  1. Slide 1: The Cisco Lithium Project

    Slide 1: The Cisco Lithium Project

    November 2026 THE CISCO LITHIUM PROJECT EEYOU ISTCHEE, JAMES BAY - QUEBEC, CANADA TSX.V: QTWO | OTCQB: QUEXF | FSE: 1 458

  2. Slide 2: Forward-Looking Statement

    Slide 2: Forward-Looking Statement

    CORPORATE DISCLOSURE FORWARD-LOOKING STATEMENT THIS PRESENTATION CONTAINS CERTAIN not undertake any obligations to release publicly any revisions for and legally extracted or produced at the time the mineral reserve FORWARD-LOOKING STATEMENTS updating any voluntary forward-looking statements, except

  3. Slide 3: Our Team

    Slide 3: Our Team

    MANAGEMENT AND BOARD OUR TEAM ALICIA MILNE LEO POWER KEITH PHILLIPS SAGE McCALLUM Executive Chair, Director CEO, President & Director MBA, MOGS, ICD.D P. Geo Independent Director Legal professional with 20+ years of VP Exploration, Director Former CEO of Piedmont Lithium and 30+ years on Wall Street

  4. Slide 4: Share Structure & Performance

    Slide 4: Share Structure & Performance

    Q2 METALS STOCK INFORMATION SHARE STRUCTURE & PERFORMANCE TSX-V: QTWO CASH ON HAND (as of 2026-08-31) ~$70.9 M ISSUED & OUTSTANDING 241.6 M Sprott Lithium Miners ETF (LITP) MARKET CAP (as of 2026-11-07) C ~$380 M 1,429,000 WARRANTS 780K @ C$0.90 (Expiry Aug 2028) 649K @ $2.45 (Expiry May 2029) SHARE

  5. Slide 5: The Cisco: largest spodumene lithium deposit in the northern hemisphere

    Slide 5: The Cisco: largest spodumene lithium deposit in the northern hemisphere

    THE CISCO LITHIUM PROJECT The largest spodumene lithium deposit in the northern hemisphere and fourth largest, globally.

  6. Slide 6: Where is Cisco?

    Slide 6: Where is Cisco?

    ENVIRONMENTAL, SOCIAL & GOVERNANCE WHERE IS CISCO? The total project area covers 801 contiguous mineral claims over 41,253 ha along the Cisco is within the traditional territory Frotet Evans Greenstone Belt. of the Cree Nation of Nemaska Cisco is in the southernmost part of the James Bay region in Q

  7. Slide 7: Location Advantage

    Slide 7: Location Advantage

    CISCO LITHIUM PROJECT LOCATION ADVANTAGE Transportation ▪ The paved, all-season Billy Diamond highway connects Cisco to the CN rail line in Matagami, just 150 km to the south. ▪ Rail connects to international port facilities along the St. Lawrence Seaway. ▪ Rail connects to Bécancour, ~215 km from t

  8. Slide 8: 2026 Mineral Resource Estimate

    Slide 8: 2026 Mineral Resource Estimate

    CISCO LITHIUM PROJECT 2026 MINERAL RESOURCE ESTIMATE Largest spodumene lithium deposit in the western hemisphere & 4th largest, globally Cut-off Mass Li2O Li2O LCE Scenario (% Li2O) (‘000 t) (%) (‘000 t) (‘000 t) Open Pit 0.4 271,575 1.37 3,724 9,208 Inferred Underground 0.7 25,802 1.30 335 829 Tota

  9. Slide 9: Global Peer Comparison

    Slide 9: Global Peer Comparison

    CISCO LITHIUM PROJECT GLOBAL PEER COMPARISON 1.8 SCALE & GRADE Circle size indicates contained Li20 1.7 Greenbushes 1.6 Andover Max 1.5 Pakeagama Lake Shaakichiuwaanann Goulamina Manono Grota do 1.4 Whabouchi Cirilo Bandeira Mount 1.3 Grade (Li2O) Mt. Marion Kathleen Moblan Valley Holland Cisco 1.2

  10. Slide 10: Western Hemisphere Peers

    Slide 10: Western Hemisphere Peers

    CISCO LITHIUM PROJECT WESTERN HEMISPHERE PEERS 1.8 SCALE & GRADE Circle size indicates contained Li20 1.6 PAK & Spark Grota do Whabouchi Cirilo 1.4 Bandeira Kings Grade (Li20 %) Mountain Shaakichiuwaanaan 1.2 Root Colina Galaxy Cisco Carolina Moblan Adina Baixa NAL 1 Grande Rose 0.8 0 50 100 150 200

  11. Slide 11: PEA – Conceptual Pit Shell

    Slide 11: PEA – Conceptual Pit Shell

    CISCO LITHIUM PROJECT PEA – CONCEPTUAL PIT SHELL Priority Target Priority Target North TSX.V: QTWO | OTCQB: QUEXF | FSE: 458 11

  12. Slide 12: Cross Section – Priority Target North

    Slide 12: Cross Section – Priority Target North

    CISCO LITHIUM PROJECT CROSS SECTION – Priority Target North News release: February 24, 2026 TSX.V: QTWO | OTCQB: QUEXF | FSE: 458 12

  13. Slide 13: 2026 PEA Highlights

    Slide 13: 2026 PEA Highlights

    CISCO LITHIUM PROJECT 2026 PEA HIGHLIGHTS Assumptions: US$1647 (FOB Quebec) | 8% Discount | SC5.5 Post-tax NPV Post-tax IRR AISC Total CAPEX C$13.5B 38.7% C$454 / tonne C$2.9B Avg. Production Total Mine Life Payback Period 1.7 Mtpa 28 Years 3.0 years Assumption Value Exchange Rate US$ / $C 1.39 Refe

  14. Slide 14: 2026 PEA Highlights – Sensitivity Analysis

    Slide 14: 2026 PEA Highlights – Sensitivity Analysis

    CISCO LITHIUM PROJECT 2026 PEA HIGHLIGHTS Sensitivity Analysis % Variation -30% -20% -10% Base Case 10% 20% 30% LOM Avg. Price (C$/t) $1,602 $1,831 $2,060 $2,289 $2,518 $2,747 $2,976 SC5.5 FOB (US$/t) $1,152 $1,317 $1,482 $1,647 $1,812 $1,976 $2,141 NPV 6% 10,464 12,931 15,392 17,856 20,308 22,761 2

  15. Slide 15: Opportunities & Next Steps

    Slide 15: Opportunities & Next Steps

    CISCO LITHIUM PROJECT OPPORTUNITIES & NEXT STEPS Geological work: • Continued infill and exploration drilling within the Cisco Deposit area to grow and upgrade the resource base; • District-scale exploration and drilling across the broader project area; • MRE Update: The 2026 MRE drilling completed

  16. Slide 16: Current Field Programs

    Slide 16: Current Field Programs

    CISCO LITHIUM PROJECT CURRENT FIELD PROGRAMS Total drilled as at November 10, 2026: ~69,500 m across 151 holes | 5 drills currently working INFILL & EXPLORATION PROGRAM ▪ Infill drilling of the main Cisco Deposit area. ▪ Exploration drilling targets of potential zones of high-grade and/or near surfa

  17. Slide 17: Metallurgy Work

    Slide 17: Metallurgy Work

    CISCO LITHIUM PROJECT METALLURGY WORK ▪ Spodumene confirmed as the primary lithium-bearing mineral within all pegmatite samples. ▪ Phase 1 of metallurgy test work: three composite samples tested using HLS to confirm the potential suitability of a DMS process: ▪ Composite 18: 74.1% recovery to produc

  18. Slide 18: Community & Environment

    Slide 18: Community & Environment

    ENVIRONMENTAL, SOCIAL & GOVERNANCE COMMUNITY & ENVIRONMENT ▪ Building a foundation for partnership and collaboration. ▪ Consistent and constructive open dialogue and engagement with stakeholders: ▪ Cree Nation of Nemaska and Waswanipi; ▪ Town of Matagami; ▪ Eeyou Istchee James Bay Regional Governmen

  19. Slide 19: Why Q2 Metals

    Slide 19: Why Q2 Metals

    THE INVESTMENT CASE WHY Q2 METALS TIER ONE ASSET – 2026 MRE INFRASTRUCTURE ADVANTAGE ▪ May 2026 Inferred Mineral Resource Estimate: ▪ Highway connects Cisco to the CN rail line in Matagami, 297 Mt grading 1.36% Li20 just 150 km to the south ▪ Additional Exploration Target: ▪ Rail leads to internatio

  20. Slide 20: Appendix

    Slide 20: Appendix

    Appendix 20

  21. Slide 21: Global Peer Resources / Reserves

    Slide 21: Global Peer Resources / Reserves

    NOTES Global Peer Resources / Reserves Company Project & Link Stage Source Zijin Manono Development 2024 News Release Pilbara Pilgaangora Production 2025 Annual Report IGO Greenbushes Production 2025 News Release Ganfeng Goulamina Production 2024 News Release Sociedad Quimica y Min. de Chile SA Mt.H

  22. Slide 22: Industry Leading Intervals

    Slide 22: Industry Leading Intervals

    CISCO LITHIUM PROJECT INDUSTRY LEADING INTERVALS Mineralization starts at surface to an average depth of 400 metres and remains open in all directions. ▪ CS-24-018: 215.6 m at 1.69% Li2O 65 ▪ CS-24-021: 347.1 m at 1.35% Li2O 36 ▪ CS-24-023: 188.6 m at 1.56% Li2O 21 ▪ CS-25-027: 179.6 m at 1.66% Li2O

  23. Slide 23: Industry Leading Intervals

    Slide 23: Industry Leading Intervals

    CISCO LITHIUM PROJECT INDUSTRY LEADING INTERVALS Mineralization starts at surface to an average depth of 457.4m @ 1.65% 400 metres and remains open in all directions. 107.4m @ 1.87% 109.5m @ 1.67% 800 108.5m @ 1.62% ▪ CS-24-018: 215.6 m at 1.69% Li2O (364.4%-m) 71m @ 1.84% 121.6m @ 1.45% 347m @ 1.35

  24. Slide 24: Q2 Metals Corp. Contact

    Slide 24: Q2 Metals Corp. Contact

    CONTACT Q2 METALS CORP. Alicia Milne Sage McCallum President, CEO & Director VP Exploration & Director AlMilne@Q2metals.com SMcCallum@Q2metals.com Chris Ackerman Jason McBride Corporate Development Manager, Investor Relations CAckerman@Q2metals.com JMcBride@Q2metals.com TSX.V: QTWO | OTCQB: QUEXF |