Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Corporate Update (February 2022)

33 slides from Contango Silver & Gold's corporate update, Feb 22, 2022

  1. Slide 1: Corporate Update and Plans for 2022

    Corporate Update and Plans for 2022 February, 2022 Exhibit 99.2

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT This presentation contains forward-looking statements regarding CORE that are intended to be covered by the safe harbor "forward-looking statements" provided by the Private Securities Litigation Reform Act of 1995, based on CORE’s current expectations and includes statement

  3. Slide 3: Cautionary Note Regarding Estimates of Measured, Indicated and Inferred Resources

    The Preliminary Economic Assessment (“PEA”) referenced herein was prepared in accordance with Canadian National Instrument 43-101 (NI 43-101). CORE is not subject to regulation by Canadian regulatory authorities and no Canadian regulatory authority has reviewed the PEA or passed upon its accuracy or

  4. Slide 4: Developing Alaska's Next Gold Mine(s)

    Developing Alaska’s Next Gold Mine(s) Manh Choh – Development Stage Project in partnership with Kinross and the Alaska Native Tetlin Tribe100% Owned Lucky Shot Mine – Historically high-grade gold explorationThree Early-Stage Exploration Projects:ShamrockEagle-HonaTriple Z 4

  5. Slide 5: Corporate Overview

    CORPORATE OVERVIEW Now trading on the NYSE American: CTGO6.75 Million Shares Outstanding6.85 Million Shares Fully Diluted100,000 Options; No Warrants and No Long Term Debt~ $US17 Million Cash as of Jan. 2022Contango 30% owner of Peak JV; Kinross Owns 70% and is Operator100% owner of the Lucky Shot P

  6. Slide 6: Manh Choh Gold Deposit

    Manh Choh Gold Deposit1.3 Moz Gold – Measured plus Indicated Resources1Average grade = 4g/t Gold1Located in Alaska on the Alaska HwyOn Private Land Owned by the Tetlin Alaska Native TribeBusiness Partnership with Kinross – Paid $93 Million for 70% interest Using the Fort Knox Milling Facilities  Lo

  7. Slide 7: Near-Term Production Potential & Excellent Exploration Upside

    NEAR-TERM PRODUCTION POTENTIAL & EXCELLENT EXPLORATION UPSIDE 7 MANH CHOH GOLD PROJECT NYSE-A:CTGO In September 2020 entered into JV agreement between Contango (30%) and Kinross (70% and Operator) to form new Peak Gold LLC, with Royal Gold and Tetlin Tribe retaining royalty interests;Plan is to mine

  8. Slide 8: Manh Choh Gold Project: Anticipated Economics

    MANH CHOH GOLD PROJECT: Anticipated Economics Using existing infrastructure at Fort Knox, the Peak Gold LLC is planning on a 2024 start dateKinross estimates +1 million oz gold production over a 5-year period equating to roughly 220,000 oz GEO per annum (30% to Contango Ore = 66,000 GEO/Yr)1Using el

  9. Slide 9: Community Meetings - Tetlin Village

    Community Meetings - Tetlin Village2500 direct engagements with stakeholders TokTanacrossNorthwayMentasta LakeDelta JunctionFairbanks Fox Tanana Chiefs ConferenceDoyon Alaska Chamber & AMA 9

  10. Slide 10: Benefits to Alaska Residents and Businesses

    10 MANH CHOH GOLD PROJECTBenefits to Alaska Residents and Businesses McKinley Research confirms jobs, economic boost to Tok, road and infrastructure enhancements, and taxes: • 250 to 300 new Construction jobs• 400 to 600 direct Mine and Trucking jobs plus indirect and induced jobs (2X)• The average

  11. Slide 11: Manh Choh Gold Project Location

    The project is located 15 km (10 mi) from the Alaska Hwy and 400 km (240 mi) to the Fort Knox Milling Complex 11 MANH CHOH GOLD PROJECT LOCATION MANH CHOH DEPOSIT Image used with permission from Kinross

  12. Slide 12: Peak Gold JV Project Highlights

    PEAK GOLD JV 12 Processing ore from the Peak Gold Project at Fort Knox avoids mill construction and is expected to decrease execution risk, lower capital expenditures, drive attractive returns, and reduce the project’s environmental footprint and permitting requirements.Leverages Fort Knox’s success

  13. Slide 13: Manh Choh Gold 2021 Program

    13 MANH CHOH GOLD 2021 PROGRAM Completed On Budget: $19 Million  In-fill drilling to upgrade Resources from Indicated to Measured and Inferred to Indicated Categories – Reserves with FSCondemnation drill – Placement of FacilitiesMetallurgy – Testing Completed Hydrology – Water Management PlanIn-pit

  14. Slide 14: Manh Choh Gold Project Simple Development Plan

    14 MANH CHOH GOLD PROJECT Simple Development Plan $25.6 million 2022 BudgetTwo Open Pits with Development Rock/Waste materials adjacent to pitsNo Mill No Tailings FacilityFeasibility Study and Permitting are UnderwayFeasibility Study expected in 2H 2022Camp and other early-work construction to start

  15. Slide 15: Manh Choh Gold Project and Surrounding Targets

    15 MANH CHOH GOLD PROJECT AND SURROUNDING TARGETS Main MC North MC $3 Million Exploration Program Planned for 2022

  16. Slide 16: Lower Risk & Reduced Timeline to Production Decision

    16 LOWER RISK & REDUCED TIMELINE TO PRODUCTION DECISION DRILLING SCOPING STUDY PERMITTING & FEASIBILITY PRODUCTION DETAILED DESIGN PROCURMENTCONSTRUCTION $19 million Program in 2021: Resource In-fill, Hydrology, Geotechnical, Metallurgical Engineering; Environment and Community OutreachWith ~$2 mill

  17. Slide 17: Reference

    17 1 Hart, C.J.R., 2005. Mid-Cretaceous Magmatic Evolution and Intrusion-related Metallogeny of the Tintina Gold Province, Yukon and Alaska. Unpublished PhD thesis, University of Western Australia, 198 p. 1

  18. Slide 18: Lucky Shot Portal Circa 1930

    Lucky Shot Portal Circa 1930 18

  19. Slide 19: Lucky Shot Property Historic Resources

    Lucky Shot Property Historic Resources1 M&I: 206k Tonnes @ 18.3 g/t Gold for 121,500 Ounces of Contained Gold2 1 The historical production information presented is based upon reports file by the US Geological Survey from information provided by prior owners and operators of the mines. The Company ha

  20. Slide 20: Lucky Shot land package

    ~17,000 acres of patented and State of Alaska mining claims Focus on Coleman-Lucky Shot-War Baby and Gold Bullion Mines 20

  21. Slide 21: Lucky Shot Property Location

    Lucky Shot Palmer Anchorage Willow Wasilla Mill Building Fairbanks Mill Building Parks Hwy Glenn Hwy Willow-Fishhook Rd Lucky Shot Property Palmer Wasilla 21

  22. Slide 22: Lucky Shot: Established Infrastructure

    22 Established InfrastructureHistorically mined grades of 1 to 2 oz/t1District Scale Potential 30 historic minesWell understood geologyLarge digital databaseHired ex-Pogo Mine General Manager to lead Lucky Shot Program1 The historical production information presented is based upon reports filed by t

  23. Slide 23: Lucky Shot Property Historic Drill Intercepts

    1 The historical production information presented is based upon reports file by the prior owners and operators of the mines. The Company has not undertaken any independent work to verify or confirm the previously reported information. The historical information may not be representative of future re

  24. Slide 24: En: res *

    aa} ; ae En: res * Coleman block By Lucky Shot block Om Ai a Hull 0 fy. yen 4 9 ,. \ 4 Wie ‘ . % .

  25. Slide 25: Contango ORE

    CONTANGO OR= LO SILVER PER

  26. Slide 26: 26

    26

  27. Slide 27: 27

    27

  28. Slide 28: Slide 28

  29. Slide 29: Contango Exploration Plan for Lucky Shot Project

    Contango Exploration Plan for Lucky Shot Project Rehab and extend existing Enserch tunnel in 2021-2022 to explore the Lucky Shot vein down-dip from historically produced 250,000 ounces at 40g/t average grade 1 - prep for exploration drilling in three stages:Stage 1a Rehabilitate and extend Enserch t

  30. Slide 30: Contango ORE - Key Takeaways

    30 CONTANGO ORE - Key Takeaways Image used with permission from Kinross Advancing our flagship project - 1.3 million ounce Manh Choh project in partnership with Tetlin Alaska Native Tribe and Kinross as OperatorKinross paid $93 Million for their 70% interest in Peak Gold JV$19 million 2021 program c

  31. Slide 31: Thank You

    GOLD SiLveR COPPER THANK YOU_

  32. Slide 32: Corporate Inquiries

    Corporate Inquires:info@contangoore.com+1-778-386-6227www.contangoore.com NYSE American: CTGO Twitter: @orecontangoLinkedIn: Contango OREInstagram: ContangoOREFacebook: Contango ORE

  33. Slide 33: Non-GAAP Forward Looking Estimates Note

    This presentation contains forward looking estimates of all-in sustaining cost (“AISC”), resources and EBITDA, which are a financial measure not determined in accordance with United States generally accepted accounting principles (“GAAP”). We cannot provide a reconciliation of estimated AISC, resour

Contango ORE — Corporate Update (February 2022) on 6ix