Haranga Resources Limited · ASX:HAR
Haranga Resources — Mongolia 2013 Investment Summit – Hong Kong
15 slides from Haranga Resources's conference presentation, November 2013

Slide 1: From Successful Exploration to Developing a Mine
From Successful Exploration to Developing a Mine (Selenge Iron Ore Project) ERDENE Mongolia 2013 Investment Summit – Hong Kong Managing Director November, 2013 1

Slide 2: Selenge Project Development Path
Selenge Project Development Path Production Construction Feasibility Study Mining License JORC Resource Exploration 2010 – 2012 2013 2013 2013 - 2014 2014 - 2015 2016 • Successfully • Measured and • Defining a Reserve • Hydro-geological Study & Drilling • Detailed Mine Plan completed Indicated JORC

Slide 3: Contents
Contents 1. Resource and Growth Potential 2. Location and Infrastructure 3. Key Milestones and Performance 4. Test Results and Product Quality 5. Project Feasibility and Preliminary Valuation 3

Slide 4: JORC Compliant Resources and Exploration Summary
JORC Compliant Resources and Exploration Summary Drilling programs /Million tons; Cut-off = 12.5% Fe/ TOTAL (2011-2012) MEASURED INDICATED Exploration 45,986 (HQ, NQ - core), meters Geotechnical and Metallurgical 567 (PQ - bulk), meters Hydro-geological Study 1,347 Dund Bulag 96.4 103.5 199.9 (RC),

Slide 5: The largest JORC compliant Resource in Mongolia
The largest JORC compliant Resource in Mongolia RESERVES Million tons TUMURTEI 229 TUMURTEI OTHER 19% 25% BAYANGOL 124 BAYANGOL BAYANTSOGT (HARANGA) 254 10% TAYAN-NUUR 88 [CATEGORY NAME] [PERCENTAGE] BEREN 84 EREEN 6% EREEN 67 BEREN 7% TAYAN-NUUR [CATEGORY DARTSAGT 53 7% NAME] [PERCENTAGE] OTHER 330

Slide 6: Potential Exploration Upside: Identified Drill Targets
Potential Exploration Upside: Identified Drill Targets 6

Slide 7: Project located in Darkhan-Selenge iron ore development region
The Project is located in Mongolia’s premier iron ore development region of Darkhan - Selenge with excellent access to the main trans-Mongolian Rail line & nearby spurs 7

Slide 8: Neighboring Eruu Gol Mine – A 5Mtpa Export Operation
The neighboring iron ore mine: Eruu Gol Mine – A 5Mtpa Export Operation 8

Slide 9: Key milestones and Performance
Key milestones and Performance 1. Metallurgical Pilot Test Laboratory scale Davis Tube Recovery test and Progressive Grind test works are completed Desktop and Gap analysis are completed Representative bulk samples for testing are prepared o Final stage of selecting a contractor for the pilot

Slide 10: Lab Scale DTR Test Work
Lab Scale DTR Test Work Summary Results of Davis Tube Recovery (DTR) and Progressive Grind Test (Average for 60 Representative Samples, 100% Passing) Average Concentrate Quality (75µm) Average Concentrate Quality (150µm) Fe SiO2 Al2O3 S P Fe SiO2 Al2O3 S P Deposits Deposits % % % % % % % % % % Bayan

Slide 11: Key milestones and Performance
Key milestones and Performance 1. Mining License Application Pre-FS and Reserves (Technical) reports are completed The registration of the Reserves by the Minerals Council of Mongolia, which is the most important and necessary condition for applying for a ML is completed A full scale topograph

Slide 12: Pit Design & Optimization: Dund Bulag deposit
Pit Design & Optimization: Example: Dund Bulag deposit Delineation of Ore Open Pit Design Options to start the initial mine operation: Dundbulag deposit where lower stripping ratio of as low as 0.5:1 with a massive ore body outcropping from the ground surface; OR Bayantsogt deposit where higher

Slide 13: Selenge Project Estimated Value
Selenge Project Estimated Value The Summary Results of the Independent TE Assessment of the Selenge Iron Ore Project (12.5% Discount Rate, US$131.5/t Price for Concentrate, 150µ scenario) Annual Tonnage Mine Life Cash Cost IRR Concentrate CAPEX NPV JORC (Mln (LOM, (AU$ per (%, Production (AU$ Mln) (

Slide 14: Summary
Summary The JORC Code Compliant Resource: The largest internationally recognized JORC compliant Resource in Mongolia The ideal location in the premier iron ore development region in Mongolia Necessary base for delineating and estimating Proven and Probable Ore Reserves for developing a Mine

Slide 15: Competent Persons’ Statements and Disclaimers
Competent Persons’ Statements and Disclaimers The technical information contained in this presentation in relation to the JORC Compliant Resource for the Selenge Project has been reviewed by Mr Peter Ball of DataGeo Ltd, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Ball
Source: Internet Archive copy of haranga.com
More decks from Haranga Resources Limited
Investor Presentation (November 2026)31 slides · Nov 9, 2026
Technical Presentation (May 2026)20 slides · May 25, 2026
Investor Presentation (November 2025)33 slides · Nov 20, 2025
Corporate Update (September 2025)9 slides · Sep 23, 2025
Merger or Acquisition (May 2025)20 slides · May 12, 2025
Investor Presentation (July 2024)12 slides · July 2024