Strike Resources Limited · ASX:SRK

Strike Resources — Investor Presentation (March 2006)

25 slides from Strike Resources's investor presentation, Mar 28, 2006

  1. Slide 1: Market Announcement: Uranium Update

    Slide 1: Market Announcement: Uranium Update

    Tuesday, 28 March 2006 MARKET ANNOUNCEMENT Uranium Update Please find attached a presentation to brokers on the Uranium Projects of the Company. For further information: Shanker Madan Managing Director T | (08) 9214 9700 E | smadan@strikeresources.com.au www.strikeresources.com.au STRIKE RESOURCES L

  2. Slide 2: Uranium Update

    Slide 2: Uranium Update

    STRIKE SOURCES LIMITED eaerture Update

  3. Slide 3: Portfolio of Uranium Projects

    Slide 3: Portfolio of Uranium Projects

    Portfolio of Uranium Projects z Northern Territory - Key tenement (ELA 24879) adjacent to and approx 5km south of Bigrilyi deposit stated by Energy Metals as a non JORC resource of 808,000 tonnes of U3O8 @ 3.4 kg/tonne (1) - 5 ELA’s in total covering approx 1666 sq km (1) Source: Energy Metals Ltd M

  4. Slide 4: Portfolio of Uranium Projects

    Slide 4: Portfolio of Uranium Projects

    Portfolio of Uranium Projects z Western Australia - Key tenement the main focus of uranium exploration by AGIP in the 1970s. - Previous drilling results in tenement included up to 0.14%U or equivalent 0.17% U3O8 as uraninite in core holes 28-Mar-06 3

  5. Slide 5: Australian Projects

    Slide 5: Australian Projects

    Australian Projects 28-Mar-06 4

  6. Slide 6: Uranium – Northern Territory

    Slide 6: Uranium – Northern Territory

    Uranium – Northern Territory NT Advantage z Most friendly uranium region in Australia z Federal government has taken conduct of uranium policy for the territory z Federal government sympathetic to expansion of uranium mining beyond the 3 mines policy 28-Mar-06 5

  7. Slide 7: Uranium – Northern Territory: Bigrlyi South

    Slide 7: Uranium – Northern Territory: Bigrlyi South

    Uranium – Northern Territory Bigrlyi South z Strike is earning a 75% interest in 5 tenements covering 1666 sq km. z ELA 24879 is a key Strike tenement which is approximately 5km south of Bigrlyi uranium deposit stated by Energy Metals as a non JORC resource of 808,000 tonnes of U3O8 @ 3.4 kg/tonne (

  8. Slide 8: Uranium – Northern Territory: Bigrlyi South

    Slide 8: Uranium – Northern Territory: Bigrlyi South

    Uranium – Northern Territory Bigrlyi South z Strike’s tenements cover the same stratigraphic sequence of Mt Eclipse Sandstone in the Ngalia Basin – 390 km northwest of Alice Springs z 3 known but untested uranium anomalies lie within ELA 24879 and 1 within ELA 24927 28-Mar-06 7

  9. Slide 9: Energy Metals and Strike Resources

    Slide 9: Energy Metals and Strike Resources

    Energy Metals and Strike Resources z Energy Metals (EME) and Strike (SRK) share common boundary at EME ‘s Bigrlyi ELA 24453 z SRK key tenement (ELA 24879) lies approx 5km south of EME’s Bigrlyi uranium deposit z SRK ELA’s 24927,24928, 24929 and 24879 completely surround EME’s stated strategic uraniu

  10. Slide 10: Energy Metals and Strike Resources

    Slide 10: Energy Metals and Strike Resources

    Energy Metals and Strike Resources 28-Mar-06 9

  11. Slide 11: Bigrlyi South Tenement Geology

    Slide 11: Bigrlyi South Tenement Geology

    Bigrlyi South Tenement Geology Uranium mineralisation at Bigrlyi is likely to be repeated at Bigrlyi South because : • Proximity to known mineralisation – Bigrlyi South is 5 km south, in adjoining tenement to Bigrlyi • Tenements in the path of north-south flow regime of uranium- bearing fluids • Per

  12. Slide 12: Bigrlyi South Tenement Geology

    Slide 12: Bigrlyi South Tenement Geology

    Bigrlyi South Tenement Geology 28-Mar-06 11

  13. Slide 13: Bigrlyi South Tenement Status

    Slide 13: Bigrlyi South Tenement Status

    Bigrlyi South Tenement Status z 5 Tenements (ELA’s) at application stage z 4 Tenements including key tenement on pastoral lease z 1 tenement on Aboriginal free hold land z Pastoral lease tenements (incl key tenement) advertised as “acts which attract the expedited procedure” under the Native Title A

  14. Slide 14: Bigrlyi South: Moving Forward

    Slide 14: Bigrlyi South: Moving Forward

    Bigrlyi South : Moving Forward z Exploration Target - Delineate primary mineralisation along existing thrust faults z Exploration Strategy - Fly low level, high resolution radiometric survey - Identify known anomalies - Sample water bores - Follow up anomalies with ground surveys - Drill identified

  15. Slide 15: Uranium – Western Australia

    Slide 15: Uranium – Western Australia

    Uranium – Western Australia Mt James Project – Gascoyne Region • Tenements cover a large portion of extinguished TR 5963H which was the main focus of uranium exploration by AGIP in the 1970s. • Previous drilling by AGIP in SRK tenement included intersections of up to 0.14% U or equivalent of 0.17% U

  16. Slide 16: Mt James Project – Gascoyne

    Slide 16: Mt James Project – Gascoyne

    Mt James Project – Gascoyne • Carnotite discovered by AGIP in shallow trenches and shallow RAB holes in the deeply weathered Tertiary regolith on drainage divides. • 12 untested radiometric uranium anomalies within tenements also identified but have not been followed up. 28-Mar-06 15

  17. Slide 17: Mt James Project – Gascoyne Region

    Slide 17: Mt James Project – Gascoyne Region

    Mt James Project – Gascoyne Region 28-Mar-06 16

  18. Slide 18: Mt James Tenement Status

    Slide 18: Mt James Tenement Status

    Mt James Tenement Status z 1 Tenement granted (E09/1245) . This tenement is regarded as a key WA uranium tenement z 3 Tenements (ELA’s) at application stage z ELA’s are in the expedited native title process z Standard Heritage Agreements executed z Objection period for tenements expire June 2006 28-

  19. Slide 19: Mt James: Moving Forward

    Slide 19: Mt James: Moving Forward

    Mt James : Moving Forward z Exploration Target • Shallow carnotite mineralisation in the weathered surface on drainage divides • Deeper uraninite mineralisation in pegmatitic veins in the gneissic rocks – vein type deposits 28-Mar-06 18

  20. Slide 20: Mt James: Moving Forward

    Slide 20: Mt James: Moving Forward

    Mt James : Moving Forward z Exploration Strategy • Follow up known uranium intersections and untested anomalies with drilling • Conduct ground radiometric surveys, followed by drilling for carnotite mineralisation 28-Mar-06 19

  21. Slide 21: Mt Lawrence Wells Project - Wiluna

    Slide 21: Mt Lawrence Wells Project - Wiluna

    Mt Lawrence Wells Project-Wiluna 28-Mar-06 20

  22. Slide 22: Mt Lawrence Wells Project - Wiluna

    Slide 22: Mt Lawrence Wells Project - Wiluna

    Mt Lawrence Wells Project - Wiluna Exploration Model • The nearby Lakeway deposit with 3,695 tonnes of contained uranium metal as carnotite in calcrete and coatings on bedding planes of rock fragments in alluvial gravels • Uranium derived from granite and Proterozoic sediments may have deposited ura

  23. Slide 23: Mt Lawrence Wells - Tenement Status

    Slide 23: Mt Lawrence Wells - Tenement Status

    Mt Lawrence Wells - Tenement Status z 1 Tenement granted (E53/1115) ,1 tenement (ELA) at application stage z 2 Tenements including key tenement on pastoral lease land z ELA is in the expedited native title process z Standard Heritage Agreement executed z Objection period for tenement expires June 20

  24. Slide 24: Mt Lawrence Wells: Moving Forward

    Slide 24: Mt Lawrence Wells: Moving Forward

    Mt Lawrence Wells : Moving Forward z Exploration Target • Palaeo drainage feeding into Lake Hinkler with Hinkler, Centipede and Millipede uranium occurrences z Exploration Strategy • Follow the drainage channels with ground radiometric surveys • Follow anomalies by RAB drilling 28-Mar-06 23

  25. Slide 25: Thank You

    Slide 25: Thank You

    THANK YOU The information in this presentation that relates to exploration results has been compiled by Mr Hem Shanker Madan who is a Member of The Australian Institute of Mining and Metallurgy. Mr Madan is the Managing Director of the Company. Mr Madan has in excess of 5 years experience which is r

Source: Internet Archive copy of strikeresources.com.au

More decks from Strike Resources Limited

All 37 Strike Resources decks