Macarthur Minerals Limited · ASX:MIO
Macarthur Minerals — Investor Presentation (August 2009)
26 slides from Macarthur Minerals's investor presentation, August 2009

Slide 1: Macarthur Minerals Corporate Presentation
Macarthur Minerals ud Corporate Presentation : A.GIN 103 011 436 >” -www.macarthurminerals.com

Slide 2: Macarthur Minerals Ltd is an Australian public company listed on the TSX Venture Exchange
Macarthur Minerals Ltd is an Australian public company listed on the TSX Venture Exchange. It is focused on the exploration and development of tenements in Western Australia. a Established in 2005, offices in Brisbane, Perth and Vancouver, TSX-V listed company. Code : MMS 4 m= Experienced management

Slide 3: Lake Giles is an iron ore and base metals project
Lake Giles is an iron ore and base metals project located 450km east-northeast of Perth, Western Australia. ek konaet It lies within the Southern Cross Province, host to numerous gold, nickel sulphides and iron ore projects.

Slide 4: Location map
= Brisbane Head OiTice” ; Location vale oo ~ WWW.macarinurminerals. com oe Pert Project Otrice Esperance — wi

Slide 5: Lake Giles Iron Ore Project

Slide 6: a Www.macartnurminerals.com
a MACARTHUR MINERALS LTD. TSX V: MMS Www.macartnurminerals.com

Slide 7: Moonshine, Clark Hill and Sandalwood deposits map
~ Clark Hill , Snar and Sandalwood Deposits ~stace 7 Moonshine Deposit PRIORITY GORRIDOR Moonshine North , Moonshine Trend. * / \ _ _— a _ > = SS Clark Hint North \ = _ Ss Clark Hill South [ian \ 7 <= | XX , \ f -.— * N Des Sandalwood fie \ ~ ” ad ' N . \ cas ~~ — \ x \ 3 i \ pero a - Priority ‘ yf

Slide 8: Interpretation to 250mRL
a Interpretation to 250mRI m Mineralisation over 3 km 84,000 tonnes per linear metre m 1,300,000 tonnes per vertical metre Ww Wwurnacartnurningras. com Cut-off 15% Davis Tube Recovery (DTR). MACARTHUR MINERALS LTD. TSX Vi MMS Note : Figures contained within table have been rounded and Concerntrate r

Slide 9: RC drill hole intersections
LGRC 148 145 m at 29.2% Mass Recovery LGRC 108 at 67.7% Fe from 50m 2 81 m at 28.9% Mass Recovery ” at 67.6% Fe from 65m MACARTHUR MINERALS LTD. LGRC 120 TSX V: MMS 91 m at 33.4% Mass Recovery at 65.6% Fe from 185m LGRC 142 75 m at 38.9% Mass Recovery at 69.7% Fe from 140m LGRC 145 90 m at 25% Mass

Slide 10: Moonshine Geological Section
30m at 22.8% Mass Recovery 145m at 29.2% Mass Recovery % Fe from 65m at 67.7% Fe from 50m LE BAD \ VW 400 mRL \ is \ Base Of Complete Oxidation \ > Resources 155m at 30.5% WES peated] Estimated Depth at 67.0% Fe from 55m 250 mRL \ \ 300 mRL \ Meigen LGRC163 LGRC132 - ~~. 1283] TN, — — SO, = LGRC133.

Slide 11: Schematic Exploration Model
WWW dCariiUrminerdls COM) Schematic Exploration Model

Slide 12: Hematite and magnetite exploration model
WN MACARTHUR MINERALS LTD. TSX V: MMS 6,705,000 mN' 6,670,000 mN Hematite Magnetite |

Slide 13: Moonshine North priority corridor target
u’ 2 Moonshine ~ North 788,000 mE 791,000 mE 792,000 me Moonshine | (North ) utc: MINERALS LTD. 6.676, A 6,675,000 mN TSX V: MMS 6,674,000 mN 6,673,000 mN = Priority Corridor Target = Geologically Identical to Moonshine deposit. 6,672,000 mn 6671,000mN —EE *. e Lost World ii Target

Slide 14: Resource Estimate
Resource Estimate Inferred Mineral Resource as at 30 June 2009 Project Mt % Fe Snark 26 27.5 ma Clark Hill North 37 26.0 MACARTHUR Sandalwood 85 28,3 ae ie Clark Hill South 49 21.9 Moonshine 253 26.4 Total 450 26.3 Mineral Notes : 1. Snark, Clark Hill and Sandlewood deposits estimated by Hellman & S

Slide 15: Resource Growth and Potential
Resource Growth and 1000 500 Potential sauuoy UOliI 6002 Jaquiaydag 6002 YyoueN) 8002 JaquisAON 8002 aunf 2002 isniny no = 5 = 3 a an = oe OZ 32 Wwww.macarthurminerals.com

Slide 16: Moonshine (Schematic)
Moonshine ( Schematic ) Conceptual Pit design. West and East Lodes. Interpreted Synformal feature. Geometry of lodes lends itself to favourable strip ratio. —- ss MACARTHUR MINERALS LTD. TSX V: MMS

Slide 17: Conceptual Magnetite Concentration Process
Conceptual Magnetite Concentration Process yc ac See, REGRIND BALL MILL PEBBLE CRUSHER “eG == 1 ' PRIMARY i CLASSIFYING ' f f f ' i] STACKER ' ' ' CONCENTRATE CRUSHER c= CYCLONES : PUMP & PIPE ' re) A i JE, Picco -f \ a a ee — & a ORE STOCKPILE A ai oGeNous ROUGHER MAGNETIC FINISHER MAGNETIC CLASSIF

Slide 18

Slide 19: - =" ALT } WH I ite i
- =" ALT } WH I ite i — ~—6©@éBI handling Inader avail:

Slide 20: a
a MACARTHUR MINERALS LTD. TSX V: MMS

Slide 21: Western Australia infrastructure, rail and ports
7 \ MACARTHUR MINERALS LTD. TSX V: MMS ODerby (1 mtpa) Port Hedland Dampier ¢ Karratha S @hcep Bar } Exmouth fe) Ao Proposed Oakalee Bulk Materials Port 35 mipa Geraldton (1.5 mtpa) Taverton T Windimurra \ Vanadium | Kalgoorlie ‘: Kambalda Southern Northan/ Cross ‘Norseman Esperance Wyndham Halls Cr

Slide 22: Management
Management David Barwick, Chairman, President, CEO Accountant with more than 37 years experience. Chairman of Metallica Minerals Ltd , Metrocoal Limited, Queensland Gold and Minerals Ltd,Queensland Ores Ltd,and Manaccom Corporation Ltd. James Canning-Ure, Director James has over 20 years’ experience

Slide 23: Peer comparison
7 \ MACARTHUR MINERALS LTD. TSX V: MMS ‘ASX: ARH ASX: CFE ASX: GBG ASX: MIS MMX ASX: GRR TSX: MMS Initial Investment 1$100 m Equity for the rights to - T.S400 M purchase & T$572 M for 50% equity in project $1 - 1.3 billion takeover $200 m deferred carry funding 100% Finance 2,817.42 M for 10% 2.8162

Slide 24

Slide 25: Forward-looking statements disclaimer
Statements contained in this material, particularly those regarding possible or assumed future performance, production levels or rates, metal prices, resources or potential growth of Macarthur Minerals Ltd, industry growth or other trend projections are, or may be, forward looking statements. Such s

Slide 26: www.macarthurminerals.com
7 MACARTHUR MINERALS LTD. TSX V: MMS www.macarthurminerals.com
Source: Internet Archive copy of macarthurminerals.com
More decks from Macarthur Minerals Limited
Investor Presentation (March 2024)12 slides · Mar 8, 2024
Investor Presentation (April 2022)36 slides · Apr 7, 2022
Investor Presentation (March 2013)22 slides · March 2013
2012 TD Mining Conference33 slides · Mar 18, 2012
Investor Presentation (March 2011)31 slides · March 2011
Investor Presentation (January 2011)38 slides · January 2011