Aspire Mining Limited · ASX:AKM
Aspire Mining — Investor Presentation (September 2013)
25 slides from Aspire Mining's investor presentation, September 2013

Slide 1: Ovoot Coking Coal Project Investor Presentation
Ovoot Coking Coal Project Investor Presentation September 2013 June 2010 1

Slide 2: Important Information
Important Information •Nature of this document: This document has been prepared by Aspire Mining Limited (“Aspire”, “AKM”, or the “Company”) and contains summary information about the Company and its subsidiaries as at the date of release of this document. The information in this document does not s

Slide 3: Company Snapshot – Corporate Structure
Company Snapshot – Corporate Structure Ownership (Fully Diluted) Board of Directors • David McSweeney (Non-Exec Chairman) – lawyer by training and has over AKM Directors (ex Turbat) 20 years experience in the resources sector ranging from exploration to project management, project finance, commercia

Slide 4: Significant Mongolian Coal Projects
Significant Mongolian Coal Projects 4

Slide 5: Progress Update
Progress Update The Ovoot Coking Coal Project Aspire owns 100% of the Ovoot Project – the second largest coking coal Reserve in Mongolia (255Mt) Aspire received its Mining Licence in August 2012 Completed Revised Pre‐Feasibility Study for the Ovoot minesite in December 2012 Completed carboni

Slide 6: JORC Resource & Reserve Update Confirm Ovoot as Second Largest Coking Coal Reserve
JORC Resource & Reserve Update Confirm Ovoot as Second Largest Coking Coal Reserve in Country Mongolian Coking Coal Reserves +1.6 Bt JORC Reserve Probable Total Marketable 400 (31 July 2013) (Mt) (Mt) (Mt) (arb 2% (arb, 9.5% 350 moisture) moisture) 300 Ovoot Open Pit 247 247 182 255 Mt* Ovoot 8 8 6

Slide 7: Exceptional Deposit – High Washing Yield and % Coking
Exceptional Deposit – High Washing Yield and % Coking = Highest In‐Situ Value per tonne 7

Slide 8: Ovoot Revised Development Plan
Ovoot Revised Development Plan Mine CAPEX and OPEX Estimates Initial Production up to 5 Mtpa CAPEX US$144m (incl. contingency and working capital) Commencement 2017 Production growth potential up to 12MtpaNote1 Life of Mine 20 yearsNote1 OPEX (Avg first 3 years) US$83‐93/tNote2 Total Saleable Produc

Slide 9: Revised Ovoot Mine Development Plan Has Robust Economics
Revised Ovoot Mine Development Plan Has Robust Economics Revised development plan has significantly reduced capital cost estimates for the Ovoot mine Estimated Capex to produce 5mtpaNote1 US$ 144 Estimated Opex FOR China at US$93/t ‐ Mine pre strip $60 5mptaNote 1 ‐ Mobilisation $8 ‐ Mining and Proc

Slide 10: Ovoot coking coal will have a long term cost advantage
Ovoot coking coal will have a long term cost advantage Metallurgical Coal (HCC + PCI + SSCC) Ovoot and Mongolian coking coal has a significant geographical advantage that requires rail development to secure Source: Aspire Mining Ovoot coking coal nominal cost US$93/t (not including royalty). Refer A

Slide 11: VITROCOAL Low Ash, High Fluidity Coking Coal
VITROCOAL Low Ash, High Fluidity Coking Coal Indicative Ovoot Washed Coking Ovoot Coking Coal displays High fluidity and Coal Specification plastic properties Moisture 9% An ideal blend coking coal indicated by industry leading Gray-King Index and Rank Ash 9% Chinese classification “FM Premium

Slide 12: Chinese Blending Coal Requirements
Chinese Blending Coal Requirements Chinese Coking Coal Reserves Typical Chinese Coke Blend Unamed coal, 2% Other, Meagre 5% lean, Gas coal, 7% 14% Lean, 12% Lean, 7% Gas coal, 29% 1/3 Coking, 19% Primary coking coal, 25% Primary coking Gas fat coal, coal, 31% 7% 1/3 Coking, Fat, 19% 13% Fat, 10% • N

Slide 13: Chinese Blending Coal Requirements
Chinese Blending Coal Requirements Chinese fat coal consumption during 2012 totalled 114Mt (total coking coal consumption 599Mt) Domestic Fat Coal Reserves are depleting, with an estimated life of 15 years (based on wash yields of ~55%)Note1 “Lack of hard coking coals – …especially high fluidi

Slide 14: A Major and Important New Coal Discovery in Northern Mongolia
A Major and Important New Coal Discovery in Northern Mongolia Carbonisation testwork has shown • Ovoot coal was able to replace up to 25% of Prime Hard Coking Coal in a blend with recycled coke breeze ‐ and improved coke quality • Ovoot coal when blended with 75% poorly caking SSCC significantly imp

Slide 15: Significant Interest in Ovoot Coking Coal Exceed Stage 1 Production
Significant Interest in Ovoot Coking Coal Exceed Stage 1 development production Initial discussions with North Asian coking coal end users has confirmed that Ovoot Coking Coal fits neatly into the clean fat coking coal category • Washed bulk sample being provided to interested parties for their prod

Slide 16: A Compliment for Tavan Tolgoi Thermal Coal
A Compliment for Tavan Tolgoi Thermal Coal • Plastic properties (CSN, fluidity, dilatation, G and Y) are required in order to sell coal as coking coal (whether hard or semi-soft coking coal) • Around 30% of Tavan Tolgoi reserves have no plastic properties • This coal can be sold as thermal coal but

Slide 17: Tavan Tolgoi Coals Upgraded Using Ovoot Coking Coal
Tavan Tolgoi Coals Upgraded Using Ovoot Coking Coal TT Sample 0 Seam “Thermal” 50/50 Blend Ovoot Coking “Primary Coking (FM)” Coal TT Sample OR “Fat Coking 3 Seam “1/3 Coking” “Nil coking Coal” properties” • G Index: 83-88 • Y Index: 17-18mm • Sulphur (adb): <1% TT Sample • Volatiles (adb): 24-26% 4

Slide 18: TT and Ovoot Blending Location Identified
TT and Ovoot Blending Location Identified 18

Slide 19: Rail Infrastructure Key to Unlocking Northern Mongolia
Rail Infrastructure Key to Unlocking Northern Mongolia Commentary Potential Rail Route – Ovoot Coking Coal Project is 550kms (direct) from Trans‐Mongolian rail terminus – Opens up major transport corridor in Northern Mongolia (passing through Orkhon, Bulgan, Khuvsgul and Zavkhan provinces) – Open ac

Slide 20: Northern Railways LLC
Northern Railways LLC Subsidiary of Aspire Mining • Focused on infrastructure to connect Ovoot to Erdenet • Stand alone Special Purpose Vehicle to: - Apply for BOOT (Build Own Operate Transfer) rail concession - Manage EPC contractors - Raise required funds through issuing debt and equity securities

Slide 21: Rail Development Progress Update
Rail Development Progress Update Northern Rail Line Completed Pre‐Feasibility Study, and received confirmation of technical design standards by Mongolian Rail Authority Granted a General Environmental and Impact Assessment (GEIA) Completed Revised Pre‐Feasibility on alternative southern alignm

Slide 22: Potential Routes to Coal Markets – Rail Access
Potential Routes to Coal Markets – Rail Access Asian Importers of Metallurgical Coal: Japan 71.5Mt1 Korea 25.8Mt1 Taiwan 5.5Mt1 102.6Mt Russian total Metallurgical Coal Exports to Asian markets (incl. China): 7.6Mt1 1. Source: TEX Report, 2012 data. 22

Slide 23: Steps to Develop the Ovoot Project
Steps to Develop the Ovoot Project Focus Areas over coming 12 months Rail Progress Bankable Feasibility Study for Railway Complete Environmental Impact Assessments on western portion of the Rail alignment Rail concession and approvals EPC Contract Discussion Rail Financing consortium Mine

Slide 24: Competent Person Statement
Competent Person Statement Competent Persons Statement In accordance with the Australian Securities Exchange requirements, the technical information contained in this announcement in relation to the JORC Compliant Coal Reserves and JORC Compliant Coal Resource for the Ovoot Coking Coal Project in Mo

Slide 25: Contact details
Contact details Aspire Mining Limited ABN: 46 122 417 243 ASX Code: AKM Web: www.aspiremininglimited.com AUSTRALIA Level 2, Suite 20, 22 Railway Road Subiaco, Western Australia, 6008 MONGOLIA Sukhbaatar District, 1st Khoroo, Chinggis Ave‐8 Social Insurance Department Building Altai Tower, 3rd Floor,
Source: Internet Archive copy of aspiremininglimited.com
More decks from Aspire Mining Limited
Ignite Investment Summit 202622 slides · Oct 16, 2026
Shareholder Meeting (May 2025)12 slides · May 29, 2025
Investor Presentation (March 2025)27 slides · March 2025
Investor Presentation (October 2024)17 slides · October 2024
Shareholder Meeting (May 2024)17 slides · May 2024
Investor Presentation (November 2023)17 slides · November 2023