Australian Critical Minerals Ltd. · ASX:ACM
Australian Critical Minerals — Investor Presentation (January 2026)
17 slides from Australian Critical Minerals's investor presentation, Jan 29, 2026
Slide 1: Gold, Copper, Silver in Premier Mineral Region in Peru
GOLD, COPPER, SILVER IN PREMIER MINERAL REGION IN PERU High-Grade Potential and Ready for Discovery Investor Presentation January 2026
Slide 2: Corporate Snapshot
CORPORATE SNAPSHOT AUSTRALIAN CRITICAL MINERALS | INVESTOR PRESENTATION ACM ASX CODE 106.7M SHARES ON ISSUE $0.086 SHARE PRICE 43,443,754 (listed ACMOA, $0.30 exp 26/6/26) 9,092,270 (unlisted $0.10 exp 22/9/2027) Performance Rights: 5,000,000 SHAREHOLDERS BOARD & MANAGEMENT Dean De Largie, Executive
Slide 3: World-Class Exploration Assets in Peru
WORLD-CLASS EXPLORATION ASSETS IN PERU AUSTRALIAN CRITICAL MINERALS | INVESTOR PRESENTATION 1 FLINT PROJECT Gold, Silver Large-scale, multi-million-ounce gold-silver opportunity with strong pathfinder geochemistry (+6000 ppm As, Se, Sb, Bi, Te, Th). Extensive alteration footprint and geophysical ano
Slide 4: Flint Project: Location and Major Local Minesites
FLINT PROJECT FLINT PROJECT | GOLD, SILVER Location and Major Local Minesites • Claims Package covers ~19.7 km2 • World Class Metallogenic Belt: • 10 Major deposits • Resources exceeding 50Moz Gold • Access and Location: • Road Access through Project • 80 km East of Trujillo - population +1M • Socia
Slide 5: Flint Project Gold-Silver High Sulphidation Target Clusters
FLINT PROJECT 3 GOLD - SILVER HIGH SULPHIDATION TARGET CLUSTERS NORTH, SOUTH & FLINT PROJECT | GOLD, SILVER CENTRAL. CURRENT NORTHERN TARGET FOCUS NSAMT geophysics identifies 2 Compilation of all data has Modelling validated the HSE large resistive targets north and defined multiple High model with
Slide 6: Geophysics, Surface Geochemistry and Mapping Coverage
Flint: Geophysics, Surface Geochemistry and Mapping Coverage FLINT PROJECT | GOLD, SILVER • Claims Package covers ~19.7 km2 2025 AMT Survey Lines Historic IP & Magnetic Survey Lines • Geophysics: Historic rock chip • ACM 2025 AMT survey, 14 lines for 26.5 line-km samples • Historic IP & Magnetics, 1
Slide 7: Lithology and Alteration
Flint: Lithology and Alteration FLINT PROJECT | GOLD, SILVER Lithology – Andesitic to Dacite composition Alteration – Large Advanced Argillic zone Large scale alteration typical of Limit of Limit of High Sulfidation Epithermal (HSE) Mapping Claims Boundary Mapping Claims Boundary Au Ag systems • +2.
Slide 8: Geochemistry Tellurium grid + Gold rock chips
Flint: Geochemistry Tellurium grid + Gold rock chips • High order As Sb Te rock chip anomaly extends for2.5 km 40 Rock chip arsenic Grid + Gold >7ppb Points +3 m FLINT PROJECT | GOLD, SILVER p • Localised Au to + 50 ppb and Ag in rock chip – significant in As p terms of pathfinder trace element geoc
Slide 9: Geophysics
Flint: Geophysics AMT & IP Geophysics Interpretation FLINT PROJECT | GOLD, SILVER Limit of • Linear Chargeability and NSAMT Geophysics Resistive features identified Priority Northern HSE Gold Target Cluster Te +1 ppm • Extensive strong arsenic geochemistry Sb +25 • Qtz-alunite argillic alteration co
Slide 10: Target Clusters - Drill Hole Planning
Flint: 3 Target Clusters - Drill Hole Planning FLINT PROJECT | GOLD, SILVER Priority Northern HSE Gold Target Cluster Large Conductor Anomaly Porphyry Lithocap Target Qtz-Alunite Southern HSE Priority Northern Adv.Argillic Core Target Cluster HSE Gold Target Cluster <100 ohm.m DDH_005 Conductive Ano
Slide 11: Priority Drill Holes
Flint: Priority Drill Holes • Northern HSE Target Cluster - conceptual HSE Au Ag breccia pipe and quartz-alunite replacement targets FLINT PROJECT | GOLD, SILVER • Mapped zones of advanced argillic / quartz-alunite alteration • Planned priority drilling of 5 drillholes for 2200 m • Higher priority t
Slide 12: Compelling Priority Drill Targets
Flint: Compelling Priority Drill Targets FLINT PROJECT | GOLD, SILVER • 4 km long geophysics anomaly North • Extensive mapped hydrothermal alteration • Coincident High-Sulphidation pathfinder geochemistry • Multiple priority drill targets South Approx. 500 m Planned AMT 1D Inversion IP Chargeability
Slide 13: HSE - Gold Summary: Exploration Checklist
HSE - Gold Summary: Exploration Checklist FLINT PROJECT | GOLD, SILVER High Sulphidation Epithermal Salares Flint HSE Salares Norte Alturas • Reserve – 4.1 Moz AuEq (2018) Gold-Silver Checklist Norte Project District scale advanced argillic and • Maiden Resource - 4.5 Moz AuEq * argillic alteration
Slide 14: HSE – Deposit Similarities and Key Features
HSE – Deposit Similarities and Key Features FLINT PROJECT | GOLD, SILVER • 150 – 250m thick gold-barren (0 – 50ppb) steam heated and advanced argillic alteration cap, concealing Salares Norte and Agua SNDD535: 14.90 m @ 26.28 g/t Au, SNDD526: 100.00 @ 10.66 g/t Au, Amarga gold-silver deposits. SNDD5
Slide 15: HSE – Salares Norte Deposit Similarities and Key Features
HSE – Salares Norte Deposit Similarities and Key Features FLINT PROJECT | GOLD, SILVER MBx MHBx PHBx • Barren surface cap to approx. 150m • Pre-mineral Andesite to Dacite domes – evolving magmas • Extensive strong As in surface soil samples • Gold and silver mineralisation below the paleo-water tabl
Slide 16: Contact Us
CONTACT US Dean de Largie dean@auscriticalminerals.com.au +61 448 713 121 Paul Berson paul@corporatestorytime.com +61 421 467 445 16
Slide 17: Disclaimer
DISCLAIMER This presentation has been prepared by Australian Critical Minerals Limited (“Company”). It ASX Listing Rule 5.23.2 does not purport to contain all the information that a prospective investor may require in The Company confirms that it is not aware of any new information or data that mate
Australian Critical Minerals — Investor Presentation (January 2026) on 6ix