Corazon Mining Limited · ASX:CZN

Corazon Mining — RIU Resources Conference 2019

25 slides from Corazon Mining's conference presentation, May 7, 2019

  1. Slide 1: Conference Presentation

    Conference Presentation 7, 8 & 9 May 2019 LEVEL 1, 329 HAY ST, SUBIACO WA 6008 | PO BOX 8187, SUBIACO EAST WA 6008 | +61(8) 6142 6366 | INFO@CORAZON.COM.AU | WWW.CORAZON.COM.AU 1 1

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation has been prepared by Corazon Mining Limited (“Corazon”). It contains forecasts and forward looking statements which are not a guarantee of future performance and which involve certain risks. Actual results and future outcomes will in all likelihood differ

  3. Slide 3: Corporate Overview

    Capital raising via a Share Purchase Corporate Overview Plan for Shareholders is currently in progress ASX: CZN Shareholders Total Ordinary Shares on Issue 1.381m(1) Top 20 Shareholders 37% Options on issue 145m Board and Management 1.6% Market Capitalisation ($0.004/share) $5.52m Hanking Australia

  4. Slide 4: Two Quality Projects – Key Demand Driven Commodities

    Two Quality Projects – Key Demand Driven Commodities Lynn Lake Nickel-Copper-Cobalt Old Mining Centre Large JORC Resource Base Redevelopment Opportunity Exciting Ni Sulphide Exploration Play Mt Gilmore Copper-Cobalt-Gold Newly Recognised Area Large Project – Little Historical Work Cu-Co Dominant Sul

  5. Slide 5: Two Quality Projects – Recent Work Adds Value

    Two Quality Projects – Recent Work Adds Value Lynn Lake Nickel-Copper-Cobalt New JORC Resource Ground-breaking metallurgical testwork results  Ni concentrate – 26% Ni grade at 71% recovery  Cu concentrate – 27% Cu grade at 77% recovery (Optimisation expected to improve recoveries) Fraser Lake Comp

  6. Slide 6: Two Quality Projects – Recent Work Adds Value

    Two Quality Projects – Recent Work Adds Value Mt Gilmore Copper-Cobalt-Gold New giant copper-cobalt-sliver-gold geochemical anomalies Copper sulphide targets - an additional exciting focus for exploration at the project Enormous value has been added to both projects over the last few months 6

  7. Slide 7: Mt Gilmore Project New South Wales

    Mt Gilmore Project Main focus of activity for New South Wales Corazon PROJECT SUMMARY – A NEW DISCOVERY OF A LARGE SULPHIDE SYSTEM  Project hosts key demand-driven commodities for booming rechargeable battery sector  Most advanced prospect is a unique cobalt dominant sulphide deposit – Cobalt Ridg

  8. Slide 8: Mt Gilmore Project – Point of Difference

    Mt Gilmore Project – Point of Difference THE COBALT RIDGE PROSPECT  First World location +90% of metal captured in <10% of the mass feed  Cobalt dominant sulphide mineralisation via simple flotation  Simple, low capital processing options processing Mt Gilmore  Quality products Grafton Sulphide

  9. Slide 9: Mt Gilmore Project - Cobalt Ridge Prospect

    Mt Gilmore Project - Cobalt Ridge Prospect QUARTZ-TOURMALINE BRECCIAS UNTESTED POTENTIAL SPATIALLY ASSOCIATED WITH 8 %Co 2m @ 0.64 %Co, 1.66 COBALT-COPPER MINERALISATION (Historical Workings) %Cu, 0.13 g/tAu in Reconnaissance Drilling  Tourmaline is a common mineral within hydrothermal deposits – t

  10. Slide 10: Mt Gilmore Project – Recent Results

    Geology + Copper Mt Gilmore Project – Recent Results in Soils Image COBALT RIDGE – ONE PROSPECT WITHIN A LARGE PROJECT AREA  Multiple occurrences of late-1800’s / early-1900’s copper/gold workings  NEW discovery - “district scale” geochemical anomaly coincident with basement of the Mt Gilmore Tren

  11. Slide 11: Mt Gilmore Project – Recent Results

    Geology + Copper 21.6 %Cu 361 ppmAg Mt Gilmore Project – Recent Results in Soils Image 0.17 g/t Au 0.64 %Cu 176 ppmCo 0.78 %Cu GEOCHEMICAL ANOMALIES UNDERPINNED 294 ppmMo 148 ppmCo 0.12 g/tAu BY HIGH-TENOR ROCK SAMPLES 10.75 %Cu 180 ppmCo 0.41 %Cu  The recognition that numerous historical small 0.1

  12. Slide 12: Mt Gilmore Project – Sulphides Outcrop

    Geology + Copper Mt Gilmore Project – Sulphides Outcrop in Soils Image MAY QUEEN TARGET Initial field checks identify strong propylitic alteration - chlorite (Chl), magnetite (Mag), epidote (EPI) and sulphide mineralisation - chalcopyrite (CPY), pyrite (PY) and pyrrhotite (PYH). 12

  13. Slide 13: Mt Gilmore Exploration – Several Substantial Priority Anomalies

    Mt Gilmore Exploration – Several Substantial Priority Anomalies FAVOURABLE GEOLOGICAL SETTING May Queen Cu-Co-Ag-Zn-Mo-Bi-Se-In-Cd-Ga+As-Sb  Hydrothermally altered basaltic and volcano- sedimentary basement rocks Lantana  Hydrothermal event associated with a mafic Cu-Co-Ag-Zn-As-Au-Sb-Mo-Bi-Se-In-

  14. Slide 14: Mt Gilmore Trend – Strong Multi-Element Association

    Mt Gilmore Trend – Strong Multi-Element Association COPPER COBALT SILVER Soil Sampling Assay Images Geochemical images generated from a dataset only containing ME-MS61 assays, subset on a 200m x 200m grid with image using a north-eastern sun-angle 14 Cobalt data is further subset to exclude soils po

  15. Slide 15: Mt Gilmore Project – Overview

    Mt Gilmore Project – Overview UNIQUE - EARLY STAGE - DISTRICT-SCALE EXPLORATION PLAY  Surface mineralisation supports evidence of a large hydrothermal system at Mt Gilmore  Indicative of “Intrusive Related” or “Replacement” style of deposits  The size of the geochemical anomalies are substantive

  16. Slide 16: Corazon – Way Forward

    Corazon – Way Forward RIGHT COMMODITIES – PERFECT TIMING  Mt Gilmore Copper-Cobalt-Silver-Gold Sulphide Project  Early stage, district scale copper play with strong cobalt signature  Several compelling targets for copper-cobalt sulphide deposits  Geophysics to test large geochemical anomalies fo

  17. Slide 17: Appendix: Lynn Lake Project

    Appendix LYNN LAKE PROJECT Nickel-Copper-Cobalt Sulphide Canada LEVEL 1, 329 HAY ST, SUBIACO WA 6008 | PO BOX 8187, SUBIACO EAST WA 6008 | +61(8) 6142 6366 | INFO@CORAZON.COM.AU | WWW.CORAZON.COM.AU 1 17

  18. Slide 18: Lynn Lake Project

    Lynn Lake Project Manitoba Province – Canada PROJECT SUMMARY - CLASS 1 NICKEL - HOT COMMODITY  Project focused on key demand-driven commodities for booming rechargeable battery sector  Strategically located in North America  Long-lived proven historical mining centre – closed in 1976  Excellent

  19. Slide 19: Lynn Lake Nickel-Copper-Cobalt Sulphide Project

    Lynn Lake Nickel-Copper-Cobalt Sulphide Project PROLIFIC HISTORICAL MINING CENTRE  100% controlled(1) by Corazon Renewed focus on  Big system – multiple orebodies Lynn Lake’s  Excellent infrastructure – power, water & township development potential DEVELOPMENT POTENTIAL  New JORC Resources (ASX

  20. Slide 20: Lynn Lake – New High-Value Concentrate

    Lynn Lake – New High-Value Concentrate EXCEPTIONAL METALLURGICAL RESULTS A “GAME-CHANGER” FOR THE PROJECT  For the first time – separate high-value Copper and Nickel/Cobalt concentrates have been produced  Excellent grades and recoveries – on-going work will deliver improvements  Nickel concentra

  21. Slide 21: Lynn Lake Nickel-Copper-Cobalt Sulphide Project

    Lynn Lake Nickel-Copper-Cobalt Sulphide Project HISTORICAL PRODUCTION MODERN DISCOVERIES A Plug Mine Tango - 2010 18Mt @ 0.88% Ni + 0.47% Cu 17m @ 0.6% Ni & 0.30% Cu EL Plug Mine A Plug Disco - 2008 1.9Mt @ 2.4% Ni + 1.15% Cu 18m @ 1.5% Ni, 0.70% Cu & EL Plug 0.04 %Co JORC RESOURCE EL Deeps - 2011 (

  22. Slide 22: Lynn Lake – Extensive Resource Base & Potential

    Lynn Lake – Extensive Resource Base & Potential LARGE RESOURCE – FOUNDATION FOR DEVELOPMENT  A further 11 deposits yet to be reviewed for remnant resources  Modern discoveries within mining centre prove additional potential JORC Base Cut Tonnes Tonnes Ni % Cu % Co % Category Ni % Ni Cu Co Indicate

  23. Slide 23: Lynn Lake Exploration – In the Shadow of a Headframe

    Lynn Lake Exploration – In the Shadow of a Headframe ONE OF THE BEST NICKEL SULPHIDE EXPLORATION PLAYS IN NORTH AMERICA  Abundant drill defined mineralisation within Mining Centre outside of resource area Drilling at FLC - 2017  11 deposits yet to be reviewed for remnant tonnages  Regionally, num

  24. Slide 24: Competent Person Statement

    Competent Person Statement The information in this report that relates to Exploration Results and Targets is based on information compiled by Mr. Brett Smith, B.Sc Hons (Geol), Member AusIMM, Member AIG and an employee of Corazon Mining Limited. Mr. Smith has sufficient experience that is relevant t

  25. Slide 25: Contact

    CONTACT Level 1, 329 Hay St, SUBIACO WA 6008 PO Box 8187, SUBIACO EAST WA 6008 +61(8) 6142 6366 info@corazon.com.au www.corazon.com.au 1 25

Corazon Mining — RIU Resources Conference 2019 on 6ix