Macarthur Minerals Limited · ASX:MIO
Macarthur Minerals — Investor Presentation (March 2011)
31 slides from Macarthur Minerals's investor presentation, March 2011

Slide 1: Corporate Presentation March 2011
CORPORATE PRESENTATION March 2011

Slide 2: Disclaimer
DISCLAIMER This presentation includes certain statements that may be considered “forward-looking information” within the meaning of applicable Canadian securities regulations and “forwarding-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995

Slide 3: Introduction
INTRODUCTION (TI MACARTHUR Minerals Limited

Slide 4: Introduction
INTRODUCTION 1. Development focused exploration and geological program at Lake Giles, Yilgarn Region of Western Australia. 2. Project located near existing transport, labour and energy infrastructure. 3. Focused on short term exploration of the DSO Hematite iron ore at lake Giles. 18 million tonne

Slide 5: Yilgarn – Location at the heart of it all
YILGARN – Location at the heart of it all 4

Slide 6: How has this translated to shareholder value? Share structure
HOW HAS THIS TRANSLATED TO SHAREHOLDER VALUE? $ CAD SHARE STRUCTURE Shares Issued: 44,080,630 Options: 2,760,000 52 Week Trading high C$4.23 Warrants :2,339,150 52 Week Trading low C $1.20 Warrants from bought deal: 6,950,000 Fully Diluted: 56,963,780 February 9, 2011: Bought deal fi

Slide 7: Corporate Governance Consulting Team
CORPORATE GOVERNANCE CONSULTING TEAM Alan Phillips – President/CEO/Chairman Engineering & Metallurgy: Engenium & Amdel Laboratories Director of ASX and TSX-listed companies in the mining sector since the early 1970‟s. He has brought to production Engenium has experience in scoping study management a

Slide 8: Strategy
STRATEGY (TI MACARTHUR Minerals Limited

Slide 9: Infrastructure – Already available
INFRASTRUCTURE – Already available 8

Slide 10: Infrastructure – Port of Esperance
INFRASTRUCTURE – Port of Esperance Owned by the Government of West Australia. On the Southern Ocean. Capacity to handle new freight. Currently handling 8 million tonnes of iron ore. Stage 1 expansion will increase capacity to 19 mpta, through efficiencies. Bulk iron ore loader available re

Slide 11: Geology
GEOLOGY (TI MACARTHUR Minerals Limited

Slide 12: Geological, Environmental & Study Stages
GEOLOGICAL, ENVIRONMENTAL & STUDY STAGES STAGE Clark Hill Snark 1 to 8 Sandlewood deposits (Magnetite) Moonshine Hematite delineation Moonshine „Indicated‟ STAGE 9 2010 Target : 1.0Bt Magnetite Target : 10mt Hematite (DSO) Prefeasibility Study – Hematite Scoping Study – Magnetite B

Slide 13: Project Metrics – Hematite at Lake Giles
Project Metrics – Hematite at Lake Giles Metrics Low Range High Range Comments Per tonne of Operating Costs ~ AUS $53 FOB AUS $59 FOB Iron Ore Top range AUS $150 includes a Total Direct Costs- AUS $100 million million dedicated haul road option Recovery ~ 85% 90% Iron Ore Grade~ 58% Fe 60% Fe Years

Slide 14: Hematite Ore Characterisation – Banjo – Preliminary Metallurgy Testing
HEMATITE ORE CHARACTERISATION – BANJO – PRELIMINARY METALLURGY TESTING – On 54.6% Fe Head Grade ORE PARAMETERS Units Values Bond Crushing Work Index Kwh/t 2.1 Bond Abrasion Index - 0.07 Mass FE% Si02 AI203 P LOI Split Banjo Lump 52.0% 59.0 5.0 2.9 0.060 7.1 Banjo Fines 48.0% 55.2 8.3 4.8 0.057 7.0 B

Slide 15: Iron Ore Pricing – Conceptual
IRON ORE PRICING- Conceptual Spot1 :US $180 Discounted ($5.00/FeUnit) grade per Fe unit below benchmark2 Total ($20)3 Transportation: Australia to China $15 per tonne Royalties $5.00/ tonne Total FOB: Spot $180.00 Discount ($20.00) Transportation ($15.00) Royalties ($5.00) $140

Slide 16: Conceptual Process Details – Hematite DSO
CONCEPTUAL PROCESS DETAILS- Hematite DSO Run of Mine Ore PRIMARY CRUSHING -200mm SECONDARY CRUSHING TERTIARY -60mm CRUSHING -30mm SCREENING, 30 and 6mm product decks Note Some intermediate steps omitted for clarity. If grade and mineralisation LUMP Stockpile FINES Stockpile allow or require, some be

Slide 17: Moonshine Resource Estimate – Inferred resource magnetite
MOONSHINE RESOURCE ESTIMATE – Inferred resource magnetite (Mt) (% DTR) (% Fe) Exploration Goals FEED 710 30.6 Increase Inferred Resource +750mt Infill RC drilling for Indicated Resources (high grade) High Grade magnetite zone 12.5m@ 59.3%Fe recently reported. Diamond core (top picture) for ~

Slide 18: Project Metrics – Magnetite at Lake Giles
Project Metrics – Magnetite at Lake Giles Metrics Low Range High Range Comments IRR 23% AUS $2,651 NPV- AUS $2,525 million (10% WACC Real) million Per tonne of Operating Costs AUS $52.3 FOB AUS $59.3 FOB concentrate Total Direct Costs- $1,877 million $2,272 million Aus $ Range from metallurgy 45-52%

Slide 19: Magnetite – Moonshine Preliminary Metallurgy Testing
MAGNETITE – MOONSHINE PRELIMINARY METALLURGY TESTING- Very High 2 Diamond Drill Holes Tested High Grade Grade 1 Head Grade 33.0% Fe 43.4% Fe DTR Concentrate 68.5% Fe 69.1% Fe Residual SiO2 4.3% 3.3% DTR Mass Recovery to Concentrate ~45.0% Fe ~51.0% Fe Low Intensity Magnetite Separation 45 45 Grind

Slide 20: Conceptual Process Details – Magnetite
CONCEPTUAL PROCESS DETAILS- Magnetite Run of Primary Low Intensity Magnetic Mine Ore SAG Mill Separators (LIMS) Crush & screen similar to DSO. (May include Non-magnetic (reject) Primary coarse magnetic Crusher separation) Magnetics Secondary LIMS Ball Mills Non-magnetics Magnetics Tertiary LIMS Non-

Slide 21: 2011 Focus
2011 FOCUS Study Programs: Engenium for PFS & DFS – Hematite 2011 Environmental studies Trog & Styga Fauna Stage 1& 2 Fauna, Flora Heritage & Archaeological Survey MalleeFowl Survey Hydrological Survey Impact Assessment Document Draft- Q4 2011 Achieving exploration goals of: He

Slide 22: What are our project timelines?
What are our project timelines? Development Timelines- Hematite 2011 2012 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Project Description Environmental Approval Desktop Study Completed Spring Survey Completed Subterranean Survey Underway Stage 1- Fauna/Flora Underway Stage 2- Fauna/Flora Impact Assessment Doc. Approval

Slide 23: What are our project timelines?
What are our project timelines? Development Timelines- Hematite 2011 2012 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Project Description Project Execution Detail Design Procurement Construction Contractors Mining Contractor *Mining *Crushing *Screening Site Construction *Camp *Site Construction *Rail siding Constructi

Slide 24: What are our project timelines?
What are our project timelines? Development Timelines- Hematite 2011 2012 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Study Program Preliminary Study *MMS Board *Approval Definitive Feasibility *MMS Board *Approval Financing Timeframe Off-Take Negotiations Debt Negotiations 23

Slide 25: Project Strengths
PROJECT STRENGTHS Development Stage- DSO for Access to railways. early stage cash flow Low risk development issues. Favourable mineralisation geometry. $20/t freight advantage over Canadian or African iron Granted Mining Leases in Projects area. Long term Magnetite operation No land

Slide 26: Comparable Emerging Iron Ore Trading Analysis – Regional Averages
Comparable Emerging Iron Ore Trading Analysis- Regional Averages Group Average 2.35 Lake Giles $0.29 European $1.21 Canadian $1.74 Australian $3.87 African $0.81 $0.00 $1.00 $2.00 $3.00 $4.00 $5.00 African Australian Canadian European Lake Giles Group Average Source :TD Securities 25

Slide 27: Comparable Emerging Iron Ore Trading Analysis – Australian Projects
Comparable Emerging Iron Ore Trading Analysis- Australian Projects EV/tFe Res Iron Ore Holdings $0.73 Gindalbie $3.43 Brockman $0.92 BC Iron $9.20 MMS $0.29 $- $2.00 $4.00 $6.00 $8.00 $10.00 Source :TD Securities 26

Slide 28: Case Study: CLM Partnership with WISCO
CASE STUDY: CLM PARTNERSHIP WITH WISCO 27

Slide 29: Consolidated Thompson Iron Mines to be acquired by Cliffs Natural Resources
CONSOLIDATED THOMPSON IRON MINES TO BE ACQUIRED BY CLIFFS NATURAL RESOURCES INC. JANUARY 11,2011 Cliff‟s Natural Resources Inc. to acquire Consolidated Thompson Iron Mines Ltd for C$17.25 per share in cash: Transaction value of approx. C$4.9 Billion Implied premium of 30% to both closing share p

Slide 30: Contact Details
CONTACT DETAILS AUSTRALIAN HEAD OFFICE Macarthur Minerals Limited Level 20, AMP Place 10 Eagle Street, Brisbane QLD 4000 Australia T : + 61 7 3229 3554 Contact Information : Alan Phillips, Chairman, President and CEO E : strategiccapital@bigpond.com David Taplin, Company Secretary/CFO E : dtaplin@ta

Slide 31: Macarthur Minerals Limited
(Th MACARTHUR Minerals Limited
Source: Internet Archive copy of macarthurminerals.com
More decks from Macarthur Minerals Limited
Investor Presentation (March 2024)12 slides · Mar 8, 2024
Investor Presentation (April 2022)36 slides · Apr 7, 2022
Investor Presentation (March 2013)22 slides · March 2013
2012 TD Mining Conference33 slides · Mar 18, 2012
Investor Presentation (January 2011)38 slides · January 2011
Investor Presentation (August 2009)26 slides · August 2009