Slide 1: Lincoln Permitting Presentation
23th September 2025 LINCOLN PERMITTING PRESENTATION Haranga is pleased to present the summary of a report on the permitting status of the Lincoln Gold Project prepared by Compass Land Group who are based in California and specialise in land use permitting in the state of California. Globally, permit
Slide 2: Lincoln Gold Project: Established and Production Ready
Lincoln Gold Project Established and Production Ready MINING PERMIT STATUS -SEPTEMBER 2025 Prepared by: ASX: HAR & FRA: 65E0 1
Slide 3: Project Overview
Project Overview • Located in California’s Mother Lode Belt CAUTIONARY STATEMENT The Mineral Resource estimates relating to the • Exceptional high-grade Lincoln Gold Project contained in this announcement have been prepared in resource accordance with Canadian National Instrument 43-101 (“NI-43-101”
Slide 4: Existing Infrastructure
Existing Infrastructure • Processing plant (315 ktpa capacity) • Underground decline 880m • Development drive 900m • Workshops • Offices Photographs: Infrastructure at the Lincoln Gold Project. 3
Slide 5: Key Foundational Permits In-Place
Key Foundational Permits In-Place CONDITIONAL USE PERMIT (CUP) & RECLAMATION PLAN 1. California’s mining law, the Surface Mining and Reclamation Act, requires a CUP and reclamation plan prior to mining. [California Public Resources Code §§ 2710 et seq.] 2. The CUP and Reclamation Plan are issued by
Slide 6: Additional Key Environmental Permits Secured
Additional Key Environmental Permits Secured WASTE DISCHARGE REQUIREMENTS STORMWATER DISCHARGE PERMIT (WDRS) 1. Issued by the State Water Resources Control Board. 1. Issued by the State Water Resources Control Board. [California Water Code §§13260 et seq.] [Water Board Order 2014-0057-DWQ] 2. Requir
Slide 7: Ancillary Environmental Permits
Ancillary Environmental Permits 404 PERMIT WATER QUALITY LAKE & STREAMBED ALT. CERTIFICATION AGREEMENT [CLEAN WATER ACT §404] [CLEAN WATER ACT §401] [CA F&G CODE §1602] Issued by U.S. Army Corps of Engineers for impacts to federal waters Issued by Regional Water Board in connection with Issued by CA
Slide 8: Strategic Advantage of Lincoln Gold Project
Strategic Advantage of Lincoln Gold Project ✓ Key Foundational Permits In-Place o California-compliant use permit (CUP) and mining reclamation plan in place o Waste discharge and stormwater permits in place o Remaining ancillary environmental permits do not present an entitlement schedule risk ✓Esta
Slide 9: Disclaimer