Badger Infrastructure Solutions Ltd · TSX:BDGI

Badger Infrastructure Solutions — Badger Daylighting — Investor Presentation (May 2016)

36 slides from Badger Infrastructure Solutions's investor presentation, May 9, 2016

  1. Slide 1: Corporate Presentation

    Corporate Presentation May 9, 2016

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains forward-looking statements reflecting certain current forecasts of certain aspects of the company’s future. It is based on current information that management has assessed, but which by its nature is dynamic and subject to rapid and even abrupt c

  3. Slide 3: Financial Summary

    Financial Summary Shares outstanding – at May 9, 2016 37,100,681 Share price range (52 weeks) – at May 9, 2016 $16.71 - $30.36 Market capitalization - at May 9, 2016 $800M Total debt less cash – at March 31, 2016 $66M Enterprise value – at December 31, 2015 $895M Average return on equity (Last 5 Yea

  4. Slide 4: What is Daylighting?

    What is Daylighting? Daylighting is simply exposing underground facilities, such as utilities and pipelines, to daylight.

  5. Slide 5: Badger Daylighting

    Badger Daylighting Badger Daylighting is North America’s largest provider of non-destructive daylighting services. Badger’s primary customers are contractors and facility owners in the utility and petroleum sectors.

  6. Slide 6: The Badger Process

    The Badger Process 1. Purpose built, productive Badger unit with well trained, professional operators 2. Pressurized water stream excavation. Nozzle design, pressure and volume is critical to prevent damage 3. Powerful vacuum system removes soil and debris.

  7. Slide 7: Advantages of Badger Process

    Advantages of Badger Process • Safe → Helps prevent damage to underground infrastructure • Saves time → Keeps projects on schedule • Increases efficiency of hand digging or mechanical excavation equipment when digging around underground utilities • Easy to use in constrained areas - can work 50’ dee

  8. Slide 8: Opportunity: Aging Infrastructure

    Opportunity: Aging Infrastructure • US local gas distributors spend $19B annually upgrading their systems.1 • Estimated 240,000 water main breaks per year across the US.1 • American Society of Civil Engineers estimates $3.6T investment needed in US infrastructure by 2020.1 • 34,027 miles of pipeline

  9. Slide 9: Opportunity: Safety

    Opportunity: Safety June 2015 – Canmore, AB A third party contractor hit a 1 ¼” steel ATCO gas line and pulled it off the main. The resulting gas leak caused an explosion, spreading shrapnel around the neighborhood and severely damaging several homes.

  10. Slide 10: Pipeline Coverage

    Pipeline Coverage PennWell MAPSearch Pipeline Coverage - All Commodities t x s "xX _ ~~ t Pr \ Yes || 7. 1 i if — a Ny “ ry MSA NRF eS 3, OD “NSA MAPSearch ——— vf a DAYLIGHTING™

  11. Slide 11: Opportunity: Aging Infrastructure

    Opportunity: Aging Infrastructure BADGER Advantage: Water Main Break • Expand road cut to 4’ x 4’ • Install shoring & complete repair • Water service restored 60% faster than traditional approach • Repair completed for 10% of cost of traditional approach

  12. Slide 12: Opportunity: Increase Productivity

    Opportunity: Increase Productivity BADGER Advantage: More Efficient Service • Contractor averaging 2-3 service trenches per day or 160- 240 linear feet/day with hand digging • Hires Badger to dig trench • Badger averaged 7-10 trenches or 560-800 linear feet/day • Cleaner, neater and narrower trench

  13. Slide 13: Opportunity: Trenching

    Opportunity: Trenching BADGER Advantage: • 11 cubic yards per day in congested conditions • Clean, neat and precise

  14. Slide 14: Opportunity: Alternative Solution

    Opportunity: Alternative Solution BADGER Advantage: Strength and Power • Solution provider for unique and difficult projects • Excavated 70’ to sink down culvert in a landfill • No other option was available

  15. Slide 15: Opportunity: Increase Productivity

    Opportunity: Increase Productivity Nuclear Facility • Badger productivity is double what the contractor accomplished • Same application and soil conditions for both trucks

  16. Slide 16: Opportunity: Debris Removal

    Opportunity: Debris Removal BADGER Advantage: Strength & Power • Debris removal from inside caissons on a barge over 80’ deep • Drilling grout removal – over 10 cubic yards in less than 10 minutes

  17. Slide 17: Badger Daylighting Markets

    Badger Daylighting Markets 38 62 Petroleum-related infrastructure Utilities & other – 62% (2014: 49%) & oil field service – 38% (2014: 51%)

  18. Slide 18: Diversified Market

    Diversified Market UTILITIES OIL & GAS POWER GENERATION Gas Distribution Transmission Pipeline Nuclear Electric Distribution Refineries Coal Water & Sewer Production Wind Telecommunications Storage Solar TRANSPORTATION INDUSTRIAL ENGINEERING Rail (Freight, Subways, Light Rail) Manufacturing Transpor

  19. Slide 19: Badger Daylighting Business Model

    Badger Daylighting Business Model Vertically integrated service company • Designs and manufactures hydrovac units since 1992 • Lower capital cost investment, safer and more efficient equipment • Payback of capital cost in 3.5 to 4.0 years before tax • Hydrovac unit’s economic life is 10 years • Prov

  20. Slide 20: North America-wide Coverage

    North America-wide Coverage

  21. Slide 21: Competitive Advantages

    Competitive Advantages • Safety application knowledge and daylighting expertise gained from years of experience in different applications in North America • National service provider in US and Canada • MSA’s • Fleet coverage and North America wide service network • Ability to move trucks to increase

  22. Slide 22: Competitive Advantage: Fleet Size

    Competitive Advantage: Fleet Size North America’s Largest Hydrovac Fleet: • Badger’s large fleet size lets us respond to large projects with multiple units to get work done within tight project timelines.

  23. Slide 23: Competitive Advantage Technology/Truck Development

    Competitive Advantage Technology/Truck Development • In-house design, research/development and manufacturing • Continuous improvement to enhance performance – ensure operator friendly • Other manufacturers sell - less motivation to enhance units • Lower capital cost

  24. Slide 24: Red Deer Facility

    Red Deer Facility • 69,200 square feet • Canadian administration, regional support, service shop and manufacturing • Design of trucks with professional engineering resource

  25. Slide 25: Full Year Performance During Weak Economic Conditions

    Full Year Performance During Weak Economic Conditions 2009 2015 Economic “The Great Recession” – global Oil production glut causes condition recession precipitated by US global oil producers to cut housing bust. investment by hundreds of billions of dollars. Badger • cut build to ~1.5 trucks per mon

  26. Slide 26: Income Statement

    Income Statement $(000s) except EPS FY 2012 FY 2013 FY 2014 FY 2015* Q1 2016 Revenue 239,228 324,594 422,219 404,620 88,157 Adjusted EBITDA 63,814 94,169 120,121 107,759 19,592 Profit before tax 42,008 57,827 73,519 38,488 5,127 EPS – Diluted $0.80 $1.09 $1.43 $1.04 $0.10 *Includes legal settlement

  27. Slide 27: Balance Sheet

    Balance Sheet ($000s) March 31, December 31, 2016 2015 Working capital 88,059 83,654 Long-term debt 97,276 103,852 Cash and cash equivalents (31,474) (24,991) Net debt 65,802 78,861 Equity 260,134 267,686 Net debt : Equity 0.25 : 1.00 0.29 : 1.00 TTM* Adjusted EBITDA 99,595 107,759 Net Debt : TTM* A

  28. Slide 28: Cash Available for Dividends and Growth Capex

    Cash Available for Dividends and Growth Capex For the three months ($000s) ended March 31, 2016 Cash flow from operating activities before non-cash working capital adjustments 15,266 Add: Proceeds on disposal of capital assets 141 Less: Required principal repayments of long-term debt - Less: Mainten

  29. Slide 29: Revenue per Truck per Month

    Revenue per Truck per Month Multi-Currency Metric 37,500 36,000 34,600 34,500 32,500 32,900 32,200 33,000 31,500 29,300 30,000 29,200 28,500 27,000 25,500 25,700 25,500 24,700 24,000 22,500 21,100 21,000 19,500 18,000 16,500 15,000 13,500 12,000 10,500 9,000 7,500 6,000 4,500 3,000 1,500 0 2007 2008

  30. Slide 30: Total Units: Canada & the U.S.

    Hydrovac Units Total Units: Canada & the U.S. 1,100 1,018 1,012 998 1,000 900 791 800 700 630 600 504 500 413 407 412 400 334 285 300 241 200 162 184 185 212 100

  31. Slide 31: Total Daylighting Revenues

    Total Daylighting Revenues Canadian $ millions 400 364 368 350 309 300 250 228 200 184 140 150 127 132 113 97 100 77 82 79 52 62 39 48 50 0

  32. Slide 32: Deployment

    Deployment As of March 31, 2016 TOTAL UNITS – 1,012 Canada 361 U.S. 651

  33. Slide 33: Future Growth Opportunities

    Future Growth Opportunities Targets • US - double revenue from 2015 YE within five years. • Canada – organic growth long term 10-15% per year. Actions • Develop organization to grow US customer base. • Enhance Business Development capability. • Remain flexible to take advantage of opportunities or m

  34. Slide 34: Questions and Answers

    Questions and Answers

  35. Slide 35: Sources

    Sources 1. US local gas distributors spend $19B annually upgrading their systems. Estimated 240,000 water main breaks per year across the US. American Society of Civil Engineers estimates $3.6T investment needed in US infrastructure by 2020. American Society of Civil Engineers’ (ASCE) “2013 Report C

  36. Slide 36: DAYLIGHTING

    —_ DAYLIGHTING™

Badger Daylighting — Investor Presentation (May 2016) on 6ix