Yangarra Resources Ltd. · TSX:YGR

Yangarra Resources — Investor Presentation (May 2011)

22 slides from Yangarra Resources's investor presentation, May 2011

  1. Slide 1: Corporate Presentation

    Corporate Presentation May 2011 TSX-V: YGR www.yangarra.ca

  2. Slide 2: Forward Looking Information

    Forward Looking Information Statements in this presentation may contain forward-looking information including expectations of future production and components of cash flow and earnings. Forward looking statements or information are based on current expectations, estimates and projections that involv

  3. Slide 3: Reserve Definitions

    Reserve Definitions Natural gas has been converted to a barrel of oil equivalent (Boe) using 6,000 cubic feet (6 Mcf) of natural gas equal to one barrel of oil (6:1), unless otherwise stated. The Boe conversion ratio of 6 Mcf to 1 Bbl is based on an energy equivalency conversion method and does not

  4. Slide 4: 2010 Milestones

    2010 Milestones • Drilled 6 gross (4.7 net) horizontal wells in Central Alberta • Market Cap increase to $74.0 million from $7.5 million • NPV10 on a Proven plus Probable (P+P) basis, increased to $80.7 million from $37.9 million (113% increase) • 268% increase in oil and natural gas liquids for P+P

  5. Slide 5: Production (6:1) & Net backs ($/boe)

    Production (6:1) & Net backs ($/boe) 1000 $35.00 40 900 30 800 $28.83 20 700 $26.36 600 $20.06 10 $13.64 boe/d 500 0 boe Oil and NGL's 400 -10 Gas 300 -20 Netback/boe 200 100 -30 0 -40 Q1 Q2 Q3 Q4 Q1 2010 2010 2010 2010 2011 est. 5

  6. Slide 6: Share Structure

    Share Structure Publicly listed junior oil and gas company TSX-V: YGR Shares Outstanding Basic 103.8 million Options/Warrants (weighted average $0.57) 19.4 million Fully Diluted 123.2 million Management and Director Ownership Basic 20% Fully Diluted 28% Market Capitalization $74 million Significant

  7. Slide 7: Management and Directors

    Management and Directors Directors Management/Officers • Gordon Bowerman – Lead • Jim Evaskevich – President & CEO Director 30 years extensive executive Founder of several successful experience with strong operations private and public oil and gas background companies • Dan Helman, P.Eng. - VP Explo

  8. Slide 8: 2011 Plan

    2011 Plan CAPEX budget for 2011 $50.0 million Fully funded with Credit Facility and Cash Flow Budget includes 31 Gross (13.7 net) wells 9 gross (4.0 net) wells drilled Q1 (4 wells on-stream) Future drilling locations in Central Alberta 131 Gross (78 Net) Fourth quarter 2010 average production 760 bo

  9. Slide 9: Technology

    Technology • Drilling and completion technology is developing at an incredible pace, unlocking tight reservoirs Rock Seal Ball Port 9

  10. Slide 10: Exposure & Deal flow

    Exposure & Deal flow • Yangarra's exposure to plays like the Hoadley Glauconite is very significant • Main focus of the 2011 budget will be Glauconite and Cardium zones • Yangarra is still small enough to do the deals that bigger players cannot allocate resources to: • 2010: Added two locations for

  11. Slide 11: Core Areas (Alberta, Canada)

    Core Areas (Alberta, Canada) Central Alberta • Interest in 45 Sections of land • Focus area for 2011 capital budget Medicine Hat • Interest in 123 sections of land Jaslan • 40+ producing wells Edmonton Jaslan Central Alberta Rocky Mountain House Red Deer • Interest in 17+ sections of land Calgary Me

  12. Slide 12: Multi Zone Potential – Central Alberta

    Multi Zone Potential – Central Alberta Cardium 5m thick Second White Specks Colorado Group 30m thick 650m thick Viking 5m thick • Vertical production exists in all zones • All zones meet the Glauconitic criteria for 20m thick horizontal drilling Ellerslie 10m thick • 2011 capital budget Rock Creek i

  13. Slide 13: Impact of Liquids-Rich Gas

    Impact of Liquids-Rich Gas $10.00 $8.98/mcf Condensate Value $9.00 Butane Value $8.00 $1.62 Propane Value $7.00 Heating Value Adjust $1.60 Dry Gas $6.00 $/mcf $5.00 $1.12 $0.64 $4.00 $3.80/GJ $3.00 $2.00 $1.00 $0.00 Glauconite January 1, 2011 pricing on liquids 13

  14. Slide 14: Glauconite

    Glauconite R8 R7 R6 R5W5 VF U G Hoadley Glauconite Barrier F F F F E F E F G F FU F VV VVA UF I F V F G G G F UA F C FA G UC F F F G F E U C FV U F G F G F F FF FF GE U FC J F FU K E G E G G I E G F A EC F E F F V G GG F V F V F F F G F FF A F F F F J G E FA L G C F JC G K F U FU F F G U I U F L C I

  15. Slide 15: Glauconite – Generic Type Curves & Economics

    Glauconite – Generic Type Curves & Economics Note: Taken from Bonavista Energy Trust’s corporate presentation 15

  16. Slide 16: Cardium

    Cardium F I F F LF E EF F E E E FF F E I FE J E EF E F E E FC J E JE F C E I EI J E E FA E E I IE II E E E E E 15 % override on 11 AVG IP90 DLY CAL F F FF C F F E E C F F A EA E A E E E J AE F F F CFE F IE E EE A E JI I I D EE E EEI J J EI E I IEE IE E I J E I E EE F FE J 163 bopd (5 wells) F AVG IP

  17. Slide 17: Cardium – Generic Type Curves & Economics

    Cardium – Generic Type Curves & Economics Note: Taken from Bonavista Energy Trust’s corporate presentation 17

  18. Slide 18: Second White Specks

    Second White Specks F G GF FG F F C F I I F G F G E C F E J G F I CF ELIEF G EC F J G J F FG G F F J FF J Cumulative FG IN in F L Cumulative C in G CUMULATIVE IN F F F J F Silty SILTY G CUMULATIVE F AREA area 2200 Silty area SILTY AREA718 718 MMSTB OIL COil J MSTBF MSTB MSTB Oil F F J I FI A E F I G

  19. Slide 19: Hedging Program

    Hedging Program 2011 • 100 bbl/d @ $93.65 WTI/CAD for remainder on 2011 • 100 bbl/d @ $94.00 WTI/CAD for remainder on 2011 • 100 bbl/d in a collar from $95.00 – $113.00 WTI/CAD for remainder of 2011 • 100 bbl/d in a collar from $95.00 – $114.00 WTI/CAD for remainder of 2011 2012 • 100 bbl/d in a col

  20. Slide 20: Key Corporate Strategies

    Key Corporate Strategies • Lower operating costs through operational presence and cost efficiencies • Maintain control over infrastructure • Maximize netbacks with liquids rich targets • Maintain flexibility in implementation of new technology • Continue to grow drilling inventory through drilling,

  21. Slide 21: Summary

    Summary Strong asset base 1.00 / Share - NAV/Share (as at December 31, 2010) • Versus current share price of $0.71 Significant upside 131 Gross (78 Net) future drilling locations • NPV10 per well in the Glauconite = $4.5 Million • NPV10 per well in the Cardium = $3.7 Million 21

  22. Slide 22: Contact Information

    Contact Information Yangarra Resources Ltd. 1530, 715 – 5 Ave. SW Calgary, Alberta T2P 2X6 403-262-9558 22

Yangarra Resources — Investor Presentation (May 2011) on 6ix