Haranga Resources Limited · ASX:HAR

Haranga Resources — Mongolia 2013 Investment Summit – Hong Kong

15 slides from Haranga Resources's conference presentation, November 2013

  1. Slide 1: From Successful Exploration to Developing a Mine

    Slide 1: From Successful Exploration to Developing a Mine

    From Successful Exploration to Developing a Mine (Selenge Iron Ore Project) ERDENE Mongolia 2013 Investment Summit – Hong Kong Managing Director November, 2013 1

  2. Slide 2: Selenge Project Development Path

    Slide 2: Selenge Project Development Path

    Selenge Project Development Path Production Construction Feasibility Study Mining License JORC Resource Exploration 2010 – 2012 2013 2013 2013 - 2014 2014 - 2015 2016 • Successfully • Measured and • Defining a Reserve • Hydro-geological Study & Drilling • Detailed Mine Plan completed Indicated JORC

  3. Slide 3: Contents

    Slide 3: Contents

    Contents 1. Resource and Growth Potential 2. Location and Infrastructure 3. Key Milestones and Performance 4. Test Results and Product Quality 5. Project Feasibility and Preliminary Valuation 3

  4. Slide 4: JORC Compliant Resources and Exploration Summary

    Slide 4: JORC Compliant Resources and Exploration Summary

    JORC Compliant Resources and Exploration Summary Drilling programs /Million tons; Cut-off = 12.5% Fe/ TOTAL (2011-2012) MEASURED INDICATED Exploration 45,986 (HQ, NQ - core), meters Geotechnical and Metallurgical 567 (PQ - bulk), meters Hydro-geological Study 1,347 Dund Bulag 96.4 103.5 199.9 (RC),

  5. Slide 5: The largest JORC compliant Resource in Mongolia

    Slide 5: The largest JORC compliant Resource in Mongolia

    The largest JORC compliant Resource in Mongolia RESERVES Million tons TUMURTEI 229 TUMURTEI OTHER 19% 25% BAYANGOL 124 BAYANGOL BAYANTSOGT (HARANGA) 254 10% TAYAN-NUUR 88 [CATEGORY NAME] [PERCENTAGE] BEREN 84 EREEN 6% EREEN 67 BEREN 7% TAYAN-NUUR [CATEGORY DARTSAGT 53 7% NAME] [PERCENTAGE] OTHER 330

  6. Slide 6: Potential Exploration Upside: Identified Drill Targets

    Slide 6: Potential Exploration Upside: Identified Drill Targets

    Potential Exploration Upside: Identified Drill Targets 6

  7. Slide 7: Project located in Darkhan-Selenge iron ore development region

    Slide 7: Project located in Darkhan-Selenge iron ore development region

    The Project is located in Mongolia’s premier iron ore development region of Darkhan - Selenge with excellent access to the main trans-Mongolian Rail line & nearby spurs 7

  8. Slide 8: Neighboring Eruu Gol Mine – A 5Mtpa Export Operation

    Slide 8: Neighboring Eruu Gol Mine – A 5Mtpa Export Operation

    The neighboring iron ore mine: Eruu Gol Mine – A 5Mtpa Export Operation 8

  9. Slide 9: Key milestones and Performance

    Slide 9: Key milestones and Performance

    Key milestones and Performance 1. Metallurgical Pilot Test  Laboratory scale Davis Tube Recovery test and Progressive Grind test works are completed  Desktop and Gap analysis are completed  Representative bulk samples for testing are prepared o Final stage of selecting a contractor for the pilot

  10. Slide 10: Lab Scale DTR Test Work

    Slide 10: Lab Scale DTR Test Work

    Lab Scale DTR Test Work Summary Results of Davis Tube Recovery (DTR) and Progressive Grind Test (Average for 60 Representative Samples, 100% Passing) Average Concentrate Quality (75µm) Average Concentrate Quality (150µm) Fe SiO2 Al2O3 S P Fe SiO2 Al2O3 S P Deposits Deposits % % % % % % % % % % Bayan

  11. Slide 11: Key milestones and Performance

    Slide 11: Key milestones and Performance

    Key milestones and Performance 1. Mining License Application  Pre-FS and Reserves (Technical) reports are completed  The registration of the Reserves by the Minerals Council of Mongolia, which is the most important and necessary condition for applying for a ML is completed  A full scale topograph

  12. Slide 12: Pit Design & Optimization: Dund Bulag deposit

    Slide 12: Pit Design & Optimization: Dund Bulag deposit

    Pit Design & Optimization: Example: Dund Bulag deposit Delineation of Ore Open Pit Design Options to start the initial mine operation:  Dundbulag deposit where lower stripping ratio of as low as 0.5:1 with a massive ore body outcropping from the ground surface; OR  Bayantsogt deposit where higher

  13. Slide 13: Selenge Project Estimated Value

    Slide 13: Selenge Project Estimated Value

    Selenge Project Estimated Value The Summary Results of the Independent TE Assessment of the Selenge Iron Ore Project (12.5% Discount Rate, US$131.5/t Price for Concentrate, 150µ scenario) Annual Tonnage Mine Life Cash Cost IRR Concentrate CAPEX NPV JORC (Mln (LOM, (AU$ per (%, Production (AU$ Mln) (

  14. Slide 14: Summary

    Slide 14: Summary

    Summary The JORC Code Compliant Resource:  The largest internationally recognized JORC compliant Resource in Mongolia  The ideal location in the premier iron ore development region in Mongolia  Necessary base for delineating and estimating Proven and Probable Ore Reserves for developing a Mine 

  15. Slide 15: Competent Persons’ Statements and Disclaimers

    Slide 15: Competent Persons’ Statements and Disclaimers

    Competent Persons’ Statements and Disclaimers The technical information contained in this presentation in relation to the JORC Compliant Resource for the Selenge Project has been reviewed by Mr Peter Ball of DataGeo Ltd, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Ball