Q2 Metals Corp · TSXV:QTWO

Q2 Metals — Investor Presentation (November 2026)

21 slides from Q2 Metals's investor presentation, November 2026

  1. Slide 1: The Cisco Lithium Project

    Slide 1: The Cisco Lithium Project

    November 2026 THE CISCO LITHIUM P ROJE CT EEYOU ISTCHEE, JAMES BAY - QUEBEC, CANADA TSX.V: QTWO | OTCQB: QUEXF | FSE: 1 458

  2. Slide 2: Forward-Looking Statement

    Slide 2: Forward-Looking Statement

    C OR PO RA TE DI SC LOS URE FORWARD-LOOKING STATEMENT THIS PRESENTATION CONTAINS CERTAIN not undertake any obligations to release publicly any revisions for and legally extracted or produced at the time the mineral reserve FORWARD-LOOKING STATEMENTS updating any voluntary forward-looking statements,

  3. Slide 3: The Cisco Lithium Project

    Slide 3: The Cisco Lithium Project

    THE CISCO LITHIUM PROJECT Largest spodumene lithium resource in the Western Hemisphere and among the largest, globally.

  4. Slide 4: Why Cisco? Tier-1 Lithium Project in Quebec, Canada

    Slide 4: Why Cisco? Tier-1 Lithium Project in Quebec, Canada

    WHY CI SC O? TIER-1 LITHIUM PROJECT IN QUEBEC CANADA Scale Economics Infrastructure Growth 297 Mt C$13.5B ~150km 1.7 Mtpa @ 1.36% Li2O After-tax NPV8 to Matagami SC5.5 Production Largest spodumene 38.7% IRR Transshipment facility; 28-year mine life lithium resource in 3-year payback Established tran

  5. Slide 5: 2026 PEA Highlights

    Slide 5: 2026 PEA Highlights

    T HE C IS CO LI THI UM PRO JE CT 2026 PEA HIGHLIGHTS Assumptions: US$1,647 (FOB Quebec ports) | 8% Discount | SC5.5 Post-Tax NPV8 Post-Tax IRR Payback Period C$13.5B 38.7% 3.0 years Average Production Total Mine Life Total CAPEX AISC 1.7 Mtpa 28 Years C$2.9B C$454 / tonne Assumptions Value Exchange

  6. Slide 6: 2026 PEA Highlights: Price Sensitivity

    Slide 6: 2026 PEA Highlights: Price Sensitivity

    C IS CO LITHI UM P ROJE CT 2026 PEA HIGHLIGHTS Robust economics under a wide range of spodumene pricing assumptions Sensitivity Analysis – Price of Spodumene Concentrate 5.5% Li2O % Variation -30% -20% -10% Base Case 10% 20% 30% (C$/t) $1,602 $1,831 $2,060 $2,289 $2,518 $2,747 $2,976 LOM Avg. Price

  7. Slide 7: May 2026 Mineral Resource Estimate

    Slide 7: May 2026 Mineral Resource Estimate

    T HE C IS CO LI THI UM PRO JE CT MAY 2026 MINERAL RESOURCE ESTIMATE 297Mt @ 1.36% Li2O establishes Cisco as one of the world’s largest spodumene lithium resources ▪ May 2026 Inferred MRE based on 75 holes drilled for 33,343 m. ▪ Deposit remains open in all directions with multiple high potential tar

  8. Slide 8: May 2026 Mineral Resource Estimate

    Slide 8: May 2026 Mineral Resource Estimate

    T HE C IS CO LI THI UM PRO JE CT MAY 2026 MINERAL RESOURCE ESTIMATE Conceptual Pit Shell Priority Target Priority Target North TSX.V: QTWO | OTCQB: QUEXF | FSE: 458 8

  9. Slide 9: Global Peer Comparison

    Slide 9: Global Peer Comparison

    T HE C IS CO LI THI UM PRO JE CT GLOBAL PEER COMPARISON Cisco combines top-tier scale with competitive grade 1.8 SCALE & GRADE Circle size indicates contained Li20 1.7 Greenbushes 1.6 Andover Max 1.5 Pakeagama Lake Shaakichiuwaanann Goulamina Manono Grota do 1.4 Whabouchi Cirilo Bandeira Mount 1.3 G

  10. Slide 10: Western Hemisphere Peers

    Slide 10: Western Hemisphere Peers

    T HE C IS CO LI THI UM PRO JE CT WESTERN HEMISPHERE PEERS Cisco is the largest spodumene lithium resource in the Western Hemisphere by tonnage 1.8 SCALE & GRADE 1.6 Circle size indicates contained Li20 PAK & Spark Grota do Whabouchi Cirilo 1.4 Bandeira Kings Grade (Li20 %) Mountain Shaakichiuwaanaan

  11. Slide 11: Location Advantage

    Slide 11: Location Advantage

    T HE C IS CO LI THI UM PRO JE CT LOCATION ADVANTAGE Transportation ▪ Only ~150km from the Matagami Transshipment Facility. ▪ One of the shortest haul distances among major James Bay lithium developments. ▪ Existing highway access eliminate the need for additional transportation infrastructure develo

  12. Slide 12: Where Is Cisco?

    Slide 12: Where Is Cisco?

    T HE CI S CO LI T HI U M PR O JE C T WHERE IS CISCO? Cisco covers 801 contiguous mineral claims over 41,253 ha along the Frotet Within the traditional territory Evans Greenstone Belt. of the Cree Nation of Nemaska The Cisco Project is in the southernmost part of the Eeyou Istchee James Bay region of

  13. Slide 13: Geology

    Slide 13: Geology

    T HE C IS CO LI THI UM PRO JE CT GEOLOGY TOTAL DRILLED AS AT NOVEMBER 10, 2026: ~69,500 m across 151 holes | 5 drills currently working INFILL & EXPLORATION PROGRAM ▪ Continued infill and exploration drilling within main Cisco Deposit area. ▪ Expansion drilling as well as near-deposit. ▪ 2026 MRE on

  14. Slide 14: Engineering

    Slide 14: Engineering

    T HE C IS CO LI THI UM PRO JE CT ENGINEERING Metallurgy, Engineering Studies and Data Collection Programs: ▪ Phase 1 of metallurgy test work: three composite samples tested using HLS to confirm the potential suitability of a DMS process: ▪ Composite 18: 74.1% recovery - 5.69% Li2O concentrate - low

  15. Slide 15: Environmental

    Slide 15: Environmental

    T HE C IS CO LI THI UM PRO JE CT ENVIRONMENTAL ▪ Establishing a comprehensive understanding of existing environmental conditions in & around the Cisco Project and area; ▪ Supporting future project planning, permitting, engineering, and stakeholder engagement; ▪ Studies of water, wetlands, vegetation

  16. Slide 16: Community Engagement

    Slide 16: Community Engagement

    T HE CI S CO LI T HI U M PR O JE C T COMMUNITY ENGAGEMENT ▪ Building a foundation for partnership and collaboration. ▪ Consistent and constructive open dialogue and engagement with stakeholders: ▪ Cree Nation of Nemaska and Waswanipi; ▪ Town of Matagami; ▪ Eeyou Istchee James Bay Regional Government

  17. Slide 17: Opportunities & Next Steps

    Slide 17: Opportunities & Next Steps

    T HE C IS CO LI THI UM PRO JE CT OPPORTUNITIES & NEXT STEPS TSX.V: QTWO | OTCQB: QUEXF | FSE: 458 17

  18. Slide 18: Our Team

    Slide 18: Our Team

    Q 2 M E TA L S M ANA GE ME NT & BO ARD OUR TEAM ALICIA MILNE LEO POWER KEITH PHILLIPS SAGE McCALLUM Executive Chair, Director CEO, President & Director MBA, MOGS, ICD.D P. Geo Independent Director Legal professional with 20+ years of VP Exploration, Director Former CEO of Piedmont Lithium and 30+ ye

  19. Slide 19: Share Structure & Performance

    Slide 19: Share Structure & Performance

    Q 2 ME TA LS ST O CK I NF O RMAT I ON SHARE STRUCTURE & PERFORMANCE TSX-V: QTWO CASH ON HAND (as of 2026-08-31) ~$70.9 M ISSUED & OUTSTANDING 241.6 M Sprott Lithium Miners ETF (LITP) MARKET CAP (as of 2026-11-07) C ~$375 M 1,429,000 WARRANTS 780K @ C$0.90 (Expiry Aug 2028) 649K @ $2.45 (Expiry May 2

  20. Slide 20: Q2 Metals Corp.

    Slide 20: Q2 Metals Corp.

    C ON T AC T Q2 METALS CORP. Alicia Milne Sage McCallum President, CEO & Director VP Exploration & Director AMilne@Q2metals.com SMcCallum@Q2metals.com Chris Ackerman Jason McBride Corporate Development Manager, Investor Relations CAckerman@Q2metals.com JMcBride@Q2metals.com TSX.V: QTWO | OTCQB: QUEXF

  21. Slide 21: Global Peer Resources / Reserves

    Slide 21: Global Peer Resources / Reserves

    AP PE NDIX Global Peer Resources / Reserves Company Project & Link Stage Source Zijin Manono Development 2024 News Release Pilbara Pilgaangora Production 2025 Annual Report IGO Greenbushes Production 2025 News Release Ganfeng Goulamina Production 2024 News Release Sociedad Quimica y Min. de Chile SA

Source: company website

More decks from Q2 Metals Corp

All 7 Q2 Metals decks