Rox Resources Ltd · ASX:RXL

Rox Resources — RIU Explorers Conference 2025

21 slides from Rox Resources's conference presentation, Feb 20, 2025

  1. Slide 1: RIU Explorers Conference Presentation

    ASX: RXL Phillip Wilding - CEO 18 – 20 February 2025

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer Important - you must read the following before continuing The following notices and disclaimers apply to this presentation and you are therefore advised to read this carefully before reading or making any other use of this presentation or any information containe

  3. Slide 3: Important Information and Disclaimer

    Important Information and Disclaimer Important - you must read the following before continuing Financial Information All financial information in this presentation is in Australian dollars unless otherwise stated. Effect of Rounding A number of figures, amounts, percentages, estimates, calculations

  4. Slide 4: An Emerging High-Grade Gold Developer

    An Emerging High-Grade Gold Developer High-Grade • High-Grade Maiden Probable Ore Reserve declared 3.8Mt @ 4.4g/t Au for 546koz Resource • Total Mineral Resource estimate of 16.2Mt @4.4g/t Au for 2.3Moz Exploration • Mineral Resource open down dip and along strike • Near-Mine exploration targets Ups

  5. Slide 5: Team, Vision and Mission

    Team, Vision and Mission Proven Leadership Team in the Resource Sector with a Clear Goal Board of Directors Management Stephen Dennis Dr John Mair Phillip Wilding Greg Hoskins Non-Executive Chair Non-Executive Director Chief Executive Officer Chief Financial Officer Matthew Hogan Nathan Stoitis Dani

  6. Slide 6: Corporate Overview

    Corporate Overview Analyst Coverage Capital Structure (as at 17 Feb 25) Hawke’s Point Shares on Issue 607.9m 19.6% Share Price A$0.245 Market Capitalisation A$149m 9.9% QGold Other 52.4% Unlisted Options 30.3m Performance Rights 10.4m 9.3% Venus 8.8% Metals Cash and cash equivalents1 A$25.5m Institu

  7. Slide 7: The Youanmi Gold Project

    The Youanmi Gold Project • Located in the central part of the Youanmi Greenstone Belt, in the Southern Cross Province of the Archaean Yilgarn Craton in Western Australia, “Australia’s premier gold province” • Surrounded by million-ounce mines and major gold producers • Proven track record of product

  8. Slide 8: Youanmi PFS Highlights

    Youanmi PFS Highlights A high-grade, high-margin underground gold project with compelling economics and potential for significant further upside High-Grade • High-Grade Maiden Probable Ore Reserve estimate of 3.8Mt @ 4.4 g/t Au for Reserve and 546koz Resource • Total Mineral Resource estimate of 16.

  9. Slide 9: High-Grade Mineral Resource Estimate (January 2024)

    High-Grade Mineral Resource Estimate (January 2024) Cut-off Indicated Inferred Total Category Grade Tonnes Au Grade Au Metal Tonnes Au Grade Au Metal Tonnes Au Grade Au Metal (g/t) (Mt) (g/t) (Koz) (Mt) (g/t) (Koz) (Mt) (g/t) (Koz) Open Pit 0.5 5.1 2.8 458 1.4 2.4 108 6.5 2.7 565 Underground 2.5 5.6

  10. Slide 10: High-Grade Ore Reserve (July 2024)

    High-Grade Ore Reserve (July 2024) Existing Decline to ~600m below surface Ore Reserve Tonnes (Mt) Grade (g/t Au) Contained Ounces (koz) Proved Underground Ore Reserve 0.0 0.0 0.0 Probable Underground Ore Reserve 3.83 4.4 546 Total Underground Ore Reserve 3.83 4.4 546 ASX: RXL 10

  11. Slide 11: Key Results from Growth Program (11,000m)

    Key Results from Growth Program (11,000m) Focused on Resource Conversion and Metallurgy Samples ASX: RXL 11

  12. Slide 12: Key Initial Results from Step-up Program (35,000m) & Exploration Target

    Key Initial Results1 from Step-up Program (35,000m) & Exploration Target2 Exploration Targets Target Tonnage Grade Au Ounce Au Area Range Range Range 1.0Mt to 5.3 g/t to 193Koz to Kathleen 1.3Mt 8.0 g/t 355Koz 0.8Mt to 3.9 g/t to 110Koz to Pollard 1.0Mt 7.8 g/t 269Koz Main 0.3Mt to 3.4 g/t to 42Koz

  13. Slide 13: Regional Advanced Projects

    Regional Advanced Projects Currans Find Gold Project • Located 20km south of Youanmi • Significant historical intercepts at Currans Find include: o CFRC026: 3m @ 32.58g/t Au from 115m o CFRC016: 3m @ 27.50g/t Au from 39m o CFRC031: 4m @ 18.59g/t Au from 108m o CFRC084: 3m @ 19.58g/t Au from 21m • Re

  14. Slide 14: Indicative Pathway to Production

    Indicative Pathway to Production Developing a high-grade, high-margin underground gold project whilst simultaneously unlocking its significant growth potential I CY24 CY25 CY26 CY27 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Key Project Deliverables Definitive Feasibility Study FID Mill construction and commi

  15. Slide 15: Metallurgical Testwork Underway

    Metallurgical Testwork Underway • Metallurgical testwork for the DFS advancing • All composite samples delivered to ALS and flotation works have commenced. The concentrate produced will be sent to Core Resources laboratory to commence the Albion testwork Rougher flotation – recovers as much sulphide

  16. Slide 16: Dewatering Early Works

    Dewatering Early Works Previous Tailings • Significant infrastructure with high volume evaporation ponds Storage available – Fully permitted • Civil works underway for refurbishment, pumping infrastructure Licenced Evaporation on order Ponds • Permits lodged to move water to Northern Pits • Target t

  17. Slide 17: Next Steps

    Next Steps Near-mine Exploration and Growth ~35,000m Drill Program Underway • Drill near-mine growth exploration targets – focus for early ounces and increased production followed by infill and depth extensions • Potential to significantly increase the scale of the Youanmi Gold Project Progress Defi

  18. Slide 18: Thank You

    Thank You Level 2, 87 Colin Street, West Perth, WA 6005 (08) 9226 0044 admin@roxresources.com.au www.roxresources.com.au

  19. Slide 19: Appendix - PFS Production Target – the Starting Point

    Appendix - PFS Production Target – the Starting Point Current Life of Mine Ounces Mined and AISC – THE AIM – to bring in forward ounces and increase with higher throughput Ounces Mined (koz) AISC $/oz 140 2,800 130 Indicated Inferred AISC 120 2,400 110 100 2,000 90 Board 80 and Management 1,600 70 6

  20. Slide 20: Appendix - Project PFS Capital Requirement

    Appendix - Project PFS Capital Requirement Attractive Value Proposition Pre-Production Capital Costs A$m Base Case A$3,100/oz Site Infrastructure 22 $486m Processing Facilities 150 2.0x $322m Tailings Storage Facility 4 $252m $245m value Gap Underground Development 39 4.6x $70m Commissioning costs –

  21. Slide 21: Appendix - Processing – A Scalable Plant

    Appendix - Processing – A Scalable Plant Simple flowsheet to produce gold doré averaging 103koz per annum – with recoveries estimated at 92.6% Simple Flowsheet • Conventional crushing, grinding and flotation → Flotation concentrate to Albion ProcessTM → Flotation tails to conventional CIL • Albion P

Rox Resources — RIU Explorers Conference 2025 on 6ix