Australian Critical Minerals Ltd. · ASX:ACM
Australian Critical Minerals — Investor Presentation (December 2023)
18 slides from Australian Critical Minerals's investor presentation, Dec 13, 2023
Slide 1: Developing a high-quality portfolio of critical minerals to support the green revolution
Developing a high-quality portfolio of critical minerals to support the green revolution ASX:ACM COMPANY PRESENTATION DECEMBER 2023
Slide 2: Disclaimer
Disclaimer This presentation has been prepared by Australian Critical Minerals Limited (The Company). It does not This presentation contains reference to certain intentions, expectations, future plans, strategy and prospects purport to contain all the information that a prospective investor may requ
Slide 3: Demand for Critical Minerals
Demand for Critical Minerals The next mining boom is here The transition to cleaner technologies is fueling significant global demand for critical minerals ACM is well placed to make the most of this opportunity with a multiple commodity strategy: – Lithium – Iron Ore – Rare Earth Elements (REE) – K
Slide 4: Corporate Overview
Corporate Overview Capital Structure Executive Board Shares Shares on Issue 32,076,250 Dean de Largie Michael Wright Gary Brabham MANAGI N G DIREC TO R NON-EX EC U TI V E CHAIRM A N NON-EX EC U TI V E DIRECT O R Restricted Shares 11,455,010 Options on Issue 35,943,754 Dean has been key to identifyin
Slide 5: Cooletha Project – Pilbara
Cooletha Project – Pilbara • Located in the Pilbara alongside significant lithium mines and projects • Pilbara Mineral’s Pilgangoora (413Mt @ 1.15% Li2O) • Mineral Resource’s Wodgina (259Mt @ 1.17% Li2O) • Global Lithium’s Marble Bar (18Mt @ 1% Li2O) • +100km2 of lithium prospectivity • Multiple spo
Slide 6: Cooletha Project - 2023 Exploration Program
Cooletha Project - 2023 Exploration Program Initial exploration program • Covered only 25% of tenure • 251 rock chip samples, concentrated on western part of tenement • Rock-chip assays confirm lithium prospectivity • 10 high priority targets, over 24km in length • Lithium and lithium-caeseium-tanta
Slide 7: Cooletha Project – Future Exploration
Cooletha Project – Future Exploration • Initial exploration program purpose was to: • gain understanding of broader geology and prospectivity • plan future exploration • Central and eastern side of the Cooletha Project covers the southern extension of the Soansville Group • host to Pilgangoora and W
Slide 8: Rare Earths Rankin Dome, Southern Cross
Rare Earths Rankin Dome, Southern Cross • Located near Southern Cross - an established Mining Centre • Close to Highway with good local access • 3 Exploration Licences • 51% Farm-in with Kula Gold (ASX: KGD) • Previous auger samples REE results up to 1,080ppm, 74% of samples > 115ppm TREE 8 COMPANY
Slide 9: Rare Earths Rankin Dome
Rare Earths Rankin Dome Geophysics and Geochemistry • Geochemistry matches structure & geophysics • +8x Crustal enrichment - in soil! • Large +8km2, highly anomalous TREE soil geochemistry 2023 Auger Sampling Program • 254 holes over ~ 2.5km2 • Rare earth anomaly delineated • 500m x 200m zone of str
Slide 10: Rankin Dome – 2023 Exploration Program
Rankin Dome – 2023 Exploration Program • 6-hole, 864m Reverse Circulation Drilling • 5 drill holes to 150m • 1 drill hole to 114m • Drill holes were planned over areas as having anomalous rare earth geochemistry in shallow auger samples • All 6 drill holes returned thick, continuous and significant
Slide 11: Pilbara Exploration Portfolio
Pilbara Exploration Portfolio • The Pilbara portfolio covers 494km2 including the De Grey Mining Shaw and Cooletha Projects Mallina Gold Project • 100% owned, district-scale projects prospective 2.16Moz @ 1.8g/t Au for: De Grey Mining De Grey Mining Hem i Discovery Loudens Patch Novo Resources - Iro
Slide 12: Cooletha Iron Ore Targets
Cooletha Iron Ore Targets • High grade iron ore targets over 400km2 • Advanced yet still under-explored targets with high grade Channel Iron Deposit (CID) potential • +20km of Channel Iron ridges identified • Average grade 56% Fe across all ridges • If a substantial resource is defined it may be of
Slide 13: Shaw Iron Ore Targets
Shaw Iron Ore Targets • Channel Iron Deposits (CID) and Banded Iron Formation (BIF) Targets • Direct Shipping Ore Potential Shaw E 45/5006 • BIF assay exceeded maximum detection limit of 50% Fe Iron ore • +5km of BIF and CID Exploration Targets reconnaissa nce targets • Close to mine site infrastruc
Slide 14: Moving Forward: Indicative Exploration Schedule
Moving Forward: Indicative Exploration Schedule 2024 2025 Q1 Q2 Q3 Q4 Q1 Q2 COOLETHA Hyperspectral Study and initial targets delivered COOLETHA Heli-supported sampling Li and select Fe Targets. Results expected end March COOLETHA Ground supported Li & Fe sampling COOLETHA Ground supported
Slide 15: Contact Information
Contact Information Dean de Largie info@auscriticalminerals.com.au | +61 (08) 6165 8858 ASX:ACM 168 Stirling Highway, Nedlands WA 6009 | www.auscriticalminerals.com.au
Slide 16: What is Required to Phase Out Fossil Fuels?
What is Required to Phase Out Fossil Fuels? The Global Power Ecosystem in a Fossil Free World The transition to cleaner technologies is fuelling insatiable global demand for critical minerals You have to ask: • What do fossil fuels do for us now? • How many motor vehicles are there? • How many batte
Slide 17: Appendix: Other Projects
Appendix: Other Projects GOLD KAOLIN Shaw Project • 2 other exciting prospective projects in Tier 1 mining jurisdictions: 14.9 g/t Au ‘Buckshot Bed’ – ACM’s Shaw Project sits among SRD14 SRD3 140m SRD9 established gold miners and new 85m 159m SRD15 – 200m discoveries, with grades up to 24g/t Au SRD5
Slide 18: Appendix: Tenement Status
Appendix: Tenement Status ACM AREA AREA TENEMENT PROJECT COMMODITY STATUS HOLDER OWNERSHIP BLKS km 2 CRITICAL E 45/5228 COOLETHA Lithium, Tantalum, Iron Ore, Gold LIVE 100% PROTEROZOIC GOLD PTY LTD 40 127.0 E 45/4990 COOLETHA Lithium, Tantalum, Iron Ore, Gold LIVE 100% PROTEROZOIC GOLD PTY LTD 39 12
Australian Critical Minerals — Investor Presentation (December 2023) on 6ix