Ksb Ltd. · NSE:KSB

Ksb — Investor Presentation (August 2026)

49 slides from Ksb's investor presentation, Aug 19, 2026

  1. Slide 1: Intimation of Presentation for Investors Meet

    19th August, 2026 The General Manager The Manager The Corporate Relationship Department Listing Department BSE Limited National Stock Exchange of India 1st floor, New Trading Ring, Limited Rotunda Building “Exchange Plaza”, C-1, Block G P J Towers Bandra-Kurla Complex Dalal Street, Fort Bandra (E) M

  2. Slide 2: Institutional Investor's Meet

    Solutions. For Life. Institutional Investor’s Meet 19th August 2026 Investors' Meet 19.08.2026

  3. Slide 3: Cautionary Statement

    CAUTIONARY STATEMENT Cautionary Statement Regarding Forward-Looking Statements This presentation may contain certain forward-looking statements relating to the Company’s future business, developments and economic performance. Such statements may be subject to a number of risks, uncertainties and oth

  4. Slide 4: KSB India – Snapshot

    KSB India – Snapshot 3 Investors' Meet 19.08.2026

  5. Slide 5: KSB India Milestones

    KSB India Milestones 4 Inception Of Inception of Inception of KSB Group Acquired Inception Of Foundry- Captive Valves Division MIL Controls Ltd New Shed at Energy Pumps Division Ferrous & Non-ferrous Casting Gate, Globe & Check valves Control Valves (Kochi) (Shirwal) Shirwal Plant (Vambori) (Coimbat

  6. Slide 6: Presence of KSB in India

    PRESENCE OF KSB IN INDIA 5 KSB Limited Bangladesh  Established – 1960  HQ. – Dhaka, Bangladesh  HQ. – Pune, Maharashtra  Liaison Office.  Network – 6 manufacturing plants 4 zonal offices 6 Service Stations 14 branch offices 350+ service centres 800+ Authorized dealers KSB Limited 22 warehouses

  7. Slide 7: KSB India - Manufacturing Facilities

    KSB India - Manufacturing Facilities 6 Pimpri, Pune (HQ & Head office, Industrial Pump Division) Vambori (Foundry Division) 6 Chinchwad, Pune (SupremeServ Division) Coimbatore, (Valves Division) Investors' Meet 19.08.2026

  8. Slide 8: KSB India - Manufacturing Facilities

    KSB India - Manufacturing Facilities 7 Water Pump Division Nashik (Standard Pump) Kochi (HQ & Factory MIL) Shirwal, Satara (Energy Pump Division), 60 km from Pune New Shed at Shirwal plant Investors' Meet 19.08.2026

  9. Slide 9: Management Team

    MANAGEMENT TEAM 8 *Names from Left to Right Mr. Nitin Patil – Vice President IPD & EPD Operations & Chief Operating Officer – Nuclear Business for Pumps Mr. Mohan Patil – Vice President Human Resource Mr. Rajeev Jain – Managing Director Mr. Mahesh Bhave – Chief Finance Officer, Vice President Financ

  10. Slide 10: KSB Limited – Board of Directors

    KSB LIMITED – BOARD OF DIRECTORS 9 Dr. Stephan Bross, Dr. Matthias Schmitz, Mr. Rajeev Jain, Mr. Gaurav Swarup, Non Independent and Non Independent and Chairman Managing Director Non-executive Director Non-executive Director  Associated with KSB from FY  Associated with KSB from FY  Associated wi

  11. Slide 11: KSB Limited – Board of Directors

    KSB LIMITED – BOARD OF DIRECTORS 10 Mr. Ulhas Yargop , Mr. U. C. Muktibodh, Ms. Sharmila Barua Mr. Vishal Kampani, Independent Director Independent Director Roychowdhury, Independent Director Independent Director  Associated with KSB since FY  Associated with KSB since FY  Associated with KSB sin

  12. Slide 12: Financial Performance

    Financial Performance Investors' Meet 19.08.2026

  13. Slide 13: Financial Snapshot

    Financial Snapshot 12 Revenue from Sales EBITDA Profit Before Tax (MINR) (MINR) (MINR) 12,920 Half Year ended 1,465 Half Year ended 1,279 Half Year ended 30th June 2026 30th June 2026 30th June 2026 12,621 1,707 1,607 Half Year ended Half Year ended Half Year ended 30th June 2025 30th June 2025 30th

  14. Slide 14: Consistent Performance Indicators

    Consistent Performance Indicators 13 Revenue from Operations (MINR) PAT (MINR) 26,957 2,645 25,331 2,409 22,472 2,046 18,220 1,793 14,973 1,466 12,081 12,920 973 969 2020 2021 2022 2023 2024 2025 Jun-26 2020 2021 2022 2023 2024 2025 Jun-26 EBITDA (MINR) 3,873 3,503 3,096 2,695 2,235 1,776 1,465 2020

  15. Slide 15: Consistent Value Creation for Investors

    Consistent Value Creation for Investors 14 Net Worth (MINR) EPS (Adjusted Post Split) 15.2 16,128 16,315 13.8 14,251 12,478 11.8 10,931 10.3 9,641 8.4 8,464 5.6 5.57 2020 2021 2022 2023 2024 2025 Jun-26 2020 2021 2022 2023 2024 2025 Jun-26 ROCE % Dividend % For Financial Year 22.97 23.20 23.42 22.8

  16. Slide 16: SAP S/4HANA Update

    SAP S/4HANA Update 15 01 Implementation underway ENTERPRISE PLATFORM The KSB Group is implementing SAP S/4HANA platform and expected to go live in H1 of FY 2027. 02 Benefits KSB GROUP i. Real time insights - faster and data driven decisions ii. Process automation - Higher efficiency, lower manual ef

  17. Slide 17: Business Highlights

    Business Highlights Investors' Meet 19.08.2026

  18. Slide 18: Fields of applications for our products

    Fields of applications for our products 17 ENERGY BUILDING SERVICES GENERAL INDUSTRY PETROCHEMICALS / MINING WATER CHEMICALS 6 market areas 21 submarkets Investors' Meet 19.08.2026

  19. Slide 19: Consistent Growth in Order Intake

    Consistent Growth in Order Intake (Average OI per Month) 18 (Domestic + Exports) W/o Nuclear (In MINR) 2493 2552 1993 2027 1707 2022 2023 2024 2025 YTD June 2026 Total OI H1 2026 W/o Nuclear : 15,307 MINR With Nuclear : 15,528 MINR Investors' Meet 19.08.2026

  20. Slide 20: Strong Orders On Hand, Supporting Future Growth

    Strong Orders On Hand, Supporting Future Growth 19 27,445 25,848 22,503 21,442 31st Dec'23 31st Dec'24 31st Dec'25 Jun-26 Total Orders On Hand (MINR) Investors' Meet 19.08.2026

  21. Slide 21: Order Intake Overview: Distribution of Domestic Business

    Order Intake Overview: Distribution of Domestic Business 20 19% Valves 14% 51% Engineered Pumps Standard pumps 16% SupremeServ Investors' Meet 19.08.2026

  22. Slide 22: Export Business

    Export Business Export Business 21 Order Intake (In MINR) 5141 3823 3081 2708 2288 1973 2021 2022 2023 2024 2025 YTD June 2026 Note : Order Intake excludes Nuclear exports. Investors' Meet 19.08.2026

  23. Slide 23: Key Growth Drivers

    Key Growth Drivers Investors' Meet 19.08.2026

  24. Slide 24: Key Growth Drivers – i. Energy (Conventional)

    Key Growth Drivers – i. Energy (Conventional) 23 Key Order Wins 01 Boiler Feed Pump (BFP) Packages for Thermal Power 02 Condensate Transfer Pump (CTP) Packages for Power Projects Generation Applications 03 Refinery & Hydrocarbon Processing Pump Packages 04 First Localized LUV / Boiler Circulation Pu

  25. Slide 25: Key Growth Drivers – ii. Water/Waste water

    24 Key Growth Drivers – ii. Water/Waste water Key Order Wins 01 Municipal Water Supply & Distribution Projects 02 Desalination Applications 03 04 Strengthened presence in sustainable water Rural Water Supply & Infrastructure Projects management & infrastructure investments Product Portfolio Waste Wa

  26. Slide 26: Key Growth Drivers – iii. Commercial Building Services

    25 Key Growth Drivers – iii. Commercial Building Services Key Order Wins 01 Metro Rail & Urban Infrastructure Projects 02 Commercial Real Estate Developments 03 Residential Township & Mixed-Use Projects 04 Large Institutional & Building Services Applications Product Portfolio Firefighting Pressure B

  27. Slide 27: Key Growth Drivers – iv. Petrochemical

    Key Growth Drivers – iv. Petrochemical 26 Key Order Wins 01 Gas Separation & Processing Applications 02 Petrochemical Capacity Expansion Projects 03 04 Strengthened presence in large-scale domestic and Refinery Process Pump Applications international petrochemical investments Product Portfolio CHTRa

  28. Slide 28: Emerging Segments

    Emerging Segments Investors' Meet 19.08.2026

  29. Slide 29: Emerging Segments – i. Marine Business

    Emerging Segments – i. Marine Business 28 Key Order Wins 01 Commercial Shipbuilding Applications 02 Battery-Electric & Green Marine Propulsion Projects Growing Presence in India's Marine & Shipbuilding 03 Coast Guard Vessel Applications 04 Sector Product Portfolio ILN / ILNC / ILNR AU / AU-Monobloc

  30. Slide 30: Emerging Segments – ii. New Technologies

    Emerging Segments – ii. New Technologies 29 Key Order Wins 01 Green Hydrogen 02 Railways Electrolyser & Hydrogen Infrastructure Applications Railway Propulsion & Traction Applications Hydrogen Production & Processing Systems Transportation Electrification Projects 03 Renewable Energy 04 Strategic pa

  31. Slide 31: Emerging Segments – iii. Data Centre

    Emerging segments- iii. Data Centre 30 Key Order Wins Leading OEM  Data Centre Cooling Infrastructure  Precision Thermal Management Applications Commercial Building Services  Mission-Critical Water Circulation Systems  Strengthened participation in hyperscale and enterprise Data Centre developme

  32. Slide 32: Energy / Nuclear Segment Highlights

    Energy / Nuclear Segment Highlights Investors' Meet 19.08.2026 Investors' Meet 19.08.2026

  33. Slide 33: State of the Art Facility

    State of the Art Facility 32 • Dedicated Nuclear Organization. • Qualified quality manpower including level 3 qualifications & ASME section III NB requirements • First pump company to get Plant established in 2017 with the site size of ISO 19443 (ITNS- Important To Nuclear safety) 1,00,000 sq mt. ce

  34. Slide 34: Shop Glimpses : Manufacturing Excellence

    Shop Glimpses : Manufacturing Excellence 33 Machine Shop Test Field Shop Assembly Shop Investors' Meet 19.08.2026

  35. Slide 35: Segments Catered Through EPD Plant

    Segments Catered Through EPD Plant 34 Major segments catered : • Nuclear power plant • Thermal power plant • Oil and Gas industry Investors' Meet 19.08.2026

  36. Slide 36: Shirwal Capacity Expansion : Construction of Additional Shed

    Shirwal Capacity Expansion : Construction of Additional Shed 35 Large-scale production shed Facility inauguration Expanded manufacturing footprint at Shirwal Projected Capacity Addition of 20% Investors' Meet 19.08.2026

  37. Slide 37: Product Gallery

    Product Gallery Investors' Meet Investors' 19.08.2026 Meet 19.08.2026

  38. Slide 38: KSB has Products for every Nuclear Application

    KSB has Products for every Nuclear Application 37 Pressurised Water Reactor Boiling Water Reactor Small Modular Reactor Molten Salt Reactor Lead Cooled Fast Reactor Sodium Cooled Liquid –Metal Reactor Investors'Investors' Meet 19.08.2026 Meet 19.08.2026

  39. Slide 39: Primary & Secondary Circuit

    Primary & Secondary Circuit 38 Products for every Application Primary circuit  Reactor coolant recirculation RTS Turbine driven pump  Emergency cooling and residual heat removal RUV reactor coolant RER / RSR  Safety injection LUV reactor water pump reactor coolant pump RHM high-pressure charging

  40. Slide 40: Products for Energy Sector

    Products for Energy Sector 39 WKTA/ WKTB: Pumps for KWPK: Slurry recirculation CHTR: Suitable for boiler-feed CHTD: Suitable for boiler-feed YNK: Pump for Boiler Condensate extraction and pump used in Flue Gas water water for super critical power Feed application transfer in power plants up to Desul

  41. Slide 41: Nuclear Journey

    Nuclear Journey Investors' Meet 19.08.2026

  42. Slide 42: KSB India's Nuclear Journey

    41 KSB India’s Nuclear Journey • India Journey – 5 decades at Glance Progressive Localisation for various projects from 220 Mwe to 700 Mwe 1977 1978 1982 1983 1989 1990 Tripartite Agreement DAE Commissioned the Primary coolant Primary Heat Transport Primary Heat Transport , KSB Germany and KSB Prima

  43. Slide 43: Primary Coolant Pumps – Indian Reference

    Primary Coolant Pumps – Indian Reference 42 220 Mwe PHWR Narora 1 & 2 Kakrapara 1 & 2 Rawatbhata 3 – 6 Kaiga 1 – 4 540 Mwe / 700 Mwe PHWR Tarapur 3-4 Kakrapara 3 & 4 Rawatbhata 7 & 8 700Mwe PHWR Under Manufacturing GHAVP 1 & 2 Kaiga 5 & 6 Investors' Meet 19.08.2026

  44. Slide 44: Business Outlook

    Business Outlook Investors' Meet 19.08.2026

  45. Slide 45: Orders on Hand (OOH) Nuclear: A Long Term Growth Engine

    Orders on Hand (OOH) Nuclear : A Long Term Growth Engine 44 MINR 12,828 13,131 12,354 9,687 Dec-23 Dec-24 Dec-25 Jun-26 Orders on Hand include pumps for KSB Limited's entry into the substantial export market for nuclear pumps and involves the supply of eight Critical Safety Class 2 Pumps for two uni

  46. Slide 46: Investors' Meet 19.08.2026

    45 ~ 23 Investors'Investors' Meet 19.08.2026 Meet 19.08.2026

  47. Slide 47: India's Nuclear Roadmap

    India’s Nuclear Roadmap 46 • 8 reactors (6.6 GW) under construction • 10 reactors (7 GW) in pre-project stage Expansion • Target: 22,480 MW by 2031-32 Plans • Long-Term Goal: 100 GW by 2047 • ₹20,000 Cr for Small Modular Reactors (SMRs) • 5 indigenous SMRs by 2033 Technological Initiatives • Bharat

  48. Slide 48: Way Forward – India's Nuclear Growth Plan

    Way Forward – India’s Nuclear Growth Plan 47 KSB’s Capability • Invested in its capacity to meet the expectations • Access to all latest designs of NPP technology making complete product basket offering • Has 47 years of experience of executing nuclear projects with stable supply chain • Acquisition

  49. Slide 49: Thank You!

    Investors’ Meet 19th August 2026 : Answering Your Questions! Thank You! Investors' Meet 19.08.2026

KSB — Investor Presentation (August 2026) on 6ix