Element 25 Limited · ASX:E25

Element 25 — Investor Presentation (January 2022)

20 slides from Element 25's investor presentation, January 2022

  1. Slide 1: Element 25 Limited Investor Update

    Element 25 Limited Investor Update Building a world-class Zero Carbon Manganese business January 2022 – Battery Grade High Purity Manganese Sulphate Scoping Study

  2. Slide 2: Introduction

    Introduction Disclaimer Overview This presentation contains only a brief overview of Element 25 Limited and its Developing the world class Butcherbird Manganese Project in Western associated entities (“Element 25") and their respective activities and operations. The Australia to produce high quality

  3. Slide 3: Our Strategic Vision

    Our Strategic Vision… Stage 1 Stage 2 Stage 3 Stage 4 365Kt per annum 1 Mt per annum High Purity Mn MnSO4 Expansion In production, optimising Engineering optimisation FS study scheduled Long term - multiple process in progress, startup 2022 for completion 2022 HPMSM modules globally Delivered 1 year

  4. Slide 4: Not all manganese is created equal

    Not all manganese is created equal E25 Manganese Serving the Established… And the Emerging… • Manganese (Mn) is the fourth most used metal • The electrification of the global vehicle fleet on earth in terms of tonnage. requires vast amounts of cathode materials. • Used in steel, specialty alloys and

  5. Slide 5: Great infrastructure endowment, fully permitted

    Great infrastructure endowment, fully permitted 100% E25 owned, long Extensive Exploration Tenure term tenure. E52/2350 M52/1074 Granted Mining Lease Measured & Indicated Resources are the basis Simple Logistics for the 42-year Base Case -5-

  6. Slide 6: Very simple geology equals low-cost, low environmental impact manganese units

    Very simple geology equals low-cost, low environmental impact manganese units Classification Tonnes (Mt) Mn (%) Contained Mn (Mt) RESOURCE GROWTH POTENTIAL Resource 263 10.0 20.8 • Enough resource base for multi- Reserve 50.6 10.3 5.22 decade long expansion pathway. • Can produce concentrate, batter

  7. Slide 7: Stage 1: Project Delivery Complete – Engineering Optimisation Progressing

    Stage 1: Project Delivery Complete – Engineering Optimisation Progressing Process Water Storage Tails Storage ROM Stocks Main Access Road Ore Stockpiles Feedstock for HPMSM conversion Processing Plant -7-

  8. Slide 8: New Energy Vehicle (NEV) Demand Growing MUCH Faster

    New Energy Vehicle (NEV) Demand Growing MUCH Faster 58% by 2040 percentage of new vehicles that will be EV or hybrid 54 million EV passenger sales by 2040 from 2033 decline emissions from road transport 17.6M by 2040 barrels of oil displaced by EVs each day Mn Mn “It is reasonably straight forward t

  9. Slide 9: If not manganese, then what?

    If not manganese, then what? Global mined cobalt output (Kt) • Manganese is the cheapest, most 58% by 2040 abundant of the NMC cathode percentage of new vehicles that will be EV or hybrid 54 million materials (Ni,Mn,C). EV passenger sales • Nickel and cobalt have supply by 2040 constraints, manganes

  10. Slide 10: If not manganese, then what?

    If not manganese, then what? • OEMs including VW, Tesla and Stellantis have announced moves to high manganese cathodes. • High manganese means better energy density and lower cost. • Transition will require large volumes of high purity manganese sulphate (HPMSM). • Some analyst estimates predict a d

  11. Slide 11: Our Goal – Zero Carbon High Purity Manganese

    Our Goal – Zero Carbon High Purity Manganese… Stage 1 First production of manganese concentrate to sell to manganese alloy manufacturers Multi-stage growth Stage 2 potential Expansion of the concentrate production to produce manganese feedstock to convert to MnSO4 Stage 3 Establishing a conversion f

  12. Slide 12: Low cost, efficient HPMSM process – significant improvements

    Low cost, efficient HPMSM process – significant improvements… Current Manganese Concentrate Processing Technologies • Leach - sulphuric acid leach of African/Local carbonate ores or roast reduction. • Purification – fluoride and/or sulphide reagents (waste) Problems with Current Technologies Large v

  13. Slide 13: Conversion of concentrate to HPMSM – Scoping Study delivered

    Conversion of concentrate to HPMSM – EV fuel, Scoping Study delivered… • Compelling economics. • • Modular, multi-stage growth strategy. Volumes tailored to demand growth. MnSO4 Mn25 Mn25 • Development strategy flexibility. 50,000 t/a A$1.52 billion 47% expanding to 150ktpa over NPV8 post-tax IRR pr

  14. Slide 14: Stage 3 Processing Location Optionality – Multiple Plant Potential

    Stage 3 Processing Location Optionality – Multiple Plant Potential EU US KR Mn Concentrate Feedstock (33% Mn): Up to 1M tonnes per annum manganese concentrate production planned at the Butcherbird Project in Western Australia. MY Multiple conversion facility location • E25 manganese concentrate is a

  15. Slide 15: Our Journey – Element 25 has a well advanced flowsheet and business strategy

    Our Journey – Element 25 has a well advanced flowsheet and business strategy… 2012 2017 2019 2020 Resource Defined First Leach Tests EMM Produced PFS Delivery 263 Mt @ 10% Mn showed rapid selective >99.9% pure metal early cashflow opportunity extraction 2021 2021/22 2022 2024/25 Operational MnSO4 Fo

  16. Slide 16: Zero Carbon Manganese – ESG considerations integral to our thinking

    Zero Carbon Manganese™ – ESG considerations integral to our thinking Sustainable extraction Sustainable Extraction Renewable energy Low-carbon processing Fuel cell haulage Carbon offsets Zero Carbon Manganese™ Renewable Energy Other potential pathways that Element 25 is investigating: Powered Proces

  17. Slide 17: Our Strategic Vision

    Our Strategic Vision… Stage 1 Stage 2 Stage 3 Stage 4 365Kt per annum 1 Mt per annum High Purity Mn MnSO4 Expansion In production, optimising Engineering optimisation FS study scheduled Long term - multiple process in progress, startup 2022 for completion 2022 HPMSM modules globally Delivered 1 year

  18. Slide 18: Thank you

    Thank you For more information, please contact Element 25 Limited: +61 8 6315 1400 admin@e25.com.au www.element25.com.au

  19. Slide 19: Reserves and Resources

    Reserves and Resources Maiden Ore Reserve1 Category Tonnes (Mt) Mn (%) Contained Mn (Mt) • 89% conversion of measured Proved 14.4 11.5 1.65 and indicated resources to Probable 36.2 9.8 3.56 reserve. Total 50.6 10.3 5.22 • Maiden Reserve only exploits Global Mineral Resource2 approximately 20% of glo

  20. Slide 20: Competent Person's Statement

    Competent Person’s Statement The information in this presentation that relates to Exploration Results is based on information compiled by Mr Justin Brown who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. Justin Brown has sufficient exp

Element 25 — Investor Presentation (January 2022) on 6ix