    12 November 2018 200 Jasmine lnternational Tower 15th Floor, Moo 4, Chaengwattana Rd., T.Pakkred, INVESTOR RELATIONSHIP A.Pakkred, Nonthaburi, 11120 PRESENTATION www.unique.co.th ir@unique.co.th

  2. Slide 2: Table of Content

    Table of Content Potential Future Projects 2 Interested Projects 30 Current Backlog 33 Financials 35 Experiences 41 Facilities and Machineries 62 1

  3. Slide 3: Government Infrastructure Projects

    Government Infrastructure Projects Development of Enhancing Thailand’s 1 4 Inter-City Rail Network Air Transport Competitiveness 670 billion Baht, 25% 89 billion Baht, 3% Development of Transportation in Development of Water 2 Bangkok and its Vicinity 5 Transport Network 1.2 trillion Baht, 44% 100 b

  4. Slide 4: Development of Inter-City Rail Network

    DEVELOPMENT OF INTER-CITY RAIL NETWORK 3

  5. Slide 5: Double Track Railway

    Double Track Railway Double Track Routes Distance (km.) Value (btbn) Commenced 1. Kaeng Koi – Klong 19 110 10 2. Jira Road Station – Khon Kaen 185 26 3. Lop Buri - Pak Nampho 118 18.7 4. Mab Kabao - Jira Road Station, contract 1 and 3 66 16.9 5. Nakhon Pathom - Hua Hin 170 15.7 6. Prachuap Khiri Kha

  6. Slide 6: Double Track Railway

    CHIANG KONG Double Track Railway Khon Kaen - Nong Khai Pai - jakorn Phanom Mab Jira Nr Gion (2) UNIQUE sersseen,

  7. Slide 7: Pan Asian Railway Network

    Pan Asian Railway Network Linking Kunming to Singapore Eastern Route • 5,500 kilometers • Via Hanoi, Ho Chi Minh, Panom Penh Central Route • 4,500 kilometers • Via Vientiane, Nong Khai Western Route • 4,760 kilometers • Via Yangon All three routes will meet in Bangkok and Continue to final destinati

  8. Slide 8: East-West Economic Corridor (EWEC)

    7 East-West Economic Corridor (EWEC) 7

  9. Slide 9: North-South Economic Corridor (NSEC)

    North-South Economic Corridor (NSEC) 8

  10. Slide 10: High Speed Trains

    High Speed Trains ® BANGKOK - RAYONG e BANGKOK - CHIANG MAI © BANGKOK - PADANG BESAR e BANGKOK - NONG KHAI (2) UNIQUE sersseen,

  11. Slide 11: High Speed Trains

    High Speed Trains Double Track Routes Distance (km.) Value (btbn) 1. High-speed train: Bangkok - Chiang Mai route 680 387.8 2. High-speed train: Bangkok - Nong Khai route 615 170.5 | 3. High-speed train: Bangkok - Padang Besa 982 124.3 4. High-speed train: Bangkok - Rayong 221 100.6 | Total 783.2 >

  12. Slide 12: Development of Transportation in Bangkok and Its Vicinity

    DEVELOPMENT OF TRANSPORTATION IN BANGKOK AND ITS VICINITY 11

  13. Slide 13: Bangkok Mass Rapid Transit Lines Map

    mercer 3. Dark Green Line (66.5 km.) Ring Roos tions Wet oatucnak Paonia Pahoa Yonia/ A paveantatPias 0: - as ‘Badge, r 5 10. Purple Line (42.8 km itn os PF sieu9n $Suansou sii 7. Ai rt Rail Link (50.3 km. Saunt SlsManmanp _Aancnapik_ Bn Cig rapthong tate oe Wen S ; ong falatan Tatan Tlngchan Seaman

  14. Slide 14: Mass Rapid Transit Lines

    12 Mass Rapid Transit Lines Projects Employers Distance (km.) Value (mb.) Status 1. Dark Red Line Rangsit – Mahachai SRT 80.8 140,490 Commenced 2. Light Pink Line Kae Lai – Meenburi SRT 54 82,470 Pending 3. Dark Green Line Lamlukka – Samurprakarn MRTA 66.5 94,970 Commenced 4. Orange Line Talingchang

  15. Slide 15: Tram-Train

    Tram-Train Chiang Mai Pattaya • Value = 95,321 Million Baht • Value = 8,000 Million Baht • Distance = 34.93 km • Distance = 8 km Hat-Yai Phuket • Value = 16,100 Million Baht • Value = 30,154 Million Baht • Distance = 12.54 km • Distance = 41.70 km Nakhon Ratchasima Khonkaen Phase 1 (2563-2565) • Val

  16. Slide 16: Improvement of Highway Network to Link Local Production Hubs

    Improvement of Highway Network to Link Important Local Production Hubs with Markets in Neighboring Countries 15

  17. Slide 17: Motorway

    Motorway Projects Distance (km.) Value (btbn) 1. Motorway Bang Pa In and Nakhon Rachasima Roadways 196 84.6 2. Motorway Bang Yai - Ban Pong - Kanchanaburi Roadways 96 45.9 3. Motorway Pattaya - Mabtapud Roadways 32 18 4, Motorway Nakornprathom - Cha Um Roadways 118 80.6 5. Motorway Had Yai - Sa Dao

  18. Slide 18: Motorways: Bang Pa In - Nakhon Rachasima

    Motorways Bang Pa In - Nakhon Rachasima 17

  19. Slide 19: Motorways: Bang Yai - Ban Pong - Kanchanaburi

    Motorways Bang Yai – Ban Pong – Kanchanaburi 18

  20. Slide 20: Motorways: Pattaya - Mabtapud

    M7 Motorways Pattaya – Mabtapud 19

  21. Slide 21: Motorways

    Motorways Motorways Ban Yai – Ban Pong Nakornprathom – Cha Um 20

  22. Slide 22: Motorways: Had Yai - Sa Dao

    Motorways sh . Had Yai — Sa Dao aa Had Yai melas . wrelng) } 2 Distance 70 km. ia ~ Value 30.5 btbn 5 - (3h UNIQUE seaenre. 1

  23. Slide 23: Enhancing Thailand's Air Transport Competitiveness

    ENHANCING THAILAND’S AIR TRANSPORT COMPETITIVENESS 22

  24. Slide 24: Airport

    Airport Suvanabhumi Airport – Phase 2 Don Mueang Airport – Phase 3 • Value = 62,000 Million Baht • Value = 32,000 Million Baht U-Tapao Airport Chiang Mai Airport – Phase 2 • Value = 310,383 Million Baht • Value = 11,000 Million Baht 23

  25. Slide 25: Development of Water Transport Network

    DEVELOPMENT OF WATER TRANSPORT NETWORK 24

  26. Slide 26: Deep Seaport

    Hettttt+++++—s Existed rail way H+++t+t++++ ~=—s New proposed rail way New proposed 4 lanes roads New proposed roads -———_—S o-— - - Deep Seaport > UNIQUE Besee,

  27. Slide 27: Deep Seaport Project

    Bay of farrgal MIDDLE EAST, EUROPE, - Spratly Ieiande DP ARS | rronssitt CHINA ; PACIFIC, * usA, INDIAN OCEAN ” ota Kinabos — Urmamasowhainkaiaey ¢ umiou oy Deep Seaport Project.

  28. Slide 28: Thailand Water Resources Management (Year 2018)

    Thailand Water Resources Management (Year 2018) Total Project: 4 projects Total Value: 8.8 Billion Baht Khong Wang Tanot Reservoir: Value = 6.1 Billion Baht Khong Praked Reservoir: Value = 0.96 Billion Baht Khong Hang Maeo Reservoir: Value = 0.82 Billion Baht To develop water resource in Chanthaburi

  29. Slide 29: Eastern Economic Corridor Development project (EEC)

    Eastern Economic Corridor Development project (EEC) 28

  30. Slide 30: Eastern Economic Corridor Development Project (EEC)

    Eastern Economic Corridor Development Project (EEC) High speed train connecting 3 major airports (Don Muang Airport – Suvarnabhumi Airport – U-Tapao Airport) Value = 200,000 Million Baht Development of U-Tapao Airport Value = 310,383 Million Baht Development of Laem Chabang port phase 3 Value = 155,

  31. Slide 31: UNIQUE's Interest

    UNIQUE’s Interest Mass Rapid Transit Double Tracks NSEC & EWEC High Speed Trains Motorways Ports Airports Water Management Eastern Economic Corridor Development project (EEC) 30

  32. Slide 32: Backlogs and Current Projects

    BACKLOGS AND CURRENT PROJECTS 31

  33. Slide 33: UNIQUE's Key Projects

    UNIQUE’s Key Projects Project Awarde Project Contract Projects Value Note d Year Owner Life (btbn) JV with Kajima Corporation The Industrial Ring Road, Contract 3 2002 1.2 DRR 2002 – 2006 and Tokyu Construction (48% UNIQ) The Ramintra Outer Bangkok Ring Road Expressway, Contract No. 2007 1.7 EXAT 20

  34. Slide 34: UNIQUE's Backlogs

    UNIQUE’s Backlogs Employers Value (btbn) Remaining (btbn) 1. The Construction of Mass Transit System Project in Bangkok (Red Line) (I) Contract 1: Civil Works for Bang Sue Grand Station and Depots SRT 37.30 3.72 2. Blue Line Extension Project Contract 3 : Elevated Civil Works Tao Pun - Tha Phra Sect

  35. Slide 35: UNIQUE's Backlogs

    Signed The Contract: UNIQUE’s Backlogs The Construction of Track Doubling Project Section: Lop Buri – Pak Nam Pho Signed The Contract: Contract 1: Ban Klab – The MRT Orange Line Khok Kathiam (East Section) Project, (Elevated Railway) 45 Thailand Cultural Contract 2: Tha Khae Centre - Min Buri – Pak

  36. Slide 36: Financials

    FINANCIALS 35

  37. Slide 37: Financial Statement (P/L) (Million Baht)

    Financial Statement (P/L) (Million Baht) 2014 % 2015 % 2016 % 2017 % 2018(3Q) % Revenue from construction 8,108.70 98.9 10,069.75 99 12,555.45 99.1 12,588.84 99.3 8,930.52 99.56 Total revenue 8,200.15 100 10,182.84 100 12,665.12 100 12,675.20 100.0 8,970.36 100.00 Total cost 6,635.35 80.9 8,274.85 8

  38. Slide 38: Financial Statement (B/S) (Million Baht)

    Financial Statement (B/S) (Million Baht) 2014 % 2015 % 2016 % 2017 % 2018(3Q) % Cash and Current Investment 960.8 5.5 330.79 1.74 754.93 3.2 268.54 1.0 936.68 3.19 A/R 4, 550.5 26.3 1,588.74 8.37 1,347.93 5.7 1,076.10 3.9 2,242.97 7.63 Total Assets 17,333.8 100 18,990.49 100 23,735.01 100 27,546.30

  39. Slide 39: Key Financial Graphs

    Key Financial Graphs Construction Revenue (btbn) Gross Profit (%) 14 25 12.5 12.5 12 20.6 10.9 19.1 19 19.5 20 17.5 10 8.9 8.1 15 8 6 10 4 5 2 0 0 2014 2015 2016 2017 2018(3Q) 2014 2015 2016 2017 2018(3Q) Construction Cost + SG&A (%) Net Profit (btmn) 90 1000 80.9 81.3 82.5 80.5 79.4 880.48 884.2 80

  40. Slide 40: Key Financial Graphs

    Key Financial Graphs Financial Cost (%) Net Gearing 6 1.20 1.14 1.04 4.89 5 1.00 0.86 0.81 4 3.8 0.80 0.74 3.6 3 3 3 0.60 2 0.40 1 0.20 0 0.00 2014 2015 2016 2017 2018(3Q) 2014 2015 2016 2017 2018(3Q) 39

  41. Slide 41: UNIQUE's Key Financial Ratios

    UNIQUE’s Key Financial Ratios Liquidity ratio 2014 2015 2016 2017 2018 (3Q) Unit Current ratio 1.2 1.24 1.20 1.17 1.17 Times Quick ratio 1.0 1.05 1.05 0.97 0.91 Times Account receivable turnover 1.1 1.0 0.91 0.78 0.70 Times Debt to equity ratio 2.1 1.9 2.43 2.78 2.93 Times Financial debt to equity r

  42. Slide 42: Experiences

    EXPERIENCES (3 UNIQUESaer, at

  43. Slide 43: The Industrial Ring Road (IRR)

    The Industrial Ring Road (IRR) 42

  44. Slide 44: The Industrial Ring Road (IRR)

    39 The Industrial Ring Road (IRR) 43

  45. Slide 45: SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan

    SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan 44

  46. Slide 46: SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan

    41 SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan 45

  47. Slide 47: MRT Blue Line Extension Project Contract 3

    MRT Blue Line Extension Project Contract 3: Elevated Civil Works Tao Pun – Tha Phra Section 46

  48. Slide 48: MRT Blue Line Extension Project Contract 3

    MRT Blue Line Extension Project Contract 3: Elevated Civil Works Tao Pun – Tha Phra Section 47

  49. Slide 49: Mass Transit System Project (Red line) Contract 1

    Construction of Mass Transit System Project in Bangkok (Red line) (I) Contract 1: Civil Works for Bang Sue Grand Station and Depots 48

  50. Slide 50: The MRT Green Line (North) Project

    The MRT Green Line (North) Project Mo Chit - Saphan Mai – Khu Khot Section Contract 2: Civil Works Saphan Mai – Khu Khot Section and Associated Relevant Utility Relocation Works 49

  51. Slide 51: Mae Ngat – Mae Kuang Diversion Tunnel Project (Contract 2)

    Mae Ngat – Mae Kuang Diversion Tunnel Project (Contract 2) 50

  52. Slide 52: Link Road Ratcha Phruek - Kanchanaphisek Road

    Link Road Ratcha Phruek - Kanchanaphisek Road (North –South) 51

  53. Slide 53: The MRT Orange Line (East Section) Contract 4

    The MRT Orange Line (East Section) Project, Thailand Cultural Centre - Min Buri (Suwinthawong) Contract 4: the Elevated Civil Works 52

  54. Slide 54: The MRT Orange Line (East Section) Contract 6

    The MRT Orange Line (East Section) Project, Thailand Cultural Centre - Min Buri (Suwinthawong) Contract 6: Trackwork 53

  55. Slide 55: Track Doubling Project Lop Buri – Pak Nam Pho Contract 1

    The Construction of Track Doubling Project Section: Lop Buri – Pak Nam Pho Contract 1: Ban Klab – Khok Kathiam (Elevated Railway) 54

  56. Slide 56: Track Doubling Project Lop Buri – Pak Nam Pho Contract 2

    The Construction of Track Doubling Project Section: Lop Buri – Pak Nam Pho Contract 2: Tha Khae – Pak Nam Pho 55

  57. Slide 57: Off Terminal Check-in Building at Phuket International Airport

    The Off Terminal Check-in Building at Phuket International Airport 56

  58. Slide 58: Junction between the BRT and BTS station

    Construction the junction between the BRT and BTS station (Sathorn Road – Narathiwat Intersection) 57

  59. Slide 59: Ramintra Outer Bangkok Ring Road Expressway, Contract 1 & 2

    The Ramintra Outer Bangkok Ring Road Expressway, Contract No. 1 & 2 58

  60. Slide 60: Ramintra Outer Bangkok Ring Road Expressway, Contract 1 & 2

    The Ramintra Outer Bangkok Ring Road Expressway, Contract No. 1 & 2 59

  61. Slide 61: Highway Route No.302 Bridge Over Chao Phraya River

    Highway Route No.302 (RATANATHIBETH) Section : Bridge Over Chao Phraya River 60

  62. Slide 62: Highway Route No.302 Bridge Over Chao Phraya River

    Highway Route No.302 (RATANATHIBETH) Section : Bridge Over Chao Phraya River 61

  63. Slide 63: Facilities and Machineries

    Facilities and Machineries 62

  64. Slide 64: Technologies & Facilities: Precast Segment Yard

    UNIQUE’s Technologies & Facilities Precast Segment Yard 63

  65. Slide 65: Technologies & Facilities: Heavy Machinery

    UNIQUE’s Technologies & Facilities Heavy Machinery 64

  66. Slide 66: Technologies & Facilities: Bored Pile Machines

    UNIQUE’s Technologies & Facilities Bored Pile Machines 65

  67. Slide 67: Technologies & Facilities: Steel Works

    UNIQUE’s Technologies & Facilities Steel Works 66

  68. Slide 68: Engineering and Construction Public Company Limited

    . ra ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED

Unique Engineering and Construction Public Company — Investor Presentation (November 2018) on 6ix