Macarthur Minerals Limited · ASX:MIO

Macarthur Minerals — Investor Presentation (March 2011)

31 slides from Macarthur Minerals's investor presentation, March 2011

  1. Slide 1: Corporate Presentation March 2011

    Slide 1: Corporate Presentation March 2011

    CORPORATE PRESENTATION March 2011

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER This presentation includes certain statements that may be considered “forward-looking information” within the meaning of applicable Canadian securities regulations and “forwarding-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995

  3. Slide 3: Introduction

    Slide 3: Introduction

    INTRODUCTION (TI MACARTHUR Minerals Limited

  4. Slide 4: Introduction

    Slide 4: Introduction

    INTRODUCTION 1. Development focused exploration and geological program at Lake Giles, Yilgarn Region of Western Australia. 2. Project located near existing transport, labour and energy infrastructure. 3. Focused on short term exploration of the DSO Hematite iron ore at lake Giles.  18 million tonne

  5. Slide 5: Yilgarn – Location at the heart of it all

    Slide 5: Yilgarn – Location at the heart of it all

    YILGARN – Location at the heart of it all 4

  6. Slide 6: How has this translated to shareholder value? Share structure

    Slide 6: How has this translated to shareholder value? Share structure

    HOW HAS THIS TRANSLATED TO SHAREHOLDER VALUE? $ CAD SHARE STRUCTURE  Shares Issued: 44,080,630  Options: 2,760,000  52 Week Trading high C$4.23  Warrants :2,339,150  52 Week Trading low C $1.20  Warrants from bought deal: 6,950,000  Fully Diluted: 56,963,780  February 9, 2011: Bought deal fi

  7. Slide 7: Corporate Governance Consulting Team

    Slide 7: Corporate Governance Consulting Team

    CORPORATE GOVERNANCE CONSULTING TEAM Alan Phillips – President/CEO/Chairman Engineering & Metallurgy: Engenium & Amdel Laboratories Director of ASX and TSX-listed companies in the mining sector since the early 1970‟s. He has brought to production Engenium has experience in scoping study management a

  8. Slide 8: Strategy

    Slide 8: Strategy

    STRATEGY (TI MACARTHUR Minerals Limited

  9. Slide 9: Infrastructure – Already available

    Slide 9: Infrastructure – Already available

    INFRASTRUCTURE – Already available 8

  10. Slide 10: Infrastructure – Port of Esperance

    Slide 10: Infrastructure – Port of Esperance

    INFRASTRUCTURE – Port of Esperance Owned by the Government of West Australia.  On the Southern Ocean.  Capacity to handle new freight.  Currently handling 8 million tonnes of iron ore.  Stage 1 expansion will increase capacity to 19 mpta, through efficiencies.  Bulk iron ore loader available re

  11. Slide 11: Geology

    Slide 11: Geology

    GEOLOGY (TI MACARTHUR Minerals Limited

  12. Slide 12: Geological, Environmental & Study Stages

    Slide 12: Geological, Environmental & Study Stages

    GEOLOGICAL, ENVIRONMENTAL & STUDY STAGES STAGE  Clark Hill  Snark 1 to 8  Sandlewood deposits (Magnetite)  Moonshine  Hematite delineation  Moonshine „Indicated‟ STAGE 9 2010 Target : 1.0Bt Magnetite Target : 10mt Hematite (DSO)  Prefeasibility Study – Hematite  Scoping Study – Magnetite  B

  13. Slide 13: Project Metrics – Hematite at Lake Giles

    Slide 13: Project Metrics – Hematite at Lake Giles

    Project Metrics – Hematite at Lake Giles Metrics Low Range High Range Comments Per tonne of Operating Costs ~ AUS $53 FOB AUS $59 FOB Iron Ore Top range AUS $150 includes a Total Direct Costs- AUS $100 million million dedicated haul road option Recovery ~ 85% 90% Iron Ore Grade~ 58% Fe 60% Fe Years

  14. Slide 14: Hematite Ore Characterisation – Banjo – Preliminary Metallurgy Testing

    Slide 14: Hematite Ore Characterisation – Banjo – Preliminary Metallurgy Testing

    HEMATITE ORE CHARACTERISATION – BANJO – PRELIMINARY METALLURGY TESTING – On 54.6% Fe Head Grade ORE PARAMETERS Units Values Bond Crushing Work Index Kwh/t 2.1 Bond Abrasion Index - 0.07 Mass FE% Si02 AI203 P LOI Split Banjo Lump 52.0% 59.0 5.0 2.9 0.060 7.1 Banjo Fines 48.0% 55.2 8.3 4.8 0.057 7.0 B

  15. Slide 15: Iron Ore Pricing – Conceptual

    Slide 15: Iron Ore Pricing – Conceptual

    IRON ORE PRICING- Conceptual  Spot1 :US $180  Discounted ($5.00/FeUnit) grade per Fe unit below benchmark2  Total ($20)3  Transportation: Australia to China  $15 per tonne  Royalties  $5.00/ tonne  Total FOB: Spot $180.00  Discount ($20.00)  Transportation ($15.00)  Royalties ($5.00) $140

  16. Slide 16: Conceptual Process Details – Hematite DSO

    Slide 16: Conceptual Process Details – Hematite DSO

    CONCEPTUAL PROCESS DETAILS- Hematite DSO Run of Mine Ore PRIMARY CRUSHING -200mm SECONDARY CRUSHING TERTIARY -60mm CRUSHING -30mm SCREENING, 30 and 6mm product decks Note Some intermediate steps omitted for clarity. If grade and mineralisation LUMP Stockpile FINES Stockpile allow or require, some be

  17. Slide 17: Moonshine Resource Estimate – Inferred resource magnetite

    Slide 17: Moonshine Resource Estimate – Inferred resource magnetite

    MOONSHINE RESOURCE ESTIMATE – Inferred resource magnetite (Mt) (% DTR) (% Fe) Exploration Goals FEED 710 30.6  Increase Inferred Resource +750mt  Infill RC drilling for Indicated Resources (high grade)  High Grade magnetite zone 12.5m@ 59.3%Fe recently reported.  Diamond core (top picture) for ~

  18. Slide 18: Project Metrics – Magnetite at Lake Giles

    Slide 18: Project Metrics – Magnetite at Lake Giles

    Project Metrics – Magnetite at Lake Giles Metrics Low Range High Range Comments IRR 23% AUS $2,651 NPV- AUS $2,525 million (10% WACC Real) million Per tonne of Operating Costs AUS $52.3 FOB AUS $59.3 FOB concentrate Total Direct Costs- $1,877 million $2,272 million Aus $ Range from metallurgy 45-52%

  19. Slide 19: Magnetite – Moonshine Preliminary Metallurgy Testing

    Slide 19: Magnetite – Moonshine Preliminary Metallurgy Testing

    MAGNETITE – MOONSHINE PRELIMINARY METALLURGY TESTING- Very High 2 Diamond Drill Holes Tested High Grade Grade 1 Head Grade 33.0% Fe 43.4% Fe DTR Concentrate 68.5% Fe 69.1% Fe Residual SiO2 4.3% 3.3% DTR Mass Recovery to Concentrate ~45.0% Fe ~51.0% Fe Low Intensity Magnetite Separation 45 45 Grind

  20. Slide 20: Conceptual Process Details – Magnetite

    Slide 20: Conceptual Process Details – Magnetite

    CONCEPTUAL PROCESS DETAILS- Magnetite Run of Primary Low Intensity Magnetic Mine Ore SAG Mill Separators (LIMS) Crush & screen similar to DSO. (May include Non-magnetic (reject) Primary coarse magnetic Crusher separation) Magnetics Secondary LIMS Ball Mills Non-magnetics Magnetics Tertiary LIMS Non-

  21. Slide 21: 2011 Focus

    Slide 21: 2011 Focus

    2011 FOCUS  Study Programs:  Engenium for PFS & DFS – Hematite 2011  Environmental studies  Trog & Styga Fauna  Stage 1& 2 Fauna, Flora  Heritage & Archaeological Survey  MalleeFowl Survey  Hydrological Survey  Impact Assessment Document Draft- Q4 2011  Achieving exploration goals of:  He

  22. Slide 22: What are our project timelines?

    Slide 22: What are our project timelines?

    What are our project timelines? Development Timelines- Hematite 2011 2012 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Project Description Environmental Approval Desktop Study Completed Spring Survey Completed Subterranean Survey Underway Stage 1- Fauna/Flora Underway Stage 2- Fauna/Flora Impact Assessment Doc. Approval

  23. Slide 23: What are our project timelines?

    Slide 23: What are our project timelines?

    What are our project timelines? Development Timelines- Hematite 2011 2012 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Project Description Project Execution Detail Design Procurement Construction Contractors Mining Contractor *Mining *Crushing *Screening Site Construction *Camp *Site Construction *Rail siding Constructi

  24. Slide 24: What are our project timelines?

    Slide 24: What are our project timelines?

    What are our project timelines? Development Timelines- Hematite 2011 2012 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Study Program Preliminary Study *MMS Board *Approval Definitive Feasibility *MMS Board *Approval Financing Timeframe Off-Take Negotiations Debt Negotiations 23

  25. Slide 25: Project Strengths

    Slide 25: Project Strengths

    PROJECT STRENGTHS  Development Stage- DSO for  Access to railways. early stage cash flow  Low risk development issues.  Favourable mineralisation geometry.  $20/t freight advantage over Canadian or African iron  Granted Mining Leases in Projects area.  Long term Magnetite operation  No land

  26. Slide 26: Comparable Emerging Iron Ore Trading Analysis – Regional Averages

    Slide 26: Comparable Emerging Iron Ore Trading Analysis – Regional Averages

    Comparable Emerging Iron Ore Trading Analysis- Regional Averages Group Average 2.35 Lake Giles $0.29 European $1.21 Canadian $1.74 Australian $3.87 African $0.81 $0.00 $1.00 $2.00 $3.00 $4.00 $5.00 African Australian Canadian European Lake Giles Group Average Source :TD Securities 25

  27. Slide 27: Comparable Emerging Iron Ore Trading Analysis – Australian Projects

    Slide 27: Comparable Emerging Iron Ore Trading Analysis – Australian Projects

    Comparable Emerging Iron Ore Trading Analysis- Australian Projects EV/tFe Res Iron Ore Holdings $0.73 Gindalbie $3.43 Brockman $0.92 BC Iron $9.20 MMS $0.29 $- $2.00 $4.00 $6.00 $8.00 $10.00 Source :TD Securities 26

  28. Slide 28: Case Study: CLM Partnership with WISCO

    Slide 28: Case Study: CLM Partnership with WISCO

    CASE STUDY: CLM PARTNERSHIP WITH WISCO 27

  29. Slide 29: Consolidated Thompson Iron Mines to be acquired by Cliffs Natural Resources

    Slide 29: Consolidated Thompson Iron Mines to be acquired by Cliffs Natural Resources

    CONSOLIDATED THOMPSON IRON MINES TO BE ACQUIRED BY CLIFFS NATURAL RESOURCES INC. JANUARY 11,2011  Cliff‟s Natural Resources Inc. to acquire Consolidated Thompson Iron Mines Ltd for C$17.25 per share in cash: Transaction value of approx. C$4.9 Billion  Implied premium of 30% to both closing share p

  30. Slide 30: Contact Details

    Slide 30: Contact Details

    CONTACT DETAILS AUSTRALIAN HEAD OFFICE Macarthur Minerals Limited Level 20, AMP Place 10 Eagle Street, Brisbane QLD 4000 Australia T : + 61 7 3229 3554 Contact Information : Alan Phillips, Chairman, President and CEO E : strategiccapital@bigpond.com David Taplin, Company Secretary/CFO E : dtaplin@ta

  31. Slide 31: Macarthur Minerals Limited

    Slide 31: Macarthur Minerals Limited

    (Th MACARTHUR Minerals Limited

Source: Internet Archive copy of macarthurminerals.com

More decks from Macarthur Minerals Limited

All 8 Macarthur Minerals decks