Cullen Resources Limited · ASX:CUL
Cullen Resources — Investor Presentation (January 2015)
16 slides from Cullen Resources's investor presentation, January 2015

Slide 1: Zeroing In for Gold and Nickel Discoveries
ZEROING IN…… FOR GOLD AND NICKEL DISCOVERIES MT EUREKA, NE YILGARN - A FRONTIER GREENSTONE BELT CULLEN RESOURCES LIMITED INVESTOR UPDATE - JANUARY 2015 Chris Ringrose, Managing Director

Slide 2: Disclaimer
DISCLAIMER IMPORTANT NOTICE This presentation has been prepared by Cullen Resources Limited ACN 006 045 790 (Cullen) for general information purposes only. The presentation is not and should not be considered as an offer or invitation to subscribe for or purchase any securities in Cullen, or as an i

Slide 3: Cullen Properties – Iron Ore, Gold, Nickel, Tungsten
CULLEN PROPERTIES – IRON ORE, GOLD,NICKEL,TUNGSTEN Several Joint Ventures Managed by others

Slide 4: NE Yilgarn: Frontier Greenstone Belts for Gold and Nickel
NE YILGARN : FRONTIER GREENSTONE BELTS FOR GOLD AND NICKEL CULLEN’S MT EUREKA PROJECT AMONGST BELT OF ACTIVE EXPLORATION AND DISCOVERIES – GRUYERE (Au) – ASX:GOR ROSIE (Ni) – ASX:DKM CAMELWOOD (Ni) – ASX:RXL JULIUS (Au) – ASX:EAR HORSE WELL (Au) – ASX: AYR/DRM

Slide 5: Mt Eureka – Drill Ready Prospects for Gold and Nickel
Mt EUREKA – DRILL READY PROSPECTS FOR GOLD AND NICKEL NICKEL “AK47” prospect and ~40 strike km of ultramafics adjoining and north of Camelwood nickel sulphide discovery (Rox Resources) GOLD Southern prospect - structural complexity, interpreted intrusives, geochemical anomalies, drill intersections,

Slide 6: Mt Eureka Project – Aeromagnetic Image
MT EUREKA PROJECT - AEROMAGNETIC IMAGE AK 47 Nickel Prospect NICKEL - PLANNED EXPLORATION A3 Ground EM at “AK47” Central prospect, over “A3” Ultramafic bedrock conductor, and Package targetting base of ultramafics along strike of Irwin Well Camelwood (RXL)

Slide 7: Mt Eureka – Massive Nickel Sulphides Do Occur
MT EUREKA - MASSIVE NICKEL SULPHIDES DO OCCUR Previous discovery at AK47 PROSPECT – 0.2M @ 1.93 % Ni, 0.42% Cu, 0.7 g/t Pt+Pd (Hole GBD2) MASSIVE SULPHIDE ? REMOBILISED FROM NEARBY SOURCE KOMATIITE

Slide 8: Mt Eureka – AK47 Priority 1 Nickel Sulphide Target
MT EUREKA - AK47 ……….PRIORITY 1 , NICKEL SULPHIDE TARGET Ni > 1% over 0.1-0.2m in holes GBD 2,3 and 4 GBD 2-7 Proposed ground EM – 2 x 1km

Slide 9: Gold – Mt Eureka Greenstone Belt Proposed Exploration
MT EUREKA GREENSTONE BELT GOLD – PROPOSED EXPLORATION Systematic RAB/air core and focused RC drilling south from Southern under cover, targeting interface/buried laterite for geochem sample and bedrock for geology, alteration and geochem

Slide 10: Mt Eureka – Southern (South) Priority 1 Gold Target
MT EUREKA – SOUTHERN (SOUTH)……PRIORITY 1, GOLD TARGET (Camp scale gold targets / structural 7m @ 9.0g/t Au, & complexity / geochem / cover) 9m @ 6.2g/t Au 7m @ 6.7g/t Au Limited drilling through transported cover First priority targets – NE shears and NW-SE shears/thrusts under channel

Slide 11: West Pilbara Iron Ore Project (Stage 1) – Momentum Building
WEST PILBARA IRON ORE PROJECT (WPIOP – Stage 1) – MOMENTUM BUILDING Cullen has a key stake (30% contributing interest) in the Mt Stuart Iron Ore JV as part of WPIOP – Stage 1 Entry of Baosteel with Aurizon adds further credibility to development scenario for WPIOP Other development partners in

Slide 12: Mt Stuart Iron Ore JV Project – Cullen 30%
MT STUART IRON ORE JV PROJECT – CULLEN 30% Major Proposed Development in the West Pilbara by APIJV Aurizon seeking to develop an infrastructure solution for the West Pilbara Iron Ore Project – Stage 1 - (a proposed 40Mtpa operation, being developed by the APIJV (Baosteel – Aurizon 50% / AMCI – POSCO

Slide 13: Catho Well CID Ore – Al2O3 and P Levels Attractive
Catho Well CID ore – Al2O3 and P levels attractive for blended product Catho Well CID Cullen - 30% owner of Catho Well Channel Iron deposit (CID) part of proposed WPIOP – Stage 1 in JV with API API - shareholders via APIJV are: Baosteel - major Chinese steel producer Aurizon - major Australian infra

Slide 14: Mt Stuart Iron Ore JV – Feasibility and Project Timeline
MT STUART IRON ORE JV – FEASIBILITY AND PROJECT TIMELINE 2015 TRANSFORMATIONAL YEAR Revenue Generation 2014 2015 2016 from mining operations Ap ril S ep Jan S ep Feb Dec Dec June Mar Oct Oct Aug May Ju ly Nov Nov IFA between Baosteel, AMCI, Resource Mine-gate sale price Posco & Aurizon announced Est

Slide 15: Investment Summary and Cullen Corporate
INVESTMENT SUMMARY AND CULLEN CORPORATE ASX:CUL ADVANCING EXPLORATION FOR DIRECTORS NICKEL AND GOLD AT 100% Dr Denis Clarke - Chairman OWNED MT EUREKA PROJECT – Dr Chris Ringrose - MD FRONTIER GREENSTONE BELT , Mr Grahame Hamilton - Non Exec NE YILGARN Mr John Horsburgh - Non Exec Mr Wayne Kernaghan

Slide 16: Thank You
THANK YOU Chris Ringrose 0439 843 756 cullen@cullenresources.com.au www.cullenresources.com.au ATTRIBUTION – COMPETENT PERSON STATEMENT Information in this presentation may reflect past exploration results, and Cullen’s assessment of exploration completed by past explorers, which was first prepared
Source: Internet Archive copy of cullenresources.com.au
More decks from Cullen Resources Limited
Shareholder Meeting (November 2026)19 slides · Nov 17, 2026
Shareholder Meeting (November 2025)21 slides · November 2025
Shareholder Meeting (November 2024)18 slides · Nov 21, 2024
Investor Presentation (June 2024)19 slides · June 2024
Investor Presentation (August 2023)19 slides · Aug 31, 2023
Investor Presentation (June 2023)20 slides · Jun 26, 2023