Slide 1: Intimation of Presentation for Institutional Investors Meet
12th June, 2025 The General Manager The Manager The Corporate Relationship Department Listing Department BSE Limited National Stock Exchange of India 1st floor, New Trading Ring, Limited Rotunda Building “Exchange Plaza”, C-1, Block G P J Towers Bandra-Kurla Complex Dalal Street, Fort Bandra (E) Mum
Slide 2: Energy Pump Division at a Glance
Internal Energy Pump Division at a Glance © Copyright KSB SE & Co. KGaA Nitin Patil
Slide 3: Table of Content
Internal 01 Facility at glance Table of Content 02 KSB India’s Nuclear Journey 03 Product Gallery 04 Business Overview 2 | Investor Presentation | Nuclear Division | 2025
Slide 4: Energy/Nuclear Pump Division
Internal Energy/Nuclear Pump Division 3 | Investor Presentation | Nuclear Division | 2025
Slide 5: Facility at Glance
Internal 1 Facility at Glance • Plant overview • Shop Glimpses • Technical advancement in machines • Test field facilities • Segments catered through EPD 4 | Investor Presentation | Nuclear Division | 2025
Slide 6: Plant Overview
Plant Overview Internal EPD Plant established in 2017 with the site size of 100000 sq mt. Salient Features: • Best in class and State of art Factory • IGBC Green factory building - Platinum rating (Global Excellence) • Shop evaporative cooled with forced circulation for dust-free Environment / Bette
Slide 7: Shop Glimpses
Shop Glimpses Internal Assembly Shop Test Field Machine Shop 6 | Investor Presentation | Nuclear Division | 2025
Slide 8: Test Field Facilities
Test Field Facilities Internal Best in class test facility • Performance test • Horizontal and Vertical pump test • NPSH test • Pressure pulsation test • Visual cavitation test • String and Hot water test • Thermal shock test incl stress measurement • String test • Test with VFD and Gear Box combina
Slide 9: Segments Catered through EPD Plant
Segments Catered through EPD Plant Internal Major segments catered : • Nuclear power plant • Thermal power plant • Oil and Gas industry 8 | Investor Presentation | Nuclear Division | 2025
Slide 10: KSB India's Nuclear Journey
Internal 2 KSB India’s Nuclear Journey • KSB India’s Nuclear Journey • Primary coolant pump – India reference • Quality standards • Customer Events and achievements 9 | Investor Presentation | Nuclear Division | 2025
Slide 11: KSB India's Nuclear journey
KSB India’s Nuclear journey Internal 1977 1978 1979 1982 1983 1986 1989 Tripartite Agreement DAE Commissioned the Reactor coolant Primary Coolant Primary coolant pumps Tripartite Agreement DAE , Primary coolant Pump , KSB Germany and KSB Chinchwad Plant pump to Narora 2 Pumps for Narora 1 KSB German
Slide 12: Primary Coolant Pumps – Indian Reference
Primary Coolant Pumps – Indian Reference Internal 220 Mwe PHWR (48 Pumps) Narora 1 & 2 Kakrapara 1 & 2 Rawatbhata 3 – 6 Kaiga 1 – 4 540 Mwe / 700 Mwe PHWR (24 Pumps) Tarapur 3-4 Kakrapara 3 & 4 Rawatbhata 7 & 8 700Mwe PHWR Under Manufacturing (16 Pumps) GHAVP 1 & 2 (under Manufacturing) Kaiga 5 & 6
Slide 13: Quality Standards
Quality Standards Internal First Pump company to be certified as per ISO 19443 ITNS Requirements Quality Management Occupational Health & Environmental Management Management System standard ISO 9001:2015 Safety Management Standard ISO 14001:2015 Certificate ISO 19443:2018 Standard ISO 45001:2018 Ent
Slide 14: Customer Visit
Customer Visit Internal • Special event held for NPCIL plant level teams from 7 NCPIL locations. • Inauguration of Dynamic Test Facility of 220 mw Primary coolant Pump, mechanical seal and launch of Reciprocating pumps 13 | Investor Presentation | Nuclear Division | 2025
Slide 15: Certification -- ISO 19443 Nuclear Safety
Certification -- ISO 19443 Nuclear Safety Internal 14 | Investor Presentation | Nuclear Division | 2025
Slide 16: Product Gallery
Internal 3 Product Gallery • Primary Circuit products • Secondary Circuit products 15 | Investor Presentation | Nuclear Division | 2025
Slide 17: KSB has Products for every Nuclear Application
Internal Pressurised Water Reactor Boiling Water Reactor Small Modular Reactor Molten Salt Reactor Lead Cooled Fast Reactor Sodium Cooled Liquid –Metal Reactor KSB has Products for every Nuclear Application 16 | Investor Presentation | Nuclear Division | 2025
Slide 18: Product Gallery- Primary & Secondary Circuit
Product Gallery- Primary & Secondary Circuit Internal Products for every Application Primary circuit RTS Turbine driven pump Reactor coolant recirculation Emergency cooling and residual heat removal RUV reactor coolant RER / RSR Safety injection reactor coolant pump LUV reactor water pump RHM
Slide 19: Business Overview
Internal 4 Business Overview • Order on Hand • India’s Nuclear Roadmap 18 | Investor Presentation | Nuclear Division | 2025
Slide 20: Order on Hand – Nuclear pump + spares
Order on Hand – Nuclear pump + spares Internal Values in Rs. Mio 12,000 10,000 8,000 12,828 12,906 6,000 9,687 4,000 KSB KSB Limited's entryinto Limited's entry intothethe substantial substantial export export 2,000 market market for nuclear nuclearpumps pumps andand involves involves the the supply
Slide 21: India's Nuclear Roadmap
India’s Nuclear Roadmap Internal Expansion Plans Policy & Investment • 8 reactors (6.6 GW) under construction • Atomic Energy Act and Liability Act amendments- private sector participation in • 10 reactors (7 GW) in pre-project stage nuclear energy development • Target: 22,480 MW by 2031-32 • NTPC t
Slide 22: Thank You
Internal Thank You…..! 21 | Investor Presentation | Nuclear Division | 2025
Slide 23: b) KSB
b) KSB
Slide 24: Solar Business
© Copyright KSB SE & Co. KGaA 2019 Solar Business Sunil Bapat 12th June 2025
Slide 25: Content
Confidential Content 1. Our Journey 2. Products 3. Infrastructure 4. Presence in India 5. Orders received & installation status 6. Experience certificates / Installers 3
Slide 26: Solar Business - Milestones
| Solar Business - Milestones • Expansion of installer & service network • PMSM Motor • Expansion of development plant & zonal organization • PM KUSUM • Orders from Empanelment Maharashtra/ Rajasthan/ Gujarat • Solar • SECI Order from Organization Order Intake UP Government 1989 Mio © Copyright KSB
Slide 27: Update on PM KUSUM Scheme
Confidential | Update on PM KUSUM Scheme PM-KUSUM SCHEME Component-A: 10,000 MW of Component-B: Installation Component-C: Solarization of 15 Decentralized Ground Mounted Grid of 20 lakh Standalone Solar Lakh existing Grid-connected Connected Solar Power Plants. Powered Agriculture Pumps. Agriculture
Slide 28: Products
Confidential | Products Pump Size Motor Type HP Ratings Voltage UMAI 100CH 3 Ph - 0.75 to 10.0 110-400 V 3 Ph – 3.0 HP 100 mm KDCSOL– Water Filled 170-260 V 3 Ph – 5.0 HP KDCSOL – Oil Filled 3 Ph – 1.0 to 7.5 HP 80-380 V UMAI 150CH 3 Ph - 3.0 to 15.0 320-400 V © Copyright KSB SE & Co. KGaA UMAH 150C
Slide 29: Infrastructure
Confidential | Infrastructure Solar Pump Performance Test PMSM Motor Assembly Line SS Pumps Assembly Line Panel with Solar Simulator Capacity – 24,000 Nos © Copyright KSB SE & Co. KGaA 7 | Solar Business |
Slide 30: Presence in India
Confidential | Presence in India Maharashtra Gujarat Haryana Participated & Receiving Orders Uttar Pradesh Rajasthan Tripura Madhya Punjab Meghalaya © Copyright KSB SE & Co. KGaA Pradesh Awaiting State Tenders Assam Odisha Chhattisgarh 8 | Solar Business |
Slide 31: Order Intake & Sales
Confidential | Order Intake & Sales All values are in Mio. INR. Order Intake Orders on Hand as on 01.03.25 2500 1989 2000 Total 318 1500 1000 893 SECI 104 500 371 110 0 Non SECI 214 2021 2022 2023 2024 0 50 100 150 200 250 300 350 Sales Upcoming Tenders © Copyright KSB SE & Co. KGaA 2500 2000 1831 1
Slide 32: Orders Received & Installation Status
Confidential | Orders Received & Installation Status Table Shows No of Systems Orders Received 8,010 Systems Installations Completed 6,980 Systems Maharashtra States Haryana Gujarat Rajasthan Uttar Pradesh MSEDCL MEDA Orders 2771 2289 477 1299 680 494 Received Systems 2501 1802 456 1132 595 494 Inst
Slide 33: Installations
Confidential | Installations © Copyright KSB SE & Co. KGaA 11 | Solar Business |
Slide 34: Experience Certificates
Confidential | Experience Certificates © Copyright KSB SE & Co. KGaA 12 | Solar Business |
Slide 35: Installer Network
Confidential | Installer Network Total 31 Installers Rajasthan 2 9 Haryana Installers Installers Gujarat 2 1 Uttar Pradesh Installers Installers © Copyright KSB SE & Co. KGaA Maharashtra 14 3 Tripura Installers Installers 13 | Solar Business |
Slide 36: Happy Customers
Confidential | Happy Customers © Copyright KSB SE & Co. KGaA 14 | Solar Business |
Slide 37: Thank You
THANK YOU Moving towards Clean Energy © Copyright KSB SE & Co. KGaA 15 | Solar Business |