Talonx Resources Limited · ASX:TXR

Talonx Resources — Botswana Resources Conference 2017

13 slides from Talonx Resources's conference presentation, Jun 7, 2017

  1. Slide 1: Mount Burgess – Kihabe Zinc/Lead/Silver Project, Botswana

    ASX Code: MTB 7 June 2017 MOUNT BURGESS – KIHABE ZINC/LEAD/SILVER PROJECT, BOTSWANA PRESENTATION PACK – BOTSWANA RESOURCES CONFERENCE The following presentation pack provides an overview of recent developments and the Company’s strategic direction and will be presented at the upcoming Botswana Resou

  2. Slide 2: Kihabe Zn, Pb, Ag Project

    Kihabe Zn, Pb, Ag Project Botswana 8/800 Albany Highway East Victoria Park, WA 6101 www.mountburgess.com mtb@mountburgess.com ASX: MTB

  3. Slide 3: Disclaimer: Forward Looking Statement

    Disclaimer : Forward Looking Statement This presentation contains forward looking statements in respect of the projects being reported on by the Company. Forward looking statements are based on beliefs, opinions, assessments and estimates based on facts and information available to management and/or

  4. Slide 4: Aiming for Near Term Production at Nxuu

    AIMING FOR NEAR TERM PRODUCTION AT NXUU STRATEGY Licence recently granted to 2023 Board strengthened Three prongs of project development Actively exploring – news flow! Timed to positive zinc outlook RESOURCE FEASIBILITY EXPLORATION • Kihabe and Nxuu deposits • Ongoing Process Flow • Only small port

  5. Slide 5: 2016 RC Drilling Confirmed Extensions to the Mineralised Sedex Zn, Pb, Ag Field

    2016 RC DRILLING CONFIRMED EXTENSIONS TO THE MINERALISED SEDEX Zn, Pb, Ag FIELD Kihabe 14.4Mt Resource* Nxuu 10.9Mt Resource* * See slide 5 for Resource details

  6. Slide 6: Kihabe – Nxuu Resource Statement

    KIHABE – NXUU RESOURCE STATEMENT External Indicated Inferred Total Contained Zinc Contained Lead Deposit Zn-eq Cut % M Tonnes % M Tonnes % M Tonnes % metal (kt) metal (kt) Kihabe 1.5% 11.4 @ 2.90%* 3.0 @ 2.60%* 14.4 @ 2.84%* 259kt 115kt Nxuu 0.3% - 10.9 @ 3.20%* 10.9 @ 3.20%* 196kt 153kt 11.4 @ 2.90

  7. Slide 7: Potential to Increase Resource Within Existing Kihabe 0.5% ZnEq Resource Envelope

    POTENTIAL TO INCREASE RESOURCE WITHIN EXISTING KIHABE 0.5% ZnEq RESOURCE ENVELOPE • Current Resource based on 127 Reverse Circulation Results from DD DD % Increase on RC result (RC) and 36 Diamond Drill (DD) holes o • Twinning of RC holes with Diamond Drilling revealed a Section 9,900mE KDD105 (-60

  8. Slide 8: Nxuu – Potential Shallow Open Pit Oxides

    NXUU – POTENTIAL SHALLOW OPEN PIT OXIDES • 7km East of Kihabe • Surface area of 550m x 250m basin shape • Near surface, shallow basin-shaped pit • Resource envelope from 10m to 60m below surface • Indicative SR of 3:1 • All oxide (Zn as Smithsonite, Pb as Cerussite) • Silver and Germanium also prese

  9. Slide 9: Potential Low Risk, Low Capex, Early Production

    POTENTIAL LOW RISK, LOW CAPEX, EARLY PRODUCTION • Shallow drilling = low cost for substantial resource upgrade • Uniform, simple mineral suite = simple process flow • Occurs in quartz wacke NOT dolostone / carbonates = low acid consumption • Good metallurgical recoveries using conventional process f

  10. Slide 10: Kihabe – Potential Open Pit

    KIHABE – Potential open pit Zinc Model 9900mE Section 1200m RL • Strike length 2.4km KALAHARI SAND • SedEx style - Mineralisation occurs in quartz wacke at near vertical contact with 12m below surface OXIDISED regional dolomite 1150m RL • 25% Near surface oxides (Zn as Smithsonite & Baileychlore; Pb

  11. Slide 11: Kihabe – Wide Zones of Mineralisation for Extended Regions of the Kihabe Resource

    KIHABE – Wide zones of mineralisation for extended regions of the Kihabe Resource Zinc Model 10400mE Section Zinc Model 11600mE Section

  12. Slide 12: Kihabe – Nxuu Project

    KIHABE – NXUU PROJECT KIHABE – NXUU PROJECT REGIONAL SITE OPERATIONS • Deposits are 7km apart in a • Planned gov’t backed grid power • Relatively shallow mineralisation region of relatively flat, line upgrade passes 100km from for potential open pit mining unpopulated scrub lands. project area • Goo

  13. Slide 13: Road Map

    ROAD MAP Compelling investment case for short term opportunity and long term strategic growth. RESOURCE Diamond Drilling (subject to funding) to resolve grade under- call and upgrade Kihabe and Nxuu Resource to comply with JORC 2012 FEASIBILITY Ongoing investigations including – Power contingency, p

Talonx Resources — Botswana Resources Conference 2017 on 6ix