  1. Slide 1: Intimation of Presentation for Institutional Investors Meet

    12th June, 2025 The General Manager The Manager The Corporate Relationship Department Listing Department BSE Limited National Stock Exchange of India 1st floor, New Trading Ring, Limited Rotunda Building “Exchange Plaza”, C-1, Block G P J Towers Bandra-Kurla Complex Dalal Street, Fort Bandra (E) Mum

  2. Slide 2: Energy Pump Division at a Glance

    Internal Energy Pump Division at a Glance © Copyright KSB SE & Co. KGaA Nitin Patil

  3. Slide 3: Table of Content

    Internal 01 Facility at glance Table of Content 02 KSB India’s Nuclear Journey 03 Product Gallery 04 Business Overview 2 | Investor Presentation | Nuclear Division | 2025

  4. Slide 4: Energy/Nuclear Pump Division

    Internal Energy/Nuclear Pump Division 3 | Investor Presentation | Nuclear Division | 2025

  5. Slide 5: Facility at Glance

    Internal 1 Facility at Glance • Plant overview • Shop Glimpses • Technical advancement in machines • Test field facilities • Segments catered through EPD 4 | Investor Presentation | Nuclear Division | 2025

  6. Slide 6: Plant Overview

    Plant Overview Internal EPD Plant established in 2017 with the site size of 100000 sq mt. Salient Features: • Best in class and State of art Factory • IGBC Green factory building - Platinum rating (Global Excellence) • Shop evaporative cooled with forced circulation for dust-free Environment / Bette

  7. Slide 7: Shop Glimpses

    Shop Glimpses Internal Assembly Shop Test Field Machine Shop 6 | Investor Presentation | Nuclear Division | 2025

  8. Slide 8: Test Field Facilities

    Test Field Facilities Internal Best in class test facility • Performance test • Horizontal and Vertical pump test • NPSH test • Pressure pulsation test • Visual cavitation test • String and Hot water test • Thermal shock test incl stress measurement • String test • Test with VFD and Gear Box combina

  9. Slide 9: Segments Catered through EPD Plant

    Segments Catered through EPD Plant Internal Major segments catered : • Nuclear power plant • Thermal power plant • Oil and Gas industry 8 | Investor Presentation | Nuclear Division | 2025

  10. Slide 10: KSB India's Nuclear Journey

    Internal 2 KSB India’s Nuclear Journey • KSB India’s Nuclear Journey • Primary coolant pump – India reference • Quality standards • Customer Events and achievements 9 | Investor Presentation | Nuclear Division | 2025

  11. Slide 11: KSB India's Nuclear journey

    KSB India’s Nuclear journey Internal 1977 1978 1979 1982 1983 1986 1989 Tripartite Agreement DAE Commissioned the Reactor coolant Primary Coolant Primary coolant pumps Tripartite Agreement DAE , Primary coolant Pump , KSB Germany and KSB Chinchwad Plant pump to Narora 2 Pumps for Narora 1 KSB German

  12. Slide 12: Primary Coolant Pumps – Indian Reference

    Primary Coolant Pumps – Indian Reference Internal 220 Mwe PHWR (48 Pumps) Narora 1 & 2 Kakrapara 1 & 2 Rawatbhata 3 – 6 Kaiga 1 – 4 540 Mwe / 700 Mwe PHWR (24 Pumps) Tarapur 3-4 Kakrapara 3 & 4 Rawatbhata 7 & 8 700Mwe PHWR Under Manufacturing (16 Pumps) GHAVP 1 & 2 (under Manufacturing) Kaiga 5 & 6

  13. Slide 13: Quality Standards

    Quality Standards Internal First Pump company to be certified as per ISO 19443 ITNS Requirements Quality Management Occupational Health & Environmental Management Management System standard ISO 9001:2015 Safety Management Standard ISO 14001:2015 Certificate ISO 19443:2018 Standard ISO 45001:2018 Ent

  14. Slide 14: Customer Visit

    Customer Visit Internal • Special event held for NPCIL plant level teams from 7 NCPIL locations. • Inauguration of Dynamic Test Facility of 220 mw Primary coolant Pump, mechanical seal and launch of Reciprocating pumps 13 | Investor Presentation | Nuclear Division | 2025

  15. Slide 15: Certification -- ISO 19443 Nuclear Safety

    Certification -- ISO 19443 Nuclear Safety Internal 14 | Investor Presentation | Nuclear Division | 2025

  16. Slide 16: Product Gallery

    Internal 3 Product Gallery • Primary Circuit products • Secondary Circuit products 15 | Investor Presentation | Nuclear Division | 2025

  17. Slide 17: KSB has Products for every Nuclear Application

    Internal Pressurised Water Reactor Boiling Water Reactor Small Modular Reactor Molten Salt Reactor Lead Cooled Fast Reactor Sodium Cooled Liquid –Metal Reactor KSB has Products for every Nuclear Application 16 | Investor Presentation | Nuclear Division | 2025

  18. Slide 18: Product Gallery- Primary & Secondary Circuit

    Product Gallery- Primary & Secondary Circuit Internal Products for every Application Primary circuit RTS Turbine driven pump  Reactor coolant recirculation  Emergency cooling and residual heat removal RUV reactor coolant RER / RSR  Safety injection reactor coolant pump LUV reactor water pump RHM

  19. Slide 19: Business Overview

    Internal 4 Business Overview • Order on Hand • India’s Nuclear Roadmap 18 | Investor Presentation | Nuclear Division | 2025

  20. Slide 20: Order on Hand – Nuclear pump + spares

    Order on Hand – Nuclear pump + spares Internal Values in Rs. Mio 12,000 10,000 8,000 12,828 12,906 6,000 9,687 4,000 KSB KSB Limited's entryinto Limited's entry intothethe substantial substantial export export 2,000 market market for nuclear nuclearpumps pumps andand involves involves the the supply

  21. Slide 21: India's Nuclear Roadmap

    India’s Nuclear Roadmap Internal Expansion Plans Policy & Investment • 8 reactors (6.6 GW) under construction • Atomic Energy Act and Liability Act amendments- private sector participation in • 10 reactors (7 GW) in pre-project stage nuclear energy development • Target: 22,480 MW by 2031-32 • NTPC t

  22. Slide 22: Thank You

    Internal Thank You…..! 21 | Investor Presentation | Nuclear Division | 2025

  23. Slide 23: b) KSB

    b) KSB

  24. Slide 24: Solar Business

    © Copyright KSB SE & Co. KGaA 2019 Solar Business Sunil Bapat 12th June 2025

  25. Slide 25: Content

    Confidential Content 1. Our Journey 2. Products 3. Infrastructure 4. Presence in India 5. Orders received & installation status 6. Experience certificates / Installers 3

  26. Slide 26: Solar Business - Milestones

    | Solar Business - Milestones • Expansion of installer & service network • PMSM Motor • Expansion of development plant & zonal organization • PM KUSUM • Orders from Empanelment Maharashtra/ Rajasthan/ Gujarat • Solar • SECI Order from Organization Order Intake UP Government 1989 Mio © Copyright KSB

  27. Slide 27: Update on PM KUSUM Scheme

    Confidential | Update on PM KUSUM Scheme PM-KUSUM SCHEME Component-A: 10,000 MW of Component-B: Installation Component-C: Solarization of 15 Decentralized Ground Mounted Grid of 20 lakh Standalone Solar Lakh existing Grid-connected Connected Solar Power Plants. Powered Agriculture Pumps. Agriculture

  28. Slide 28: Products

    Confidential | Products Pump Size Motor Type HP Ratings Voltage UMAI 100CH 3 Ph - 0.75 to 10.0 110-400 V 3 Ph – 3.0 HP 100 mm KDCSOL– Water Filled 170-260 V 3 Ph – 5.0 HP KDCSOL – Oil Filled 3 Ph – 1.0 to 7.5 HP 80-380 V UMAI 150CH 3 Ph - 3.0 to 15.0 320-400 V © Copyright KSB SE & Co. KGaA UMAH 150C

  29. Slide 29: Infrastructure

    Confidential | Infrastructure Solar Pump Performance Test PMSM Motor Assembly Line SS Pumps Assembly Line Panel with Solar Simulator Capacity – 24,000 Nos © Copyright KSB SE & Co. KGaA 7 | Solar Business |

  30. Slide 30: Presence in India

    Confidential | Presence in India Maharashtra Gujarat Haryana Participated & Receiving Orders Uttar Pradesh Rajasthan Tripura Madhya Punjab Meghalaya © Copyright KSB SE & Co. KGaA Pradesh Awaiting State Tenders Assam Odisha Chhattisgarh 8 | Solar Business |

  31. Slide 31: Order Intake & Sales

    Confidential | Order Intake & Sales All values are in Mio. INR. Order Intake Orders on Hand as on 01.03.25 2500 1989 2000 Total 318 1500 1000 893 SECI 104 500 371 110 0 Non SECI 214 2021 2022 2023 2024 0 50 100 150 200 250 300 350 Sales Upcoming Tenders © Copyright KSB SE & Co. KGaA 2500 2000 1831 1

  32. Slide 32: Orders Received & Installation Status

    Confidential | Orders Received & Installation Status Table Shows No of Systems Orders Received 8,010 Systems Installations Completed 6,980 Systems Maharashtra States Haryana Gujarat Rajasthan Uttar Pradesh MSEDCL MEDA Orders 2771 2289 477 1299 680 494 Received Systems 2501 1802 456 1132 595 494 Inst

  33. Slide 33: Installations

    Confidential | Installations © Copyright KSB SE & Co. KGaA 11 | Solar Business |

  34. Slide 34: Experience Certificates

    Confidential | Experience Certificates © Copyright KSB SE & Co. KGaA 12 | Solar Business |

  35. Slide 35: Installer Network

    Confidential | Installer Network Total 31 Installers Rajasthan 2 9 Haryana Installers Installers Gujarat 2 1 Uttar Pradesh Installers Installers © Copyright KSB SE & Co. KGaA Maharashtra 14 3 Tripura Installers Installers 13 | Solar Business |

  36. Slide 36: Happy Customers

    Confidential | Happy Customers © Copyright KSB SE & Co. KGaA 14 | Solar Business |

  37. Slide 37: Thank You

    THANK YOU Moving towards Clean Energy © Copyright KSB SE & Co. KGaA 15 | Solar Business |