Clara Resources Australia — Shareholder Meeting (November 2023)
18 slides from Clara Resources Australia's shareholder meeting presentation, Nov 27, 2023
Slide 1: Update, Annual General Meeting
UPDATE, ANNUAL GENERAL MEETING 27/11/23 PETER WESTERHUIS CEO C7A 2023 AGM UPDATE 1
Slide 2: Clara Resources Australia is an ASX-Listed Exploration & Development Company
Clara Resources Australia is an Australian ASX-Listed Exploration & Development Company with multi-commodity Projects Brian Moller Capital Structure Non-Executive Director & Chairman Solicitor with 30+ yrs experience in capital raising, mergers and Price @ 22/11/23 ($) 0.024 acquisitions. Total Shar
Slide 3: Developing Resources Critical to Global Economic Growth & Electrification
Clara (ASX: C7A) is Developing Resources Critical to Global Economic Growth & Electrification Kildanga Ni-Co Project - QLD Resource definition & development of Kildanga Ni & Co resource. • Greenfield project in Brownfield location • Established service centre (Gympie) nearby • Existing sealed roads
Slide 4: Ashford Coking Coal Project
ASHFORD COKING COAL PROJECT Potential to produce quality coking coal sought by global steelmakers 4
Slide 5: Coking Coal Market
Coking Coal Market Australian Export Coking Coal Outlook Proximity to Asian markets supports future demand Energy transition driving steel & coking coal demand Blast furnace iron making unlikely to be displaced for some time Coking coal supply side characterised by: Progressive exit of major
Slide 6: Location & Tenements Ashford Coking Coal Project
Location & Tenements Ashford Coking Coal Project Clara owns 40% of Project JORC Resource • Option to purchase balance 60% from Savannah • 14.8Mt, limited to EL6234 Goldfields • Drilling plan to provide more data on coal quality specifications & washability • Adjacent EL6428, potential to upscale res
Slide 7: Ashford will be a conventional Open Cut Mine
Ashford will be a conventional Open Cut Mine utilizing proven technology & mining methods Greenfields Project in Brownfields Approvals Process Location • Environmental permits & consents required before • Mined from 1954 to 1989 supplying coal to conversion to a mining lease, via a well-defined the
Slide 8: Mine Plan
Mine Plan, 6 months Mine Plan, 10 years C7A 2023 AGM UPDATE 8
Slide 9: The ARTC Inland Rail Project Creates an Efficient Route to Market
The ARTC Inland Rail Project Creates an Efficient Route to Market Changes operability & economics of North project Star Ashford Mine located ~100km of new rail line Train loading facilities to be established North Star preferred location HV Connect to HV rail network Network Newcastle C7A 2023
Slide 10: Truck Routes
Truck Routes Production • 750Kt/annum • 15Kt/week • 40 to 60 trucks/day 10
Slide 11: Train Loading Facility
Train Loading Facility C7A 2023 AGM UPDATE 11
Slide 12: Current priority is release of the Project Scoping Study
Current priority is release of the PROJECT SCOPING STUDY Environment & Permitting Road Transport • EIS Process • Trucking route options • Envl management advisors • Train load out location • Statutory approvals • Truck configurations & costs • Social impact assessment Geology Train Loading JORC re
Slide 13: Ashford Coking Coal Project – Project Milestones
Ashford Coking Coal Project – Project Milestones PROJECT MILESTONE SCHEDULE 3 months 6 9 12 15 18 21 24 27 30 33 36 39 42 45 PFS Drilling Program Pre-Feasibility Study Environmental Baseline Studies EIS Preparation, submit Approval Process Prodution Drilling Program Feasibility Study Env Authorities
Slide 14: Kildanga Nickel-Cobalt Project
KILDANGA Nickel – Cobalt Project Potential opportunity to delineate a regional Ni-Co Resource to support a 2 to 3Mtpa ROM operation 14
Slide 15: Increasing Supply-Demand Gap in Battery Minerals
Increasing Supply-Demand Gap in Battery Minerals COBALT NICKEL Proliferation of Li-ion batteries is driving Co demand Massive raw material supply shortages predicted DRC produces 70% of Co ores China dominates Li-ion supply chain Co raw material supply shortages predicted ESG policies su
Slide 16: Nickel & Cobalt Critical Minerals for the Energy Transition
Nickel & Cobalt Critical Minerals for the Energy Transition Kilkivan area contains one of Qld’s earliest gold discoveries, hosts rich polymetallic mineralisation More than 100 historic mining leases in the area, dating back to 19th century (Tablelands, Commercial Reef, New Zealand, Black Snake,
Slide 17: Kildanga | Identify Substantial Regional Target
KILDANGA | Identify Substantial Regional Target Work Program: Broaden previous exploration programs to target significant Ni-Co resource, supporting a 2 to 3Mtpa ROM operation Preliminary assessment of ore concentrator and location options Determine route to market & transport options, noting
Slide 18: Cautionary Statement
Forward Looking Statements Cautionary Statement This presentation may contain statements and projections provided by or on behalf of Clara Resources Australia Limited (Clara Resources Australia) with respect to the anticipated future undertakings. These forward-looking statements reflect various ass