Moho Resources Ltd. · ASX:MOH

Moho Resources — Investor Presentation (November 2020)

15 slides from Moho Resources's investor presentation, Nov 11, 2020

  1. Slide 1: The Mohorovicic Discontinuity

    THE MOHOROVICIC DISCONTINUITY: THE BOUNDARY SEPARATING THE CRUST & MANTLE OF THE EARTH ACROSS WHICH SEISMIC WAVES CHANGE VELOCITIES INVESTOR PRESENTATION – November 2020

  2. Slide 2: Disclaimer

    This presentation is not a prospectus nor an offer or inducement to subscribe for shares in Moho Resources Ltd (Moho) and has not been lodged with the Australian Securities and Investments Commission. Except for any liability which cannot be excluded by law, Moho and its affiliates expressly disclai

  3. Slide 3: Key Objectives

    KEY OBJECTIVIES • Increase share price through successful exploration • Maximise shareholder value through early stage cashflow generation • Minimise shareholder dilution by becoming a self-funded explorer

  4. Slide 4: Tight Capital Structure

    CAPITAL STRUCTURE SHARES OPTIONS 75M 27M On Issue (100%)* (100%)**** Share Price $0.115** Option Price $0.035*** Market Cap ~ $8.6M Top 20 ~33% *Total number at COB 9 Nov 2020 **Share price at COB 9 Nov 2020 ***Option price at COB 9 Nov 2020 ****Options include director performance milestones TIGHT

  5. Slide 5: Experienced Board & Technical Team

    EXPERIENCED BOARD & TECHNICAL TEAM • DIRECTORS • Terry Streeter (Non-Exec Chairman) • Shane Sadleir (Managing Director) - Geoscientist • Ralph Winter (Commercial Director) – Corporate • Adrian Larking (Non-Exec Director) - Geologist & Lawyer • TECHNICAL TEAM • Robert (Bob) Affleck (Exploration Manag

  6. Slide 6: Window of Opportunity

    WINDOW OF OPPORTUNITY • current high gold price (~A$2,600/oz) • granted mining tenements prospective for gold mineralisation • proximity to existing gold mining infrastructure and toll treatment facilities • mining-friendly government and community in WA 6

  7. Slide 7: Projects

    PROJECTS • Focus on Gold in WA & QLD • Exposure to Nickel in prospective ground holdings around Poseidon’s Black Swan Nickel Operations 7

  8. Slide 8: Empress Springs (QLD)

    EMPRESS SPRINGS (QLD) – Au EXPLORING WORLD CLASS DEPOSITS MOHO’S COMPANY MAKER • Exploration for giant gold deposits under cover in virgin area • Moho discovered 3 separate mineralised areas • Moho holds most of the prospective ground (> 2,300km2 ) • 20 km south of Croydon Goldfield (1.2M oz histori

  9. Slide 9: Burracoppin (WA)

    BURRACOPPIN (WA) - Au NEW DISCOVERY IN GREENSTONE BELT • Gold/silver mineralisation discovered by Moho in bedrock • In wheatbelt ~20km west of Edna May • On structural trend to Tampia gold deposit • Follow-up drilling planned Q1 2021 9

  10. Slide 10: Exploring For Company Makers

    EXPLORING FOR COMPANY MAKERS HOW DO WE GET THERE? • Mining studies towards gold production potential at 100% owned East Sampson Dam • Ramping up resource definition drilling at East Sampson Dam • Exploration drilling planned for additional resources at Silver Swan North project 10

  11. Slide 11: Silver Swan North Gold Project

    Silver Swan North Gold Project (WA) Near Kalgoorlie • Potential for early stage cashflow • Extensive Land holding ~102km2 (100% ownership) • Gold mineralisation at East Sampson Dam • High grade gold intersections on granted mining lease • Close proximity to mining infrastructure 11

  12. Slide 12: Ideally Located To Mining Infrastructure

    Ideally Located to Mining Infrastructure • 50km from Australia’s gold mining capital at Kalgoorlie • 11 gold processing plants within 100km • Abundance of mining infrastructure, skills and services 12

  13. Slide 13: Exploration Prioritised Towards Early Gold Production

    Exploration Prioritised Towards Early Gold Production • Infill RC and diamond drill programs for maiden JORC 11km Resource and Scoping Study at East Sampson Dam (ESD) within granted mining lease M27/263 • Aircore drilling to test gold auger anomalies on M27/263 over 2.5km • Surface sampling confirms

  14. Slide 14: Gold Mining Investigations Underway

    GOLD MINING INVESTIGATIONS UNDERWAY • Excellent preliminary metallurgical results & Phase 1 RC drilling completed – Aug 2020 • Flora and Fauna survey completed - no environmental impediments identified • Aboriginal heritage survey completed – no sites of cultural or archaeological significance ident

  15. Slide 15: On Track To Become Self Funded Explorer And Producer

    ON TRACK TO BECOME SELF FUNDED EXPLORER AND PRODUCER Cashflow from East Sampson Dam gold production will enable exploration for company maker gold deposits 15

Moho Resources — Investor Presentation (November 2020) on 6ix