Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Red Cloud Octoberfest 2020

28 slides from Contango Silver & Gold's conference presentation, October 2020

  1. Slide 1: Investor Presentation – Red Cloud Octoberfest

    INVESTOR PRESENTATION Red Cloud Octoberfest OCTOBER, 2020

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT This presentation contains forward-looking statements regarding CORE that are intended to be covered by the safe harbor "forward-looking statements" provided by the Private Securities Litigation Reform Act of 1995, based on CORE’s current expectations and includes statement

  3. Slide 3: Cautionary Note Regarding Estimates of Resources; Non-GAAP Measures

    CAUTIONARY NOTE REGARDING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES The Preliminary Economic Assessment (“PEA”) referenced herein was prepared in accordance with Canadian National Instrument 43-101 (NI 43-101). CORE is not subject to regulation by Canadian regulatory authorities and no

  4. Slide 4: Peak Gold Project

    PEAK GOLD PROJECT NEAR-TERM PRODUCTION POTENTIAL VALUE PROPOSITION EXPLORATION UPSIDE Entered into 70/30 JV agreement with Kinross to form Strong management that has created significant Significant exploration upside on 30% owned new Peak Gold JV; Royal Gold retains royalty; value for shareholders:

  5. Slide 5: Officers & Directors

    OFFICERS & DIRECTORS • OFFICERS • Rick Van Nieuwenhuyse – President and CEO • Leah Gaines – CFO • DIRECTORS • Brad Juneau (Chairman) • Joseph S. Compofelice • Joseph G. Greenberg • Richard A. Shortz • Rick Van Nieuwenhuyse STRONG MANAGEMENT WITH PROVEN TRACK RECORD Successful track record of finding

  6. Slide 6: Corporate Overview

    CORPORATE OVERVIEW • Sufficient cash to meet projected 2 year construction decision • Planned budget expected to be <US$5M per annum for Contango ORE • Tight Share Structure • Contango ORE could expect strong cash flow per share (CFPS) starting in 2024 assuming construction decision made CAPITAL STR

  7. Slide 7: Peak Gold Deposit Estimated Production

    PEAK GOLD DEPOSIT ESTIMATED PRODUCTION 100% basis 30% basis (100% basis) 250,000 200,000 150,000 100,000 50,000 AISC = $750/GEO1 - PERMITTING 2021 & FEASIBILITY 2022 2023 1 YEAR 2024 2 YEAR 20253 YEAR 2026 4 YEAR 2027 5 YEAR Production produciton of Gold Equivalent Ounces (GEO Au+Ag) (oz AuEq) 1 Bas

  8. Slide 8: Peak Gold Estimated Cash Flow & CFPS

    PEAK GOLD ESTIMATED CASH FLOW & CFPS (US$) (CFPS sensitivity (lines) & Absolute (bars) - US$) $400,000,000 $16.00 $350,000,000 $14.00 $300,000,000 $12.00 After Tax Cash Flow (US$) Cash flow per share (US$) $250,000,000 $10.00 $200,000,000 $8.00 $150,000,000 $6.00 $100,000,000 $4.00 $50,000,000 $2.00

  9. Slide 9: Peak Gold Project Economics

    PEAK GOLD PROJECT ECONOMICS Model Assumptions: • Using existing infrastructure, the Peak Gold JV expects faster permitting to allow for a 2024 start date US$ NAVPS Sensitivity to Gold Price (US$/oz)2 • Existing infrastructure expected to lower total capital 0% NAVPS 5% NAVPS 10% NAVPS project IRR% r

  10. Slide 10: Peak Gold Project Location

    PEAK GOLD PROJECT LOCATION The project is located 15 kms (10mi) from the Alaska Hwy and 400km (250 mi) to the Fort Knox Milling Complex

  11. Slide 11: Asset Summary

    ASSET SUMMARY 100% 30% 70% Peak Gold JV State Claims Peak Gold Project (170,000 Acres) (675,000 Acres)  Contango is a 30% owner of the Peak Gold JV with Kinross owning the remaining 70% and acting as project operator  The Peak Gold project consists of a ~675,000 acres land package  Ore will be tr

  12. Slide 12: Peak Gold JV Project Highlights

    PEAK GOLD JV PROJECT HIGHLIGHTS • Processing ore from the Peak Gold Project at Fort Knox avoids mill construction and is expected to decrease execution risk, lower capital expenditures, drive attractive returns, and reduce the project’s environmental footprint and permitting requirements. • Leverage

  13. Slide 13: Peak Gold Deposit – M&I Resources

    PEAK GOLD DEPOSIT – M&I RESOURCES 9.2 M Tonnes @ 4.1 g/t Gold for 1.2 Million Ounces of Contained Gold 13

  14. Slide 14: Peak Gold JV Project Highlights Cont.

    PEAK GOLD JV PROJECT HIGHLIGHTS CONT • Peak Gold JV has commenced a $3.6 million infill, geotechnical and metallurgical drilling program to advance feasibility and permitting studies. • Initial permitting activities are expected to commence in parallel with the drilling program. OPEN • Peak Gold JV

  15. Slide 15: Peak Gold Project and Surrounding Targets

    PEAK GOLD PROJECT AND SURROUNDING TARGETS

  16. Slide 16: Peak Gold Project and Surrounding Targets

    PEAK GOLD PROJECT AND SURROUNDING TARGETS North Peak Main Peak

  17. Slide 17: Exploration Upside

    EXPLORATION UPSIDE PEAK GOLD JV LANDS • 675,000 Acres of Exploration Lands with multiple targets • Peak Gold’s exploration on the Tetlin Lands has been limited except for the areas around the identified deposits where there is an extensive database. • Specifically, there has only been minor explorat

  18. Slide 18: Lower Risk & Reduced Timeline to Production Decision

    LOWER RISK & REDUCED TIMELINE TO PRODUCTION DECISION • Initial permitting activities are expected to commence in parallel with the drilling; • Peak Gold JV expects to complete permitting • Infill, geotechnical and metallurgical and a feasibility study by the end of 2022; drilling program in 2020; •

  19. Slide 19: Management and Partner Quotes

    “The relatively high-grade, low-cost Peak Gold project is an excellent addition to our portfolio, as it allows us to leverage our existing mill and infrastructure at Fort Knox and strengthens our medium-term production and cash flow profile. In today’s gold price environment, Peak Gold is an attract

  20. Slide 20: Executive Summary

    DEVELOPING ALASKA’S NEXT GOLD MINE EXECUTIVE SUMMARY IN PARTNERSHIP WITH KINROSS AND THE TETLIN ALASKA NATIVE TRIBE • Contango ORE, Inc. is a gold development and exploration company with the goal to develop Alaska’s next producing gold mine • The Company is the 30% owner of the Peak Gold JV with Ki

  21. Slide 21: Investment Opportunity

    INVESTMENT OPPORTUNITY WHY INVEST NOW?

  22. Slide 22: Thank You

    THANKYOU :

  23. Slide 23: Corporate Inquiries

    OTCQB:CTGO Corporate Inquires: info@contangoore.com +1-778-386-6227 www.contangoore.com Twitter: @orecontango LinkedIn: Contango ORE Instagram: ContangoORE Facebook: Contango ORE

  24. Slide 24: Appendix – Non-GAAP Reconciliation Disclaimer

    APPENDIX NON-GAAP RECONCILIATION DISCLAIMER This presentation contains forward looking estimates of all-in sustaining cost (“AISC”), resources and EBITDA, which are a financial measures not determined in accordance with United States generally accepted accounting principles (“GAAP”). We cannot provi

  25. Slide 25: Triple Z Prospect: Geochemistry, MAG Low and Resistivity High

    Triple Z Prospect: Coincident Triple Z Prospect Multi-element Geochemistry MAG Low and Resistivity High

  26. Slide 26: Triple Z Prospect: Geochemistry and 3D IP Chargeability

    Triple Z Prospect: Coincident Triple Z Prospect Multi-element Geochemistry and 3D IP Chargeability + Resistivity + Drilling

  27. Slide 27: Hona Prospect – Coincident Mag-VTEM with Geochemistry

    Hona Prospect – Multiple, Coincident Mag-VTEM with Geochemistry and Favorable Porphyry/IRG Geology Hona Prospect

  28. Slide 28: Strong Multiple-Element Geochemistry on Dome and Eagle

    Dome and Eagle Strong Multiple-Element Geochemistry Prospects on Dome and Eagle Target Areas

Contango ORE — Red Cloud Octoberfest 2020 on 6ix