Slide 1: Towards a mid-tier copper producer
Towards a mid-tier copper producer Annual General Meeting Operations 29 May 2014 0
Slide 2: Disclaimer
Disclaimer This presentation (the “Presentation”) is strictly confidential to the recipient and has been prepared by Metminco Limited (“Metminco” or the “Company”) based on the information available to it. It is intended solely for the information of the initial recipient of this presentation. Metmi
Slide 3: Key assets
Key assets Portfolio of mineral assets in top two copper producing countries - Peru and Chile • Los Calatos, Peru – long life, low cost copper-molybdenum project – Porphyry hosted: 1.42Bt at 0.47% Cu & 0.022% Mo (0.15% & 0.35% CuEq cut-off) – Open pit and underground (block cave) mining operation
Slide 4: Toquepala
Located in prolific Cu – Mo mining district Close proximity to substantial open pit mining operations Cerro Verde Toquepala Cuajone Unit Started production 1976 1960 1976 Reserves: ¹ Cu grade 0.50% 0.37% 0.38% Mo grade 0.018% 0.017% 0.013% Cut-off grade (CuEq) 0.14% 0.16% 0.17% Strip ratio 4.37 7.67
Slide 5: Los Calatos in brief
Los Calatos in brief 100% owned, large • Measured, Indicated and Inferred Mineral Resource of 1.42Bt at 0.47% Cu & undeveloped Cu-Mo project 0.022% Mo (6.7Mt Cu metal) Located in prolific Cu- • Nearest neighbours include the Toquepala, Cuajone and Cerro Verde mining Mo mining district of Southern Pe
Slide 6: Regional infrastructure
Regional infrastructure Road and Access Proposed Services Corridor • Close to Pan American highway (50km) and the Port of Ilo (100km SW) Power Supply • Power likely to be sourced from the regional city of Moquegua 32km SSE of the project • Power costs low Services Corridor • Services corridor
Slide 7: Simplified geology and Cu and Mo isograde lines (1900m RL)
Simplified geology and Cu and Mo isograde lines (1900m RL) Key Facts Supergene mineralisation in upper 250m Near surface high-grade Cu & Mo domains in northwest Mineralisation largely located in porphyry & adjacent wall rock Mineralisation extends to depths in excess of 1,500m Younger diat
Slide 8: Geological sections – distribution of Cu mineralisation
Geological sections – distribution of Cu mineralisation Diatreme Complex Porphyry Porphyry & wall-rock Pre-cursor Pluton Toquepala Volcanics 0 500m 0.075% Cu Section 10300E 0.25% Cu Section 10900E Anhydrite Surface 7
Slide 9: Mineral Resource Statement – February '13
Mineral Resource Statement – February ‘13 Mineral Resources to vertical depth of 700 metres below surface (above 2300 masl) Category Tonnes (millions) Cu % Mo % Measured 222 0.37 0.031 Indicated 191 0.38 0.020 Total Measured & Indicated 413 0.37 0.026 Inferred 80 0.42 0.009 Note: Reported at a cut-o
Slide 10: Optimised L3_Model – RPM (August 2013)
Optimised L3_Model – RPM (August 2013) Mining infrastructure Open pit • Strip ratio of 3.36:1 • Pit slopes 41º to 47º Underground block cave • 3 Levels • 10 bulk mining stopes • Twin decline system for ore conveyor system and personnel & materials • Four raise-bored ventilation shafts • Primary
Slide 11: Optimised L3_Model - Annual tonnage & CuEq grade
Optimised L3_Model - Annual tonnage & CuEq grade 30,000 1.0 0.9 25,000 0.8 CuEq Grade (%) Tonnes (000’s) 20,000 0.7 0.6 15,000 0.5 0.4 10,000 0.3 5,000 0.2 0.1 0 0.0 Year -4 Year -3 Year -2 Year -1 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 2
Slide 12: Optimised L3_Model - Tonnes mined and grade
Optimised L3_Model - Tonnes mined and grade Optimised L3_ Model - Total Tonnes Mined (RPM – August 2013) Mining Operation Tonnes (million) Cu % Mo % Open Pit 362 0.37 0.023 Underground – Block Cave 449 0.56 0.035 Total 811 0.47 0.029 Total metal mined • 3.85 million tonnes Cu & 0.24 million tonnes M
Slide 13: Key operating parameters – Life of Mine
Key operating parameters – Life of Mine Combined Open Pit & Underground Operational Parameters Life of Mine Parameter Optimised L3_Model Total tonnes mined (million) 811 Average annual tonnes mined (million) 23.9 Average annual copper in concentrate (kt) 98.4 Average annual molybdenum in concentrate
Slide 14: Current work
Current work Preparatory work for pre-feasibility study includes: • Design of infill drilling program Supergene zone Geotechnical Sterilisation • Geotechnical work in support of planned open pit and underground block cave operations • Phase 2 metallurgical test work Use of seawater as a pr
Slide 15: Chilean Projects
Chilean Projects Chilean projects located to east of La Serena Early Stage Advanced Scoping Study Pre-Feasibility Feasibility Production Mollacas Cu Vallecillo Vallecillo (La Colorada) Au - Zn - Ag - Pb Isidro Loica Loica Cu - Mo La Piedra 14
Slide 16: Mollacas in brief
Mollacas in brief 100% owned, small undeveloped Copper • Measured and Indicated Mineral Resource of 15.5Mt @ 0.51%CuT Leach project Located in close • Close to the town of Rapel with road infrastructure and access to power and proximity to infrastructure water Comprehensive • Total of 16,280m of dri
Slide 17: Mollacas Copper Leach Project
Mollacas Copper Leach Project Located 55km ESE of Ovalle Project area comprises 33km2 of tenements Includes 20 Exploitation Concessions 179ha of surface rights held Water rights held to ±175 litres/sec from two canals Legal - Access • First Extension to Initial Servidumbre/Easement declare
Slide 18: Mollacas target – supergene cap of primary porphyry
Mollacas target – supergene cap of primary porphyry Secondary Sulphide Secondary Zone –– highest Sulphide Zone highest copper copper grades (50 –- 100m grades (50 100m below below surface) surface) W COPPER LEACH PROJECT E Oxide Zone Secondary Sulphide Zone CuT % Transitional Sulphide Zone Primary S
Slide 19: Copper leach project – Mineral Resource Estimate
Copper leach project – Mineral Resource Estimate Mineral Resource Estimate – Oxide & Secondary Sulphide Zone (July 2012) Grade Contained Metal Category Tonnes (Mt) CuT (%) Cu_Sol (%) Au (g/t) CuT (t) Cu_Sol (t) Au (oz) Measured 11.2 0.55 0.44 0.124 61,424 49,140 44,523 Indicated 4.3 0.41 0.29 0.138
Slide 20: Mollacas progressing towards development
Mollacas progressing towards development Completed Preliminary layout – SX/EW operation • Updated Scoping study • Resource definition drilling • Geotechnical design work for open pit & leach pads OP • Phase 3 column leach test work • Preliminary layout of mining WD infrastructure WD • Environmenta
Slide 21: Phase 3 metallurgical test work yields positive results
Phase 3 metallurgical test work yields positive results Metallurgical testing 16 columns representing 5 geo- metallurgical units Acid consumption in agglomeration stage reduced from 30kg/t to 10kg/t ore leached 85% soluble copper Ore crush size of P80 12mm to 16mm Stacked ore depth of 6 me
Slide 22: Life of mine financial model yields robust results
Life of mine financial model yields robust results Physicals Unit Parameter Mining rate tpd 6,108 Crushing rate ktpa 2,500 Tonnes leached kt 14,500 Average Cu_Sol % 0.42% Payable Cu t 51,765 LoM Years 7 Financials Unit Parameter Total Capital Expenditure US$000’s 52,306 C1 Cash Operating Costs US$/l
Slide 23: Status
Status Corporate • Cash-on-hand as at 31 March 2014 of A$5.5m • In Situ mining inventory of 3.9 million tonnes (8.5 billion lbs) contained copper to be mined over 34 years Los Calatos • Highly deliverable with designated status of ‘Project of National Interest’ • Optimisation Study (August 2013)