Slide 1: The Cisco Lithium Project
November 2026 THE CISCO LITHIUM PROJECT EEYOU ISTCHEE, JAMES BAY - QUEBEC, CANADA TSX.V: QTWO | OTCQB: QUEXF | FSE: 1 458

Slide 2: Forward-Looking Statement
CORPORATE DISCLOSURE FORWARD-LOOKING STATEMENT THIS PRESENTATION CONTAINS CERTAIN not undertake any obligations to release publicly any revisions for and legally extracted or produced at the time the mineral reserve FORWARD-LOOKING STATEMENTS updating any voluntary forward-looking statements, except

Slide 3: Our Team
MANAGEMENT AND BOARD OUR TEAM ALICIA MILNE LEO POWER KEITH PHILLIPS SAGE McCALLUM Executive Chair, Director CEO, President & Director MBA, MOGS, ICD.D P. Geo Independent Director Legal professional with 20+ years of VP Exploration, Director Former CEO of Piedmont Lithium and 30+ years on Wall Street

Slide 4: Share Structure & Performance
Q2 METALS STOCK INFORMATION SHARE STRUCTURE & PERFORMANCE TSX-V: QTWO CASH ON HAND (as of 2026-08-31) ~$70.9 M ISSUED & OUTSTANDING 241.6 M Sprott Lithium Miners ETF (LITP) MARKET CAP (as of 2026-11-07) C ~$380 M 1,429,000 WARRANTS 780K @ C$0.90 (Expiry Aug 2028) 649K @ $2.45 (Expiry May 2029) SHARE

Slide 5: The Cisco: largest spodumene lithium deposit in the northern hemisphere
THE CISCO LITHIUM PROJECT The largest spodumene lithium deposit in the northern hemisphere and fourth largest, globally.

Slide 6: Where is Cisco?
ENVIRONMENTAL, SOCIAL & GOVERNANCE WHERE IS CISCO? The total project area covers 801 contiguous mineral claims over 41,253 ha along the Cisco is within the traditional territory Frotet Evans Greenstone Belt. of the Cree Nation of Nemaska Cisco is in the southernmost part of the James Bay region in Q

Slide 7: Location Advantage
CISCO LITHIUM PROJECT LOCATION ADVANTAGE Transportation ▪ The paved, all-season Billy Diamond highway connects Cisco to the CN rail line in Matagami, just 150 km to the south. ▪ Rail connects to international port facilities along the St. Lawrence Seaway. ▪ Rail connects to Bécancour, ~215 km from t

Slide 8: 2026 Mineral Resource Estimate
CISCO LITHIUM PROJECT 2026 MINERAL RESOURCE ESTIMATE Largest spodumene lithium deposit in the western hemisphere & 4th largest, globally Cut-off Mass Li2O Li2O LCE Scenario (% Li2O) (‘000 t) (%) (‘000 t) (‘000 t) Open Pit 0.4 271,575 1.37 3,724 9,208 Inferred Underground 0.7 25,802 1.30 335 829 Tota

Slide 9: Global Peer Comparison
CISCO LITHIUM PROJECT GLOBAL PEER COMPARISON 1.8 SCALE & GRADE Circle size indicates contained Li20 1.7 Greenbushes 1.6 Andover Max 1.5 Pakeagama Lake Shaakichiuwaanann Goulamina Manono Grota do 1.4 Whabouchi Cirilo Bandeira Mount 1.3 Grade (Li2O) Mt. Marion Kathleen Moblan Valley Holland Cisco 1.2

Slide 10: Western Hemisphere Peers
CISCO LITHIUM PROJECT WESTERN HEMISPHERE PEERS 1.8 SCALE & GRADE Circle size indicates contained Li20 1.6 PAK & Spark Grota do Whabouchi Cirilo 1.4 Bandeira Kings Grade (Li20 %) Mountain Shaakichiuwaanaan 1.2 Root Colina Galaxy Cisco Carolina Moblan Adina Baixa NAL 1 Grande Rose 0.8 0 50 100 150 200

Slide 11: PEA – Conceptual Pit Shell
CISCO LITHIUM PROJECT PEA – CONCEPTUAL PIT SHELL Priority Target Priority Target North TSX.V: QTWO | OTCQB: QUEXF | FSE: 458 11

Slide 12: Cross Section – Priority Target North
CISCO LITHIUM PROJECT CROSS SECTION – Priority Target North News release: February 24, 2026 TSX.V: QTWO | OTCQB: QUEXF | FSE: 458 12

Slide 13: 2026 PEA Highlights
CISCO LITHIUM PROJECT 2026 PEA HIGHLIGHTS Assumptions: US$1647 (FOB Quebec) | 8% Discount | SC5.5 Post-tax NPV Post-tax IRR AISC Total CAPEX C$13.5B 38.7% C$454 / tonne C$2.9B Avg. Production Total Mine Life Payback Period 1.7 Mtpa 28 Years 3.0 years Assumption Value Exchange Rate US$ / $C 1.39 Refe

Slide 14: 2026 PEA Highlights – Sensitivity Analysis
CISCO LITHIUM PROJECT 2026 PEA HIGHLIGHTS Sensitivity Analysis % Variation -30% -20% -10% Base Case 10% 20% 30% LOM Avg. Price (C$/t) $1,602 $1,831 $2,060 $2,289 $2,518 $2,747 $2,976 SC5.5 FOB (US$/t) $1,152 $1,317 $1,482 $1,647 $1,812 $1,976 $2,141 NPV 6% 10,464 12,931 15,392 17,856 20,308 22,761 2

Slide 15: Opportunities & Next Steps
CISCO LITHIUM PROJECT OPPORTUNITIES & NEXT STEPS Geological work: • Continued infill and exploration drilling within the Cisco Deposit area to grow and upgrade the resource base; • District-scale exploration and drilling across the broader project area; • MRE Update: The 2026 MRE drilling completed

Slide 16: Current Field Programs
CISCO LITHIUM PROJECT CURRENT FIELD PROGRAMS Total drilled as at November 10, 2026: ~69,500 m across 151 holes | 5 drills currently working INFILL & EXPLORATION PROGRAM ▪ Infill drilling of the main Cisco Deposit area. ▪ Exploration drilling targets of potential zones of high-grade and/or near surfa

Slide 17: Metallurgy Work
CISCO LITHIUM PROJECT METALLURGY WORK ▪ Spodumene confirmed as the primary lithium-bearing mineral within all pegmatite samples. ▪ Phase 1 of metallurgy test work: three composite samples tested using HLS to confirm the potential suitability of a DMS process: ▪ Composite 18: 74.1% recovery to produc

Slide 18: Community & Environment
ENVIRONMENTAL, SOCIAL & GOVERNANCE COMMUNITY & ENVIRONMENT ▪ Building a foundation for partnership and collaboration. ▪ Consistent and constructive open dialogue and engagement with stakeholders: ▪ Cree Nation of Nemaska and Waswanipi; ▪ Town of Matagami; ▪ Eeyou Istchee James Bay Regional Governmen

Slide 19: Why Q2 Metals
THE INVESTMENT CASE WHY Q2 METALS TIER ONE ASSET – 2026 MRE INFRASTRUCTURE ADVANTAGE ▪ May 2026 Inferred Mineral Resource Estimate: ▪ Highway connects Cisco to the CN rail line in Matagami, 297 Mt grading 1.36% Li20 just 150 km to the south ▪ Additional Exploration Target: ▪ Rail leads to internatio

Slide 20: Appendix
Appendix 20

Slide 21: Global Peer Resources / Reserves
NOTES Global Peer Resources / Reserves Company Project & Link Stage Source Zijin Manono Development 2024 News Release Pilbara Pilgaangora Production 2025 Annual Report IGO Greenbushes Production 2025 News Release Ganfeng Goulamina Production 2024 News Release Sociedad Quimica y Min. de Chile SA Mt.H

Slide 22: Industry Leading Intervals
CISCO LITHIUM PROJECT INDUSTRY LEADING INTERVALS Mineralization starts at surface to an average depth of 400 metres and remains open in all directions. ▪ CS-24-018: 215.6 m at 1.69% Li2O 65 ▪ CS-24-021: 347.1 m at 1.35% Li2O 36 ▪ CS-24-023: 188.6 m at 1.56% Li2O 21 ▪ CS-25-027: 179.6 m at 1.66% Li2O

Slide 23: Industry Leading Intervals
CISCO LITHIUM PROJECT INDUSTRY LEADING INTERVALS Mineralization starts at surface to an average depth of 457.4m @ 1.65% 400 metres and remains open in all directions. 107.4m @ 1.87% 109.5m @ 1.67% 800 108.5m @ 1.62% ▪ CS-24-018: 215.6 m at 1.69% Li2O (364.4%-m) 71m @ 1.84% 121.6m @ 1.45% 347m @ 1.35

Slide 24: Q2 Metals Corp. Contact
CONTACT Q2 METALS CORP. Alicia Milne Sage McCallum President, CEO & Director VP Exploration & Director AlMilne@Q2metals.com SMcCallum@Q2metals.com Chris Ackerman Jason McBride Corporate Development Manager, Investor Relations CAckerman@Q2metals.com JMcBride@Q2metals.com TSX.V: QTWO | OTCQB: QUEXF |
Source: company website
More decks from Q2 Metals Corp
Investor Presentation (November 2026)21 slides · November 2026
Investor Presentation (October 2026)28 slides · October 2026
Investor Presentation (September 2026)31 slides · September 2026
Investor Presentation (July 2023)17 slides · July 2023
Investor Presentation (May 2023)14 slides · May 2023
Investor Presentation (March 2023)14 slides · March 2023