Czr Resources Ltd · ASX:CZR

Czr Resources — Coziron Resources — Investor Presentation (September 2020)

17 slides from Czr Resources's investor presentation, Sep 15, 2020

  1. Slide 1: Investor Presentation

    Investor Presentation Pilbara focussed Gold & Iron Ore September 2020 Top Camp mapping 2020

  2. Slide 2: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement Disclaimer This presentation has been prepared by Coziron Resources Limited (“CZR”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third par

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Capital Structure (ASX:CZR) Share Price Performance Current Shares On Issue (m) 2,853 Unlisted Options (m) 474 Market Capitalisation @(0.019cps) (A$m) $54.2 Cash (August 2020) (A$m) $4.3 Debt (August 2020) (A$m) nil Major Shareholders Creasy Group 58.4% Total top 20 holders 71% Op

  4. Slide 4: Directors & Management

    Directors & Management Board of Directors • Mr Flanagan is a geologist and experienced exploration and mining executive with more than 25 years experience. Mr Flanagan previously led the David Flanagan AM CitWA development of Atlas Iron as Managing Director and Non Executive Chairman, was the Chance

  5. Slide 5: Asset Update

    Asset Update Croydon Gold Project (70% CZR, 30% Creasy): Croydon • Structurally controlled, orogenic gold from the Pilbara Craton. • Top Camp gold discovery is proximate to DeGrey’s Hemi discovery. • Second RC drilling programme completed with results pending. • Follow-up sampling along major struct

  6. Slide 6: Croydon Gold Project

    Croydon Gold Project Top Camp RC Drilling August 2020 6

  7. Slide 7: Updating Croydon Structural Setting

    Updating Croydon Structural Setting • Croydon covers 320km2 in the Mallina Basin and about 40km of the regional Tabba Tabba shear- zone some 50-90 km along trend from DeGrey’s Hemi. • New regional GSWA airborne gravity data is being processed and overlain on the regional magnetics. • New structural

  8. Slide 8: Top Camp Prospect – Follow-up Drilling

    Top Camp Prospect – Follow-up Drilling • At least 4 km2 showing prospector disturbance and coherent gold and pathfinder geochemistry with minimal historical drilling broadly. • Maiden RC drilling in late 2019 reported metre intercepts >0.5g/t Au in 9 of 13, 200m deep holes with best result of 8m at

  9. Slide 9: Emerging Prospects near Top Camp

    Emerging Prospects near Top Camp • 100km2 of the Mallina Basin with widespread evidence of prospector activity, historical stream-sediment samples with gold greater than 100ppb. • New geophysical data-sets are being used for interpretation and targeting. • Increasing the coverage and density of grid

  10. Slide 10: Yarraloola Iron-Ore Project

    Yarraloola Iron-Ore Project Sonic core-drilling on the Robe Mesa for metallurgical samples. 10

  11. Slide 11: Yarraloola – Review

    Yarraloola – Review • Two major prospects; Robe palaeo-channel pisolitic iron-stones and Ashburton magnetite. • Robe, Robe East and P529 deposits1,2,3 are candidates for near-term development into mines • Robe Mesa total resource of 89Mt @ 54% includes 24Mt higher-grade (+55%Fe, calcining to 62.7%Fe

  12. Slide 12: Robe Mesa Deposit - Review

    Robe Mesa Deposit - Review • Robe Mesa resource has results for geology, geochemistry and some metallurgy. • The palaeo-river system hosting the deposits and produce direct-shipping iron-ores on adjacent tenements • Although 400km from Pt Hedland, other closer proposed ports have the potential to de

  13. Slide 13: Robe Mesa Deposit - Prefeasibility Parameters

    Robe Mesa Deposit - Prefeasibility Parameters • Prefeasibility study is assessing potential to produce from higher grade (+55% Fe) upper zone material at a rate of 1.5-2.5Mt/annum with a low-strip ratio and using road-train haulage of 400km to `Pt Hedland1. • PFS to deliver OPEX, CAPEX, marketing st

  14. Slide 14: Buddadoo Gold and Iron-ore Project

    Buddadoo Gold and Iron-ore Project Buddadoo project area 14

  15. Slide 15: Buddadoo Gold

    Buddadoo Gold • Area of highest interest is the 25 strike-km of Gullewa Greenstone Belt along the regional Salt Creek Shear zone in the Murchison Province of the Yilgarn. • Tenement holding shares a northern boundary with Firefly Resource (ASX:FFR) • Five independently generated targets for orogenic

  16. Slide 16: Upcoming Catalysts

    Upcoming Catalysts • Gold – Progress reports for RC, soil and rock-chips from Top Camp and other Croydon prospects. – Next phase target generation from geophysical interpretation, mapping, soil, rock-chip and drilling results. – Additional 3000m of RC being planned for Top Camp and other selected pr

  17. Slide 17: Contacts

    Contacts Rob Ramsay Managing Director Email: rob.ramsay@czrresources.com Phone: +61 8 6211 5090 Top Camp drilling grid August 2020.

Coziron Resources — Investor Presentation (September 2020) on 6ix