  42. Slide 42: Proposed Work Program | 8,400m of Drilling

    Proposed work program | 8,400m of drilling Initial focus on defining mineralization geometry and continuity, followed by broader target evaluation PHASE 1 | TAPUIA PHASE 2 | GUEROBA ~5,300m ~3,100m Infill and step-out diamond drilling on a planned Follow-up drilling after the Tapuia program to test

  43. Slide 43: For Additional Information Contact

    TSXV BRVO OTCQX BRVMF For additional information contact: ALEX PENHA EVP Corporate Development info@bravomining.com www.bravomining.com | LinkedIn @BravoMining | Twitter X @BRVOMining | YouTube Bravo Mining PALLADIUM PLATINUM RHODIUM GOLD NICKEL COPPER Pd Pt Rh Au Ni Cu

  44. Slide 44: Appendices

    TSXV BRVO OTCQX BRVMF APPENDICES PALLADIUM PLATINUM RHODIUM GOLD NICKEL COPPER Pd Pt Rh Au Ni Cu

  45. Slide 45: Leadership Strategy – Fit for Purpose Board

    LEADERSHIP STRATEGY – Fit for Purpose Board Global, Brazilian and PGM exploration, permitting, development, finance, construction and operation expertise LUIS MARGOT TONY STEPHEN STUART AZEVEDO NAUDIE POLGLASE QUIN COMLINE Executive Chairman & CEO Independent Director Independent Director Independen

  46. Slide 46: Leadership Strategy – Brazilian Expertise Key to Success

    LEADERSHIP STRATEGY – Brazilian Expertise Key to Success Brazilian and PGM, financial, exploration, permitting and development expertise SIMON MANOEL ALEX HEINRICH PAULO ILIDIO FABIO MOTTRAM CERQUEIRA PENHA MÜLLER DE BRITO MASOTTI President CFO EVP Corp. Dev. VP Technical Services VP Exploration Lea

  47. Slide 47: Bravo Technical and Metals Marketing Team

    BRAVO Technical and Metals Marketing Team Exceptional professionals with test-design-build success track-records across the industry SR. CHEMICAL ENGINEER +40 years of experience as metallurgist including PGM - Lonrho/Lonmin. Previously with Wayne Philips Kinross (Director – Technical), Avanco Resou

  48. Slide 48: Drilling to Date

    DRILLING TO DATE Bravo + VALE COMPANY DRILL HOLES METRES DRILLED (as of Oct 6, 2026) VALE 256 50,786 Bravo – 2022 135 23,259 Bravo – 2023 116 30,297 Bravo – 2024 94 19,269 Bravo – 2025 29 4,862 Bravo – 2026 97 28,272 Total Bravo 471 105,958 Bravo + VALE 723 156,311 The table above includes the 8 met

  49. Slide 49: 2025 MRE | Solid Platform to Support PFS

    2025 MRE* | Solid Platform to Support PFS Delineated to an average depth of 250m | Mineralization continues to depths of at least ~450m M&I: 10.4Moz PdEq | 158Mt at 2.04 g/t PdEq** • Includes 10Mt at 1.51 g/t PdEq of Oxide material or 510Koz PdEq Inferred: 5.0 Moz PdEq | 78Mt at 2.01 g/t PdEq** • In

  50. Slide 50: Site Access – Now 100% Paved | Power-Lines Along the Road

    Site Access – Now 100% Paved | Power-Lines Along the Road 2022 2023 2023 Luanga Deposit Construction Phase Road along the deposit Power Lines 2023 2025 2025 Paved Road to Site 50 TSXV BRVO | OTCQX BRVMF

  51. Slide 51: Social Responsibility

    SOCIAL RESPONSIBILITY Not just a moral obligation, but a crucial component of Bravo’s business success Bravo’s Nursery Distribution of Uniforms Christmas Food Drive Our partnership with local communities have been instrumental in securing social license and building a positive reputation Planting th

  52. Slide 52: ESG – Trust is the Rarest Commodity

    ESG – Trust is the Rarest Commodity Foundation of Bravo ESG Board Committee Environmental Social Governance WATER/LAND IMPACT PEOPLE INDEPENDENCE Disturbed land, predominantly used Brazilian employees & contractors: 80% of Board that is majority independent for cattle grazing workforce are residents

  53. Slide 53: 2026 Mineral Reserve Estimate at 0.87g/t PdEq Cut-off Grade

    2026 Mineral Reserve Estimate at 0.87g/t PdEq9 Cut-off Grade Proven & Probable: 7.7Moz at 2.77 PdEq9 Reserve PdEq1 Pd Pt Rh Au Ni Tonnes Classification g/t Oz g/t Oz g/t Oz g/t Oz g/t Oz % Tonnes Proven Reserves 17.7 2.99 1,703 0.95 541 0.82 466 0.12 70 0.08 44 0.1765 31,239 Probable Reserves 69.0 2

  54. Slide 54: 2025 Mineral Resource Estimate at 0.5g/t Cut-off Grade

    2025 Mineral Resource Estimate at 0.5g/t Cut-off Grade M&I: 10.4 Moz at 2.04 g/t PdEq | INFERRED: 5.0 Moz at 2.01 g/t PdEq Average Grades and Contained Metals Estimates Resource Classification Weathering Tonnes Pd Eq Pd Pt Rh Au Ni Mt g/t Oz g/t Oz g/t Oz g/t Oz g/t Oz % Tonnes Oxide 4 1.51 197 0.90

  55. Slide 55: 2025 MRE Notes

    2025 MRE NOTES * Notes: 1. Mineral resources are reported using the 2014 CIM Definition Standards and were estimated in accordance with the CIM 2019 Best Practices Guidelines, as required by National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). 2. This MRE includes I

  56. Slide 56: IOCG Deposits in the Carajás Region: Info Source

    IOCG Deposits in the Carajás Region: Info Source DEPOSIT SOURCE WEB LINK https://api.mziq.com/mzfilemanager/v2/d/53207d1c-63b4-48f1-96b7- Salobo Form 20-F - 2024 - 29/03/2025 page 94 19869fae19fe/df3a358f-454f-7ee4-a25d-e35a61922347?origin=1 The Gameleira Copper-Gold Deposit, Serra dos Polo (Pojuca