Western Copper And Gold Corporation · TSX:WRN

Western Copper And Gold — Investor Presentation (September 2021)

42 slides from Western Copper And Gold's investor presentation, September 2021

  1. Slide 1: September 2021 – Corporate Presentation

    SEPTEMBER 2021 – CORPORATE PRESENTATION TSX : WRN I NYSE AMERICAN : WRN

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning Western Copper and Gold Corporation and its subsidiaries (collectively, the “Company”). This document should be read in conjunction with al

  3. Slide 3: Clean and Tightly-Held Ownership Structure

    CLEAN AND TIGHTLY-HELD OWNERSHIP STRUCTURE TRADING Toronto Stock Exchange, NYSE American WRN CASH POSITION Cash & Short Term Investments C$ 57.7 million June 30, 2021 (*pro-forma) *Includes proceeds from July 2021 private placement Short/Long Term Debt $Nil SHARE STRUCTURE Share Price C$ 2.16 August

  4. Slide 4: Rio Tinto Strategic Investment

    RIO TINTO STRATEGIC INVESTMENT Rio’s investment provides opportunity for Rio to gain a better understanding of Casino, with a focus on technical, regulatory, and community aspects of the project. SCOPE OF WORK ▪ Defined and performed in partnership with Rio, including work to examine resource, metal

  5. Slide 5: WRN and the Casino Deposit

    WRN AND THE CASINO DEPOSIT ALASKA YUKON SIGNIFICANT COPPER-GOLD PROJECT ✓ One of the largest copper-gold projects in Canada CASINO PROJECT ✓ New PEA shows robust economics and long life Whitehorse ✓ Strategic investment from Rio Tinto strengthens credibility Skagway LOCATED IN THE RIGHT PLACE ✓ Yuko

  6. Slide 6: An Attractive Copper or Gold Mine

    AN ATTRACTIVE COPPER OR GOLD MINE CONTAINED METAL VALUE DISTRIBUTION IN SILVER THE M&I MILL RESOURCE 4% MOLY 18% GOLD GOLD 14.5 Million oz M+I Resources 38% + 6.6 Million oz Inferred Resources COPPER COPPER 7.6 Billion lbs M+I Resources + 3.3 Billion lbs of Inferred Resources 41% Source: Casino 2021

  7. Slide 7: Significant Copper Deposit

    SIGNIFICANT COPPER DEPOSIT 30 40 35 25 Copper Equivalent (B lbs) 30 20 Copper (B lbs) 25 15 20 15 10 10 5 5 0 0 Cascabel Casino Josemaria Rosemont Filo Del Sol Arctic Cascabel Casino Josemaria Rosemont Filo Del Sol Arctic (SOL) (WRN) (JOSE) (HBM) (FIL) (TMQ) (SOL) (WRN) (JOSE) (HBM) (FIL) (TMQ) ■ Me

  8. Slide 8: Significant Gold Deposit

    SIGNIFICANT GOLD DEPOSIT ■ Measured & Indicated Resources ■ Inferred Resources Notes: Peer group data as per latest company documents and public files. See “Notes” in Appendix for equivalent calculations. No discount for metallurgical recovery. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Pre

  9. Slide 9: The Casino Project

    & western COPPER AND GOLD THE CASINO PROJECT

  10. Slide 10: Western Copper and Gold Casino PEA Summary

    WESTERN COPPER AND GOLD CASINO PEA SUMMARY Phase I (0-25 years) Phase I + II Metal Prices Cu: US$3.35/lb Au: US$1,600/oz (0-47 years) NPV After-tax (8%) IRR After-tax Mine Life $2.33 Billion 19.5% 47 Years Strip Ratio Payback LOM Cash Flow After-tax LOM 0.38:1 3 Years $12 Billion Note: Based on Casi

  11. Slide 11: What Is New – 2021 PEA

    WHAT IS NEW – 2021 PEA UPDATED RESOURCE (released July 2020): ▪ M&I used for mill and heap leach feed ▪ Inferred material in the pit considered waste HEAP LEACH GOLD RECOVERY: ▪ Potential gold recovery from heap leach increased to 70% based on new column testing on various lithology samples ACCESS R

  12. Slide 12: Proposed Tailings Design

    PROPOSED TAILINGS DESIGN Tailings Facility Redesign - Reduced Risk, Reduced Environmental Impact and Improved Safety ▪ Redesign incorporates the outcomes of the BATT study – a collaboration with First Nations, YESAB and Yukon government ▪ Substantial reduction in the quantity of free-standing water

  13. Slide 13: Casino Deposit

    CASINO DEPOSIT Core Zone: Heap Leach Resource: 800 m X 500 m zone 217 Million Tonnes @ 0.27 g/t AuEq (M&I) Grades significantly higher than overall resource grade 31 Million Tonnes @ 0.18 g/t AuEq (Inferred) Phase I Pit Phase II Pit Mill Resource: >0.50% CuEq 2.17 Billion Tonnes @ 0.36% CuEq (M&I) 0

  14. Slide 14: Good Grade

    GOOD GRADE GRADES IN LINE WITH PEERS: Casino Mill Yr 1-4 (173 Mt) Casino Mill Phase I (1.1 Bt) CASINO Casino Mill Phase I + II (2.1 Bt) Operating Mine Average Copper Mountain - CMMC (466 Mt) Gibraltar - TKO (511 Mt) Highland Valley - TCK (329 Mt) PEERS Developing Mine Average Mt. Milligan - CG (191

  15. Slide 15: Early Production Significant Contributor to Project Economics

    EARLY PRODUCTION SIGNIFICANT CONTRIBUTOR TO PROJECT ECONOMICS Years 1-4 Life of Mine Average annual cash flow (pre-tax) (C$ M) 1,081 645 Average annual cash flow (after-tax) (C$ M) 965 487 Net Smelter Return ($/t ore milled) 41.92 28.14 Operating Cost ($/t ore milled) 9.84 9.84 Average Annual Metal

  16. Slide 16: Economic Throughout the Commodity Cycle

    ECONOMIC THROUGHOUT THE COMMODITY CYCLE Copper Price ($US) $2.50 $3.00 $3.35 $4.00 $4.50 $5.00 $5.50 NPV 8% (C$M) $654 $1,209 $1,597 $2,309 $2,857 $3,405 $3,952 $1,200 IRR % 11.6% 14.4% 16.1% 19.1% 21.2% 23.3% 25.2% Payback (yrs) 4.8 3.9 3.5 3.0 2.8 2.6 2.4 NPV 8% (C$M) $1,028 $1,581 $1,965 $2,677 $

  17. Slide 17: Preliminary Economic Assessment – June 2021

    PRELIMINARY ECONOMIC ASSESSMENT – JUNE 2021 PROJECTED CAPITAL COSTS PROCESS PLANT & INFRASTRUCTURE $ Millions Project Directs (including freight) $1,777 Project Indirects $390 Contingency $412 Subtotal Process Plant & Infrastructure $2,579 MINE COSTS Mine Equipment $409 Mine Preproduction $211 Subto

  18. Slide 18: Low Cash Costs

    LOW CASH COSTS • C1 cash costs of negative $1.13/lb copper produced (net of by-products) • Cash costs one of the lowest of any project being developed Note: Based on Casino 2021 PEA. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 18

  19. Slide 19: Second Phase Development

    SECOND PHASE DEVELOPMENT Phase I Phase I + II Development Development Sustaining Capital $719 million $1,808 million Total LOM Capital $3.97 billion $5.01 billion LOM pre-tax free cash flow $13.0 billion $17.2 billion LOM after-tax free cash flow $9.0 billion $12.0 billion Total mineralized material

  20. Slide 20: Enterprise Value/Project NPV Benchmarking

    ENTERPRISE VALUE/PROJECT NPV (STUDY) BENCHMARKING ▪ WRN trades at 0.12x NPV, a significant discount to its peers ▪ Undervalued against peers, trading at low end of peer valuation 2.31x Feasibility Pre-Feasibility 0.70x 0.66x 0.60x PEA 0.49x 0.46x WRN 0.42x 0.33x 0.31x 0.20x 0.19x 0.15x 0.12x 0.10x 0

  21. Slide 21: Enterprise Value/Copper Equivalent Resource Benchmarking

    Sandfire Res. Am. ¢20.4 (Black Butte) Marimaca ¢18.0 (Marimaca) Filo Mining ¢11.4 (Filo del Sol) Trilogy Metals ¢6.5 (Arctic) TSX : WRN I NYSE AMERICAN : WRN Nevada Copper ¢6.2 (Pumpkin Hollow) Kutcho Copper (Kutcho) ¢3.6 Source: RBC, Bloomberg, S&P Capital IQ and company disclosure. SolGold ¢2.9 (C

  22. Slide 22: Casino Access Road Funding Secured

    CASINO ACCESS ROAD FUNDING SECURED ▪ $130 million funding committed from Governments for the Casino Access Road ▪ Initial portion of road through EA process – expect construction this year ▪ Agreements with FN’s on key aspects of remaining road reached ▪ Construction bids out for tender, expected to

  23. Slide 23: Casino Infrastructure

    CASINO INFRASTRUCTURE POWER • Power to be supplied by 3 gas turbine driven generators for a combined installed capacity of > 200 MW • LNG trucked from Ft. Nelson • MOU signed with Ferus Natural Gas Fuels Inc. (Ferus) to supply the fuel at Ft. Nelson • Ferus currently supplying Whitehorse power plant

  24. Slide 24: 2021 Exploration and Drilling Program

    2021 EXPLORATION AND DRILLING PROGRAM Program developed and executed in partnership with Rio Tinto ▪ Exploration: ~5,000 m in 12 holes on the Casino Deposit and targets within Canadian Creek property ▪ Metallurgical drilling to test amenability of the mineralization to mineral processing ▪ Geotechni

  25. Slide 25: Located in the Right Place

    western COPPER AND GOLD = LOCATED IN THE RIGHT PLACE

  26. Slide 26: Yukon – A Storied and Modern Record of Mining

    YUKON – A STORIED AND MODERN RECORD OF MINING TIER 1 JURISDICTION ✓ Mining territory in Canada STRONG GOVERNMENT SUPPORT ✓ Funding for marketing and access road STRAIGHTFORWARD PERMITTING ✓ Single assessment agency ✓ Several initiatives underway to streamline processes ACTIVE MINING DISTRICT ✓ 3 min

  27. Slide 27: ESG Commitment

    ESG COMMITMENT SOCIAL ENVIRONMENTAL GOVERNANCE Committed to health and safety Committed to exceeding best Committed to high ethical and committed to the protection of practices in protecting the standards and building long term cultural values environment value ✓ Ongoing Engagement with Local ✓ Acce

  28. Slide 28: Key Asset in an Emerging New Gold District

    KEY ASSET IN AN EMERGING NEW GOLD DISTRICT ✓ Major miners in area – Rio Tinto, Newmont, Agnico-Eagle, Kinross, and others ✓ ~ 30 million ounces of gold in district* ✓ Significant exploration upside WHITE GOLD ✓ Government commitment to fund access to area ✓ 2 Projects in permitting ✓ Community and F

  29. Slide 29: Investment Highlights and Path Forward

    INVESTMENT HIGHLIGHTS AND PATH FORWARD CASINO PROJECT ALREADY TICKS MANY OF THE BOXES: ✓ Significant copper and gold project ✓ Yukon – an emerging mining district ✓ Clear path to unlock value STEADY PROGRESS: ✓ 2018: Tailings alternatives study completed ✓ 2019: Infill drilling campaign completed ✓

  30. Slide 30: Analyst Coverage

    ANALYST COVERAGE CORMARK SECURITIES ROTH CAPITAL PARTNERS H.C. WAINWRIGHT & CO. Stefan Ioannou Matthew Farwell Heiko F. Ihle, CFA Tel: (416) 943-4222 Tel: (949) 720-7108 Tel: (212) 356 - 0500 TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 30

  31. Slide 31: Appendix

    & western COPPER AND GOLD

  32. Slide 32: Key Management Team with Successful Track Record

    KEY MANAGEMENT TEAM WITH SUCCESSFUL TRACK RECORD Paul West-Sells, PhD Varun Prasad, CPA, CGA Cameron Brown, P.Eng Ken Williamson, B.A.Sc., MBA, P.Eng President & CEO CFO VP Engineering Director & Interim Chairman Metallurgical Engineer with significant Professional Accountant, with extensive Formerl

  33. Slide 33: Board of Directors

    BOARD OF DIRECTORS Ken WIlliamson, Former investment banker. Mr. Williamson has served on the boards of Eicon Technology Corporation, Glamis B.A.Sc., MBA, P.Eng Gold Ltd., BioteQ Environmental Technologies Inc., Uranium One Inc., BlackRock Ventures Inc., Quadra FNX Director & Interim Chair Mining Lt

  34. Slide 34: Operating Cost

    OPERATING COST ($/tonne) MILLING Milling $5.72 OPERATION Mining $3.66 General & Administrative $0.45 Total $9.84 ($/tonne) HEAP LEACH Heap Leach Operation $1.30 OPERATION ADR/SART $4.67 Total $5.98 Note: Based on Casino 2021 PEA. See “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Developing Ca

  35. Slide 35: ANA and Casino B

    ANA AND CASINO B Note: See “Notes” in Appendix TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 35

  36. Slide 36: Deeper Porphyry Targets

    DEEPER PORPHYRY TARGETS Current deposit outline • Additional geophysical targets identified at depth Chargeability @ 67 ms MT @ 66 mS Source: Witherly, Ken, “New Riches from Old Data; a Re-evaluation of Legacy Data from the Casino Deposit, Yukon, AME Roundup, January 25, 2018 TSX : WRN I NYSE AMERIC

  37. Slide 37: Excellent Concentrate Quality

    EXCELLENT CONCENTRATE QUALITY Copper Concentrate Molybdenum Concentrate Element Avg Value Unit Element Avg Value Unit Copper 28 % Molybdenum 57.4 % Gold 25 g/t Copper 0.39 % Silver 120 g/t Rhenium 133.5 g/t Molybdenum 0.05 % Iron 0.8 % Iron 26 % Sulphur 37.9 % Sulphur 36 % Arsenic 1659 g/t Arsenic 2

  38. Slide 38: 2020 Resource

    2020 RESOURCE Mill Resource ($5.70/t NSR cut-off) Tonnes Copper Gold Moly Silver CuEq Copper Gold Moly Silver Class M (%) (g/t) (%) (g/t) (%) (M lb) (M oz) (M lb) (M oz) Measured 145.3 0.31 0.40 0.025 2.1 0.74 986 1.9 80.6 9.8 Indicated 2,028.0 0.14 0.17 0.016 1.4 0.33 6,448 10.9 731.0 90.4 M+I 2,17

  39. Slide 39: 2020 Resource

    2020 RESOURCE Heap Leach Resource ($5.46/t NSR cut-off) Tonnes Copper Gold Silver AuEq Copper Gold Silver Class M (%) (g/t) (g/t) (g/t) (M lb) (M oz) (M oz) Measured 37.2 0.05 0.45 2.8 0.48 39.3 0.5 3.3 Indicated 180.2 0.03 0.21 1.7 0.23 127.2 1.2 10.0 M+I 217.4 0.03 0.25 1.9 0.27 166.5 1.8 13.3 Inf

  40. Slide 40: Notes

    NOTES “Casino PEA”: • Technical report entitled “Casino Project, Form 43-101F1 Technical Report Preliminary Economic Assessment, Yukon, Canada" dated June 22, 2021, a copy of which is available on the Company's website at www.westerncopperandgold.com. • Prepared by Prepared by: Daniel Roth, PE, P.En

  41. Slide 41: Notes

    NOTES Other technical information in this presentation: • Technical information regarding the Casino Project contained in this presentation is based on the Casino 2021 PEA prepared by or under the supervision of the Qualified Persons noted previously. • Copper equivalent calculations in this present

  42. Slide 42: Contact: westerncopperandgold.com

    WWW.WESTERNCOPPERANDGOLD.COM INFO@WESTERNCOPPERANDGOLD.COM 604 684 9497

Western Copper and Gold — Investor Presentation (September 2021) on 6ix