Goldquest Mining Corp. · TSXV:GQC

Goldquest Mining — Investor Presentation (March 2025)

22 slides from Goldquest Mining's investor presentation, Mar 17, 2025

  1. Slide 1: An Emerging Mine Developer with Exploration Upside

    An Emerging Mine Developer with Exploration Upside DOMINICAN REPUBLIC www.goldquestcorp.com MARCH 2025

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS Statements contained in this presentation that are not historical facts are forward-looking information that involves known and unknown risks and uncertainties. Forward-looking statements in this presentation include, but are not limited to, statements with respect to the

  3. Slide 3: Romero Project Location

    ROMERO PROJECT LOCATION The Dominican Republic  Romero is strategically positioned to benefit from DR’s robust economic growth, political stability, and strong institutional support for responsible mining. www.goldquestcorp.com | 3

  4. Slide 4: GoldQuest (GQC.V)

    GOLDQUEST (GQC.V) Developing the Romero Discovery  World-class Au/Cu discovery (2012) with multi-million-ounce potential.  Latest PFS Nov. 2016: 28% IRR, NPV (5%) US$202 million  2025 Milestones: Advance of ESIA and BFS for completion in Q1- 2026. Exploring – Unlocking the Next Major Discovery 

  5. Slide 5: Management Team and Board of Directors

    MANAGEMENT TEAM BOARD OF DIRECTORS Veteran Team with DR Experience Technical & Financial Expertise Luis Santana, CEO Bill Fisher, Non-Executive Chairman - P.Geo • Former CEO Cardinal Namdini – Ghana • Former CEO Globestar, Chairman Aurelian and • Former CEO Veladero – Argentina VP Exploration of Bol

  6. Slide 6: Our Focus

    OUR FOCUS Commitment to Social & Community Development  Strengthening relationships with local communities through sustainable initiatives.  Sponsoring the province’s eco-tourism development plan, fostering economic diversification.  Leading a reforestation program for the San Juan River catchmen

  7. Slide 7: Our Focus

    OUR FOCUS Advancing the Romero Project – BFS  Developing a streamlined, scalable mining plan – a 7 Mt reserve with a simple, efficient “starter mine” approach.  Higher gold prices present significant upside potential beyond the existing mine plan.  Select and contract an engineering consultant to

  8. Slide 8: Geotech ZTEM System Resistivity

    GEOTECH ZTEM SYSTEM RESISTIVITY Depth Image www.goldquestcorp.com | 8

  9. Slide 9: Romero Mine Gold-Copper Starter Mine

    ROMERO MINE Gold-Copper Starter Mine only considers 35% of current M&I Resource Surface Portal Ventilation Access Ramp View Looking North Production Ramp  2,800 tpd – 75% Longhole  Large Stopes (up to 20m x 20m x 50m) Remaining Mineral Resources  Options to expand mine as metal prices rise www.go

  10. Slide 10: The Romero Project: Responsible Mine Design

    THE ROMERO PROJECT PFS: Responsible Mine Design Minimal Surface Impact  Small surface footprint over underground mine, thus minimal affect on landscape Return Wasterock Underground  65% of waste rock will be returned underground as backfill No use of Cyanide  A gold/copper concentrate product wil

  11. Slide 11: Goldquest's Romero Gold/Copper Mine Prefeasibility Study

    GOLDQUEST’S ROMERO GOLD/COPPER MINE Prefeasibility Study (to be upgraded in BFS) NPV*5% IRR* AISC* PAYBACK $203M 28% $595/OZ 2.5 YRS AFTER TAX AuEq.** HOLE LTP-94 158.6m to 160.0m 288.6 g/t Gold 5.6% Copper Polished Core  Currently in the permitting phase * Net Present Value (“NPV”), Internal Rate

  12. Slide 12: Romero Mine 2016 PFS Highlights

    ROMERO MINE 2016 PFS Highlights Low Capex, High IRR, Scalable Deposit After-Tax NPV & IRR Sensitivity to Gold Price PFS Summary Results At US$1300 Au / US$2.50.lb Cu After Tax NPV5% After Tax IRR Start-Up CAPEX $158M $350 35% Sustaining CAPEX $92M $300 30% After Tax NPV5% (US$M) Throughput 2,800 tpd

  13. Slide 13: Mineral Reserve & Resource Estimate

    Mineral Reserve & Resource Estimate Romero Mineral Reserve Estimate Mine Reserves Tonnes Au Ag Cu Au Eq(1) (Cutoff $70 (g/t) (oz) (g/t) (oz) (%) (M lb) (g/t) (oz) NSR)(2) Total Probable 7,031,000 3.72 840,000 4.33 980,000 0.88 136 4.9 1,117,000 (1) Au equivalent metal prices: Au $1,300/oz Cu $2.50/l

  14. Slide 14: Exploration

    EXPLORATION Tireo Belt Concessions Romero Project The Romero Project is only part of GoldQuest’s emerging Tireo Mining District www.goldquestcorp.com | 14

  15. Slide 15: Ongoing Exploration Program

    Ongoing Exploration Program Exploration Stage Resource Definition Advanced Exploration Target Definition

  16. Slide 16: The Tireo Belt, Targets, Hydrothermal Alterations, & Core Intersections Highlights

    The Tireo Belt, Targets, Hydrothermal Alterations, & Core Intersections Highlights

  17. Slide 17: Ongoing Exploration Program

    ONGOING EXPLORATION PROGRAM Exploring the Tireo Belt Romero Deposit Romero South Deposit  Targets occur along the mineralized trend hosting the Cachimbo Discovery and the Romero Deposits  These deposits occur in clusters along plate boundaries – we are on the Atlantic/Caribbean boundary IP Chargea

  18. Slide 18: Potential Along the 50 km Tireo Project

    POTENTIAL ALONG THE 50 KM TIREO PROJECT How does Romero help to find more Gold? RESISITIVITY MAG MAPPING IP CHARGEABILITY RHYOLITES+ LOW LOW ALTERATION HIGH ROMERO ROMERO SOUTH

  19. Slide 19: GoldQuest's Cachimbo Discovery

    GOLDQUEST’S CACHIMBO DISCOVERY Romero style mineralization – Open in all Directions Surface sample: 168 g/t gold ?? 5 m @ 14 g/t gold, 12% zinc, 74 g/t silver 1% copper 21m @ 7.9 g/t gold 100 metres 1.8% zinc, 40 g/t silver 0.17% copper ?? www.goldquestcorp.com | 18

  20. Slide 20: Gold-Rich VMS Clan

    Gold-Rich VMS Clan 167.5 g/t Au at surface Au Zn-Au Au Au Cachimbo Zn-Au Discovery Cu-Au Romero Project Cu-Au Cu-Au www.goldquestcorp.com | 20 Image modified from Dubé, B; Gosselin, P; Mercier-Langevin, P; Hannington, M; Galley, 2007. Mineral deposits of Canada: a synthesis of major deposit-types, d

  21. Slide 21: Development: Permitting a Mine in the Dominican Republic

    DEVELOPMENT Permitting a Mine in the Dominican Republic Exploitation License Environmental License Mine Closure Approval & Rehabilitation Application Process 2015 - 2016 - Q1 - 25 / Q2 - 26 / TBD Q2 - 26 Q4 - 27 2016 2005 – Present Q2 - 26 2012 Pre-Feasibility Study Env. & Social, Mine (PFS) Impact

  22. Slide 22: Thank You

    Thank You Share Information Contact Information Market Capitalization** ~C$106.8 M Corporate Head Office GoldQuest Mining Corp. Shares Outstanding Ave. Gustavo Mejia Ricart 102, Edif. (Basic) 305,226,336 Corporativo 2010, Suite 302, SD, RD. Shares Outstanding Telephone: (809) 385-2222 (Fully Diluted

GoldQuest Mining — Investor Presentation (March 2025) on 6ix